Presentation is loading. Please wait.

Presentation is loading. Please wait.

Parkland Outpatient Clinic (OPC2)

Similar presentations


Presentation on theme: "Parkland Outpatient Clinic (OPC2)"— Presentation transcript:

1 Parkland Outpatient Clinic (OPC2)
Pre-Bid Meeting Bid Package 3 Monday, March 18, 2019

2 McCarthy \ Crowther, A Joint Venture
#1 – 2018 Modern Healthcare #2 – 2017 ENR Healthcare #1 – Training Organization in Construction – Training Magazine Over 35 years in DFW Metroplex Oldest privately held construction company in the country Dallas MBE/SBE GC 2018 DFW MSDC Minority Supplier of the Year Award Clients: Parkland, Target, AT&T, DART and Coremark Intl. Parkland project designed to grow the capacity of small business, such as, Crowther

3 Project Overview 6 Story concrete structure Approximately 525,000 SF
87,500 SF per floor Metal panel and curtainwall façade Approximately 180 exam rooms Floors Moody Breast Clinic and exam locations Floor 4 - Shell and future expansion Floors Administration areas Outpatient Clinic & Moody Center for Breast Center Health The new center will bring together breast health services under one roof, making screenings, treatment and follow-up care more convenient for patients. The new center will offer advanced tomosynthesis screening technology and expanded genetic counseling. Along with breast imaging, the center will house a multidisciplinary team working together in the same space, improving continuity of care and leading to better outcomes for patients while also providing a pathway to achieving national accreditation. The Outpatient Clinic is estimated between 250,000 and 333,000 gross square feet depending on the inclusion of a 4th level shell floor and will tentatively include the following tenants: Administrative Offices Antibiotic Therapy Comprehensive Breast Center Diabetes Foot Wound HIV Clinic Nutrition Clinic Oncology Clinic Oncology Infusion Oncology Lab Oncology Pharmacy Ophthalmology Oral Surgery Clinic Surgical Oncology Palliative Care Clinic Physical Medicine and Outpatient Rehab 2

4 Procurement Schedule - Bid Packages
Bid Package 1: Site Civil and Foundations – November 2018 Bid Package 2: Core and Shell – February 2019 Bid Package 3: Interiors Floors 1-4 – March 2019 Bid Package 4: Interiors Floors 5-6 – June 2019

5 Scopes Bid Package 3: Interiors Floors 1-4 (Bid issued 3/18/19 due 4/5/19)
Metals Unistrut and Decorative Metals Woods, Plastics and Composites Rough Carpentry and Millwork Openings Interior Glazing, Doors and Hardware Finishes and Specialties Drywall, Tile, Flooring and Painting Low Voltage and Security Landscaping and Site Furnishings 4

6 Scopes Bid Package 4: Interiors Floors 5-6 (June 2019 issue)
Metals Unistrut and Decorative Metals Woods, Plastics, and Composites Rough Carpentry and Millwork Openings Interior Glazing, Doors and Hardware Finishes and Specialties Drywall, Tile, Flooring and Painting Low Voltage and Security Landscaping and Site Furnishings 5

7 Building Connected – Bid/Procurement System
Bidder communication system Interested bidders need to register Please use sign in sheet for this event Upon initial invite – setup profile BuildingConnected.com

8 Subcontractor/Supplier Prequalification Profile
Prequal for this project and other projects with McCarthy You do not have to complete prequal profile to bid Link to prequal profile:

9 M/WBE Participation Parkland 30% M/WBE Goal
MCC | Crowther 40% aspirational M/WBE Goal Diverse M/WBE participation Local firms M/WBE certifications accepted: DFW MSDC WBC-SW NCTRCA Texas HUB 8

10 M/WBE Program Outreach
Pre-Bid Meetings/Networkers Jan 15th – Project Kickoff Feb 11th – Bid Package 2 March 18th – Bid Package 3 June – Bid Package 4 Bid notice s to minority contractor associations\chambers and M/WBE firms Outreach, presentations and participation with minority contractor associations Provide Links to certification agency websites Subcontractors Certification Assistance – educate MWBE firms on the types of certifications accepted. Benefits of certification and assist firms in completing certification applications. Review MWBE cert. applications for accuracy. 9

11 McCarthy/Crowther Contact Information Damian Lee Project Manager Dave Cutlip Preconstruction Marc Bernhardt Project Engineer Katrina Keyes M/WBE Program Director Briana Ferguson M/WBE Program


Download ppt "Parkland Outpatient Clinic (OPC2)"

Similar presentations


Ads by Google