Presentation is loading. Please wait.

Presentation is loading. Please wait.

STREETS FOR PEOPLE: FROM PAGE TO PAVEMENT.

Similar presentations


Presentation on theme: "STREETS FOR PEOPLE: FROM PAGE TO PAVEMENT."— Presentation transcript:

1 STREETS FOR PEOPLE: FROM PAGE TO PAVEMENT

2 REASONS FOR THE COMPENDIUM:
Dominance of car orientated street designs Conventional street designs applied in new developments Perception that standards and regulations prevent innovation

3 OBJECTIVES: To encourage and assist good street design, focusing on people To make the design and approval of innovative pedestrian and cycling friendly streets easier

4 STREETS FOR PEOPLE COMPENDIUM
THE PROCESS

5 STREETS FOR PEOPLE COMPENDIUM
CONTENT

6 A street is a movement conduit.
STREETS FOR PEOPLE COMPENDIUM THE LINK AND PLACE APPROACH A street is a movement conduit.

7 A street is also a place, a destination in its own right
STREETS FOR PEOPLE COMPENDIUM THE LINK AND PLACE APPROACH A street is also a place, a destination in its own right

8 THE LINK AND PLACE APPROACH
STREETS FOR PEOPLE COMPENDIUM THE LINK AND PLACE APPROACH COMPETING DESIGN OBJECTIVES: For movement: minimise commute time For place: extend dwell time

9 THE LINK AND PLACE APPROACH
STREETS FOR PEOPLE COMPENDIUM THE LINK AND PLACE APPROACH Traditional approaches to classification addressed movement needs alone. PRIMARY URBAN DISTRIBUTOR Strategic significance URBAN DISTRIBUTOR PRIMARY ACCESS ROUTE SECONDARY ACCESS ROUTE Local DESTINATION ROUTE MOVEMENT

10 THE LINK AND PLACE APPROACH
STREETS FOR PEOPLE COMPENDIUM THE LINK AND PLACE APPROACH Strategic significance P1 P2 P3 P4 P5 Local PLACE M1 Strategic significance Expanding street classification to also consider places. Just like there are various types of movement needs, there are various types of places too. Various street types can be plotted within this classification system. M2 M3 M4 Local M5 MOVEMENT

11 THE LINK AND PLACE APPROACH
STREETS FOR PEOPLE COMPENDIUM THE LINK AND PLACE APPROACH Metro District Municipal Neighbourhood Local P1 P2 P3 P4 PLACE P5 A sophisticated, yet logical and simple classification system. Metro M1 District M2 Municipal M3 Neighbourhood M4 Local M5 MOVEMENT

12 SETTING DESIGN PRINCIPLES
STREETS FOR PEOPLE COMPENDIUM SETTING DESIGN PRINCIPLES

13 THE LINK AND PLACE APPROACH
Established international concept, applied in many international and Australian cities. 2004 2007 2008 2007 2010 2010 2012 2012 2012 2013 2015 2016 2017

14 SETTING DESIGN PRINCIPLES
STREETS FOR PEOPLE COMPENDIUM SETTING DESIGN PRINCIPLES

15 NEW CLASSIFICATION Current day time links
STREETS FOR PEOPLE COMPENDIUM NEW CLASSIFICATION Current day time links Strategic future day time links M+P can be used to underpin future network strategy. Legend

16 NEW CLASSIFICATION Current day time places
STREETS FOR PEOPLE COMPENDIUM NEW CLASSIFICATION Current day time places Strategic future day time places M+P can be used to underpin future network strategy. Legend

17 NEW CLASSIFICATION Current night time places
STREETS FOR PEOPLE COMPENDIUM NEW CLASSIFICATION Current night time places Strategic future night time places Legend M+P can be also used to assess problems and needs and ‘health’ of the neighbourhoods.

18 SETTING DESIGN PRINCIPLES
STREETS FOR PEOPLE COMPENDIUM SETTING DESIGN PRINCIPLES Classification system Designations Evaluation and appraisal Design principles Setting design parameters Engagement

19 TRANSFORMATIONAL PROJECTS - EFFORT
POLITICAL COMPLEXITY TECHNICAL DIFFICULTY DESIGN GUIDANCE STRATEGY DOCUMENTS PROJECTS / CHANGE ON THE GROUND

20 APPLYING TO BOWDEN DEVELOPMENT
STREETS FOR PEOPLE COMPENDIUM APPLYING TO BOWDEN DEVELOPMENT

21 APPLYING TO BOWDEN DEVELOPMENT
STREETS FOR PEOPLE COMPENDIUM APPLYING TO BOWDEN DEVELOPMENT

22 BOWDEN DEVELOPMENT

23 BOWDEN DEVELOPMENT

24 BEFORE BANK STREET

25 BANK STREET

26 BANK STREET

27 BANK STREET

28 BEFORE PROSPECT ROAD

29 PROSPECT ROAD

30 CITY BIKEWAYS

31 CITY BIKEWAYS

32

33 OBSERVATIONS CITY BIKEWAYS
Strategy aside, each project requires its own rationalisation and decision making Community’s feedback is key to success, but can’t be preempted Views change with time > introduce change incrementally if you need to Involve community in strategic decision making Be prepared for a rough ride! CITY BIKEWAYS

34 CITY BIKEWAYS - ENGAGEMENT
DESIGN CHARETTES DESIGN OPTIONS DEMONSTRATION SITE WORKSHOPS ON-LINE DISCUSSION FORUMS EVENTS AT THE DEMO SITE INVOLVING USERS AND INDUSTRY BIKEWAYS SUMMIT DOOR KNOCKING INTERVIEWS

35 SIXTH STREET, MURRAY BRIDGE

36 SIXTH STREET, MURRAY BRIDGE
OBSERVATIONS Investment in public realm is not supported by everyone: there will always be questions around better use of the funds and impacts of change Community capacity building is important to inform decision making Stick to the vision and prepare for a rough ride! SIXTH STREET, MURRAY BRIDGE

37 REDESIGN DEMONSTRATION TOURS

38 AFTER SIXTH STREET, MURRAY BRIDGE

39 AFTER SIXTH STREET, MURRAY BRIDGE

40 BEFORE SIXTH STREET, MURRAY BRIDGE

41 AFTER SIXTH STREET, MURRAY BRIDGE

42 SIXTH STREET, MURRAY BRIDGE

43 SIXTH STREET, MURRAY BRIDGE

44 WHAT’s IMPORTANT? RECOGNISE THE POLITICAL COMPLEXITY
SOMETIMES INCREMENTAL CHANGE MAY BREAK DOWN THE BARRIERS TACKLE BARRIERS FROM MANY ANGLES BUILD CAPACITY MAKE AS MANY FRIENDS AS POSSIBLE YOU WILL NEVER WIN ON ALL ACCOUNTS, AS VIEWS VARY TIME CHANGES VIEWS COMMIT TO VISION AND CHANGE STICK WITH IT

45 THANK YOU!


Download ppt "STREETS FOR PEOPLE: FROM PAGE TO PAVEMENT."

Similar presentations


Ads by Google