Presentation is loading. Please wait.

Presentation is loading. Please wait.

Temporary Works Co-ordinators

Similar presentations


Presentation on theme: "Temporary Works Co-ordinators"— Presentation transcript:

1 Temporary Works Co-ordinators
Temporary Works Scope Temporary Works Co-ordinators Design Brief Details of the organisations involved in the design scheme i.e. TWC name and company and nominated sub-contractors Statement on what temporary works are required. Site investigation details and foundation information Loading information if applicable Dead load / Live Load / Wind Load Design Standards or Guidance documents that need to be referred to. Advice as to when the design is required and how long will it be needed

2 Temporary Works Co-ordinators
Temporary Works Scope Temporary Works Co-ordinators Design Brief Information on any significant risks / hazards associated with the design (public / over water etc) State the permanent works drawings used to assist with the temporary works design Environmental information such as location (address) altitude, topography, distance from the sea Any requirements for access? If so what type (ladder, stair etc) do you need access under / over? Any information on services (underground or overhead) that could impact the design Any timing issues that need to be stated example Curing times, programmes details etc


Download ppt "Temporary Works Co-ordinators"

Similar presentations


Ads by Google