Presentation is loading. Please wait.

Presentation is loading. Please wait.

The technical formats/tools for reporting under BWD Agenda item 4

Similar presentations


Presentation on theme: "The technical formats/tools for reporting under BWD Agenda item 4"— Presentation transcript:

1 The technical formats/tools for reporting under BWD Agenda item 4
The technical formats/tools for reporting under BWD Agenda item 4.1 b: Reporting under Old BWD with ReportNet tools Agenda item 4.2: Reporting under New BWD with ReportNet tools

2 (1) Reporting under both directives done through ReportNet standards: - transparent - easy to use - platforma prepared - on line support - QA/QC integrated (2) 2 sets of templates (xls, xml) available for MS to download (separated for both Dir.)

3

4 (3) MS upload data into CDR (Central Data Repository) (4) When files received the first QC of deliveries is done in ReportNet (automatic GDEM procedures) (5) MS receive list of errors (6) MS correct data and resubmit files (7) Data accepted (8) BW data base prepared in WISE

5

6 Reporting procedure INPUT TOOL (ReportNet) DD CDR GDEM Country NFP
1. Data Dictionary (DD) - templates for BWD reporting (done in Reportnet) - MS download templates DD CDR GDEM 3.2. Accept country delivery 4. Collect and download all country deliveries 3. BW data uploaded BWD working db 3.1. Reject delivery if data not satisfy semantic criteria Country NFP 5. Quality assurance Of BW data 2. BW data prepared in a form as agreed (DD)

7 GDEM rules for QA/QC Data checks mandatory fields have values
parameter values >= 0 coordinates in ETRS89, decimal degree, decimal precision: 4 coordinates within geographic limits

8 Directive 76/160/EEC

9 Directive 76/160/EEC

10 Directive 76/160/EEC

11 Directive 2006/7/EC

12 Directive 2006/7/EC

13 Directive 2006/7/EC


Download ppt "The technical formats/tools for reporting under BWD Agenda item 4"

Similar presentations


Ads by Google