Download presentation
Presentation is loading. Please wait.
1
TGs Denver Closing Report
May 2008 doc.: IEEE P /682r2 July 2008 TGs Denver Closing Report Date: Authors: Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola
2
May 2008 doc.: IEEE P /682r2 July 2008 Abstract Report of TGs, ESS Mesh Networking Task Group, to the July 2008 (Denver, Colorado) closing Plenary. TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola
3
TGs Closing Plenary Report
May 2008 doc.: IEEE P /682r2 July 2008 TGs Closing Plenary Report Having failed LB #126, TGs is proceeding to improve its D2.0 Draft by working on resolving the comments it has received. The current comment resolution spread sheet is 11-08/493r17. 802.11s D2.01 and D2.01 redline, showing all comment resolutions through the end of the Jacksonville meeting except for a couple of extensive Editorial comments, are in the members area of the web site. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola
4
TGs Closing Plenary Report
May 2008 doc.: IEEE P /682r2 July 2008 TGs Closing Plenary Report TGs will be holding an ad hoc (previously approved by the WG): 3-5 September 2008 in Līhu‘e, Kaua‘I, Hawai‘i, to work on comment resolution. An annotated agenda for TGs at this meeting is available in 11-08/701r10. The draft minutes will be posted shortly as 11-08/835r0. Goal for the September TGs meeting in Waikoloa, Hawai‘i: Resolve Letter Ballot comments. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola
5
July 2008 End of Report Donald Eastlake 3rd, Motorola
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.