Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fast Roaming Study Group Closing Report March 2004

Similar presentations


Presentation on theme: "Fast Roaming Study Group Closing Report March 2004"— Presentation transcript:

1 Fast Roaming Study Group Closing Report March 2004
January 2002 doc.: IEEE /xxxr0 March 2004 Fast Roaming Study Group Closing Report March 2004 Addressed comments on PAR and 5 Criteria from (motions on Wednesday) Reaffirmed vote to accept PAR (03/771-r5) and 5 Criteria (03/772-r4) and to forward PAR and 5 Criteria to WG to forward to EXCOM (motion today) Voted to extend Study Group through meeting in January 2005 (motion today) Clint Chaplin, FR SG Chair John Doe, His Company

2 Presentations Roaming Requirements (04-286)
March 2004 Presentations Roaming Requirements (04-286) Roaming Interval Measurements(04-378) Analysis of Roaming Techniques (04-377) Clint Chaplin, FR SG Chair

3 Fast Inter-AP Transition = FIAT Minutes: 04-287
March 2004 Fast Inter-AP Transition = FIAT Minutes: Clint Chaplin, FR SG Chair

4 Goals for May (SG or TG) Focus on the following areas:
March 2004 Goals for May (SG or TG) Focus on the following areas: Develop process to follow in Task Group Key Requirements for Fast BSS-Transition Current BSS-Transition architecture and Process Survey of liaison group candidates Use cases/applications of Fast BSS-Transition Clint Chaplin, FR SG Chair


Download ppt "Fast Roaming Study Group Closing Report March 2004"

Similar presentations


Ads by Google