1 Second Stakeholder Expert Group meeting 19-20/01/2012
Work planning for the review process Scott Brockett Unit, Industrial Emissions, Air Quality and Noise

2 Objectives 6EAP objective (2002) ‘to attain levels of air quality that do not give rise to significant negative impacts on, or risks to, human health and the environment’ Europe 2020 objectives Maximising climate co-benefits Integrated assessment modelling Baseline includes climate measures Climate impact of action on air pollutants (ozone, BC/EC, NOx, SO2), biomass combustion integrated into analysis Research review will examine co-benefits, tradeoffs, AQ impact of climate change Stimulating innovation Identify key contributing sectors and scope for reduction; integrate into EU innovation programmes Resource efficiency Mobility, construction, food 2

3 Translating objectives into standards
Magnitude of the air quality health and ecosystem problems in Europe Update of health pollutants and their effects – WHO (research review) Ecosystem effects – EMEP/WGE Current and projected concentrations/depositions – EEA, ENV pollutant contracts, IIASA Health and environmental outcomes – IIASA, CCE Level of protection implied by current standards Prospects for compliance 2020, 2025, 2030 – IIASA, ENV contracts Extent of gap closure represented - IIASA Adjustments needed Simplification and focus (gaps (e.g. ecosystems), rationalisation, health relevance) – WHO, ENV contracts Ambition – IIASA (costs and benefits (including climate change implications), timescales, measures) Flexibility (nature of standards, derogations) – ENV contracts 3

4 Measures Hemispheric, regional, national/local burden of pollution – IIASA, JRC, HTAP contract, ENV pollutant contracts Cost-effective control options and impacts EU level NEC Directive emission ceilings Measures on road, non-road, shipping (technical controls, structural changes) Measures on combustion (IED, small-scale combustion), other IED sectors Measures on agriculture International level Hemispheric or even global control requirements Available international initiatives National and local level Database of measures - PM workshop, ENV pollutant contracts Integrate into ongoing initiatives, outline additions 4

5 Management framework Monitoring siting and density
Review of MS networks – ENV pollutant contracts, EEA Develop and assess options for further macro and micro siting criteria, adjustment of compliance reporting, co-ordination with EMEP, reference techniques – AQUILA Modelling Review of modelling practices in the MSs – ENV, FAIRMODE Develop and assess options for criteria on input quality (emission inventories), output resolution, etc – FAIRMODE Develop options for use in compliance assessment Assessment – averaging over three years, reporting for area of representativeness – ENV pollutant contracts Management Sensitive groups, Art 23 Action plans – ENV pollutant contracts Short-term action plans – specific ENV contract Public information Review use of AQ indices and develop options 5

6 Next steps Planning for forthcoming SEGs
Interim results from IA work under each of the above headings Preliminary options management framework – June/July standards and measures – October Second stakeholder consultation autumn 2012 Short-term Comments on presentations/documents by 3/2/2012 February – report and online access to Final EC4MACS baseline emission scenario March-September – MSs to take up contact with IIASA on GAINS emission calculations, liaise with energy colleagues in preparation of PRIMES 2012 6