Presentation is loading. Please wait.

Presentation is loading. Please wait.

FD TIG Closing Report Date: Authors: September 2018 Name

Similar presentations


Presentation on theme: "FD TIG Closing Report Date: Authors: September 2018 Name"— Presentation transcript:

1 FD TIG Closing Report Date: 2018-11-15 Authors: September 2018 Name
Month Year doc.: IEEE yy/xxxxr0 September 2018 FD TIG Closing Report Date: Authors: Name Affiliations Address Phone Kome Oteri InterDigital Slide 1 1 1 Page 1 John Doe, Some Company

2 Abstract Closing Report for:
Month Year doc.: IEEE yy/xxxxr0 September 2018 Abstract Closing Report for: FD TIG (Full Duplex Technical Interest Group) November 2018 Mariott Marquis Queen’s Park, Bangkok, Thailand Chair: James Gilb (GA-ASI, USD, Gilb Consulting, GenXComm) Acting Chair/Secretary: Kome Oteri (InterDigital) James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 2 2 Page 2 John Doe, Some Company

3 Ran Straw Poll at Mid-week plenary
September 2018 Accomplishments 2 time slots Ran Straw Poll at Mid-week plenary Option 1: Standalone project on full duplex : 55 Option 2: EHT project should include full duplex : 96 Option 3: none of the above : 78 Ran internal SPs to plan future sessions James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 3

4 Do we support forming a SG ?
November 2018 SPs Do we support forming a SG ? 0/ 17 / 8 Do you support stopping the operation of the FD-TIG ? 16/ 11 / 3 Do you support the continuation of FD-TIG to have a focused study and discussion, and provide information to EHT ? 15 / 11 / 6 Conclusion: Do not form an SG James Gilb (GA-ASI, USD, Gilb Consulting GenXComm)


Download ppt "FD TIG Closing Report Date: Authors: September 2018 Name"

Similar presentations


Ads by Google