1 TGad Editor Report Date: 2011-03-13 Authors: March 2011 April 2007
doc.: IEEE /0570r0 March 2011 TGad Editor Report Date: Authors: Carlos Cordeiro, Intel Corporation Eldad Perahia, Intel Corporation

2 Draft update and next steps
March 2011 Draft update and next steps TGad draft D1.2 released on March 01, 2011 D1.2 = D1.1 + speculative implementation of all technical and editorial comments resolved since the January/11 mtg All comments as part of LB168 have now been resolved and implemented into D1.2 D1.2 has gone has gone through an editorial review by TGad’s editorial panel before its release Goals for this mtg with respect to the draft Approve creation of D2.0 on the basis of D1.2 Start a recirculation LB on D2.0 Carlos Cordeiro, Intel Corporation

3 March 2011 LB168 update (10/1220r21) Editorial comments were resolved by Editor and reviewed by the editorial panel The latest comment database is /1220r21, and contains the resolution to all comments Technical Editorial Totals Resolved Open PHY 42 23 65 MAC 509 406 915 BF 24 34 58 Others 95 96 191 670 559 1229 Carlos Cordeiro, Intel Corporation

4 Report for January 2011 January 2011
Carlos Cordeiro, Intel Corporation

5 Draft update and schedule
January 2011 Draft update and schedule TGad draft D1.1 released on January 16, 2011 Speculative implementation of all technical, and some editorial, comments resolved to date (10/1220r12) Targeting March/11 session to conclude LB168 comment resolution TGad draft D2.0 will be generated weeks later, which will trigger the start of a recirculation LB Carlos Cordeiro, Intel Corporation

6 January 2011 LB168 update (10/1220r12) Editorial comments will be resolved by Editor after all technical comments are resolved Some technical comments will resolve editorials Contact the Editor if you want to volunteer to resolve Open CIDs Technical Editorial Totals Resolved Open PHY 38 4 6 17 65 MAC 315 194 30 376 915 BF 20 34 58 Others 78 92 191 451 219 40 519 1299 Carlos Cordeiro, Intel Corporation

7 Report for November 2010 September 2010
Carlos Cordeiro, Intel Corporation

8 TGad draft specification update
November 2010 TGad draft specification update Draft 1.0 was released on September 24, 2010 Implements the approved comments indicated in the D0.1 comment database (10/717r15) Following the release of D1.0, a 30-day WG letter ballot (LB168) was initiated on D1.0 LB168 closed on October 24, 2010 Carlos Cordeiro, Intel Corporation

9 LB168 update (10/1220r1) LB168 received 1229 comments
November 2010 LB168 update (10/1220r1) LB168 received 1229 comments Resolution to CID1162 was presented on Oct 14th conf call ( /1200r1) Approximately another 160 T/TR CIDs already have proposed resolutions to be presented and are indicated 1220r1 Contact me if you want to volunteer to resolve CIDs TR T ER E Totals PHY 28 9 19 65 MAC 278 237 192 208 915 BF 13 10 26 58 Others 80 15 71 25 191 399 271 281 1299 Carlos Cordeiro, Intel Corporation

10 Report for September 2010 September 2010
Carlos Cordeiro, Intel Corporation

11 TGad draft specification update
September 2010 TGad draft specification update Draft 0.2 was released on August 05, 2010 Implements editorial comments and technical comments that passed motion at the July/10 TGad mtg (10/777r0) Draft 0.3 was released on September 02, 2010 Speculative draft that implements comments that received no objection during conference calls held after the July/10 TGad mtg Draft 0.4 was released on September 10, 2010 Implements corrections identified by the editorial panel Drafts are publicly available at Carlos Cordeiro, Intel Corporation

12 Comment resolution update (10/717r14)
September 2010 Comment resolution update (10/717r14) TGad come out of the July/10 mtg with 120 (out of a total of 513) open comments Since then, 94 comments had resolutions proposed and received no objections (see list in next slide) As a result, TGad starts the Sept/10 mtg with 26 open comments MAC: 1 CID (CID91) MIB: 16 CIDs Security: 7 CIDs Beamforming: 2 CIDs (CID98 and CID292) Carlos Cordeiro, Intel Corporation

13 CIDs with proposed resolutions which received no objection
September 2010 CIDs with proposed resolutions which received no objection Discussed in San Diego, but not motioned: 320, 330, 331 (BF): 10/717r11 Conference calls: 3, 405, 406, 407, 408, 412, 414, 416, 417, 56, 418, 346 (PHY): 10/944r1 447, 448, 449, 316, 58, 59, 317, 318, 319, 461, 438, 386, 413 (PHY): 10/894r1 112, 113, 141, 232, 247, 378 (MAC): 10/947r1 382, 384, 385, 387, 388, 435, 439, 454, 465, 466, 471, 472, 473, 475, 476, 479, 480 (MAC): 10/948r2 323, 422, 445, 326, 328, 332, 333, 375, 433, 13, 100, 288, 289, 290, 291, 314, 340, 312, 374, 381, 427, 434, 452, 453, 464, 481, 482 (MAC/BF): 10/977r5 159, 256, 225 (MAC): 10/983r0 371, 372 (MAC): 10/946r0 321, 477 (MAC): 10/1010r0 84, 88, 89, 90 (MAC): 10/1007r2 175 (MAC): 10/999r0 389 (MAC): 10/1014r0 368 (MAC): 10/995r5 345 (PHY): 10/1029r0 487 (General): 10/1004r0, 10/1002r0, 10/1005r0, 10/1013r0, 10/1012r0, 10/1019r0, 10/1026r0, 10/1031r1, 10/1023r1 348 (PICS): 10/978r1 Carlos Cordeiro, Intel Corporation

14 September 2010 Editorial panel sent to TGad reflector on September 03, 2010, soliciting volunteers for an editorial panel responsible to: Review drafts for: Mistakes made by the editor when implementing contributions; and Editorials Report those to editor, so that they can be fixed before the TG approves a new draft Typically, there will be an editorial review for a few days before a new draft is intended to be posted Volunteers so far: B. Lynch, J. Barr, J. Yee, S. Trainin, S. Grandhi, P. Loc, S. Shankar, T. Derham, L. Chu and I. Toyoda (?) Contact the editor if you’d like to volunteer Carlos Cordeiro, Intel Corporation

15 July 2010 Report for July 2010 Carlos Cordeiro, Intel Corporation

16 TGad draft specification update
July 2010 TGad draft specification update Draft 0.1 was released on May 28, 2010 Draft is publicly available at Carlos Cordeiro, Intel Corporation

17 July 2010 Comment submission Following the release of D0.1, a 3 week commenting period was opened on D0.1 A total of 513 comments were received – comment database is document /717 Comments were reviewed during the July 1st conference call and classified into (sub)groups: 236 editorial comments (ER) = handled directly by the Editor 277 technical comments (TR) = resolutions to be proposed by volunteers 2 in the General comment group 24 in the Beamforming comment group 207 in the MAC comment group 41 in the PHY comment group 3 in the Coexistence comment group Carlos Cordeiro, Intel Corporation

18 April 2007 doc.: IEEE /0570r0 July 2010 Comment resolution Comment resolution will take place starting at the July/10 session Via submissions Via proposed resolutions suggested by assignees Via comment review sessions led by the Editor As per the TGad timeline, goal is to complete comment resolution at the September/10 session and enter WG letter ballot Any motions to approve comment resolutions should be done by September/10 Carlos Cordeiro, Intel Corporation Eldad Perahia, Intel Corporation