Download presentation
Presentation is loading. Please wait.
1
IceCOLD® Data Center Installation $900k Annual Savings
Dr. Jeff Zadeh Senior Research Director
2
IceCOLD® Pilot Installation
Data Center: 200,000 square feet Pilot area: 1,500 square feet 20 minutes to install AC electricity use measured before and after installation by SourceOne
3
Background 15% to 30% cooling efficiency improvement
Catalyst breaks up oil fouling by removing oil surface tension 15% to 30% cooling efficiency improvement
4
History Over 10,000 installations, including Fortune 500 companies Applications: air conditioning and refrigeration systems office buildings, hospitals, homes, CDC’s, restaurants Efficiency gains continue for the lifetime of the equipment
5
Case Study Results 15% less electricity use Estimated $922,000 savings per year Payback: 6 months ROI: 500%+
6
Summary $922,000 annual savings after IceCOLD® installed 20 minutes per AC unit to install with no downtime 6 month payback, ROI 500%+
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.