Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAMAS Working Group 6-7 December 2017

Similar presentations


Presentation on theme: "LAMAS Working Group 6-7 December 2017"— Presentation transcript:

1 LAMAS Working Group 6-7 December 2017
Agenda Item 2.2 Break in time series Eurostat

2 Last Open Issues Methodology
Calendar of transmission and dissemination Dealt by means of LAMAS consultation Task Force 1 on line discussion Sub-group of non-TF1 members discussion Eurostat

3 Methodology From LAMAS consultation:
Main Outcome: the uncertainty, due to Implementation date of IESS FR The feeling that the impact will be limited Possibility of discussion and methodology sharing in Reykjavik at the next LFS Workshop List of the 14 indicators and detailed transmission/dissemination calendar are in the LAMAS document at pages 3 and 5 respectively Eurostat

4 Calendar Eurostat priority: Annual break free time series
Implementation date = January the first T Transmission date: impact factor December T break free series May T+1 From LAMAS consultation: All respondents (12) propose a date within the deadlines But for several countries, for short run analysis reasons, May T+1 is too late and Eurostat supports any effort for timeliness Eurostat

5 Calendar, compromise solution
To publish break free time series for each countries as soon as available Y=26; N=0; ?=1 To publish EU aggregates as soon as one country releases its break free time series, with non corrected data for other country Y=23; N=1; ?=3 To revise EU aggregates when new countries release break free time series Y=22; N=2; ?=3 To flag EU aggregates for break until available the last break free time series Y=25; N=0; ?=2 Latest date: May T+1 Eurostat

6 Calendar, compromise solution for monthly data
It will be dealt in item 2.8 Eurostat


Download ppt "LAMAS Working Group 6-7 December 2017"

Similar presentations


Ads by Google