Presentation is loading. Please wait.

Presentation is loading. Please wait.

City Council January 19, 2016.

Similar presentations


Presentation on theme: "City Council January 19, 2016."— Presentation transcript:

1 City Council January 19, 2016

2 Overall Reconstruction Projects
Priority Street Name From To 1 MLK Blvd Loop 306 29th St 2 Bell St Harris St 3 Rio Concho Dr 4 Old Ballinger Hwy 5 College Hills Blvd Avenue N 6 Sherwood Way S Chadbourne St 7 Southwest Blvd West Loop 306 Rockbrook 8 29th St/Edmund Blvd Howard St N Bryant Blvd

3 Overall Reconstruction Projects
Priority Street Name From To 9 S Johnson St Avenue N Knickerbocker Rd 10 Glenna Dr Loop 306 Woodlawn 11 Junius St/ W 19th St Howard St N Abe St 12 Pecos St/ W. Harris Sherwood Way 13 Rio Concho Dr S Magdalen St Roosevelt St 14 29th St/ 28th St N Bryant Blvd Armstrong St 15 N. Chadbourne St US Hwy 87 43rd St

4 Overall Mill and Overlay Projects
Priority Street Name From To 1 N. Chadbourne St Loop 306 43rd Street 2 Glenna Dr Woodlawn Dr Howard St 3 Sunset Dr College Hills Knickerbocker 4 S. College Hills 5 Foster Rd 6 Southwest Blvd Rockbrook Twin Mountain 7 E. Harris St N. Abe St N. Bell St 8 S. College Hills Blvd Valleyview Blvd 9 US Hwy 67 E. Concho Ave 10 S. Chadbourne St W. Ave B E. Ave L

5 Overall Mill and Overlay Projects
Priority Street Name From To 11 Howard St Greenwood Dr US Hwy 67 12 Pecos St 13 N. & S. Johnson St Sherwood Way W. Ave N 14 W. & E. Concho Ave Santa Fe Park Dr Magdalen St 15 Christoval Rd Paint Rock Rd S Chadbourne St 16 W. Beauregard Ave 17 S. Washington St / W. Washington Dr. W. Twohig Ave S. Chadbourne St 18 Smith Blvd Gordon Blvd 19 Pulliam St

6 Year One Projects Type Priority # Street Name From To Recon. 1
MLK Blvd Loop 306 29th St 2 Bell St Harris St 3 Rio Concho Dr 4 Old Ballinger Hwy = This portion of Bell St will extend into Year 3

7 Year One Projects Type Priority # Street Name From To Overlay 8
S. College Hills Blvd Loop 306 Valleyview Blvd 9 N. Chadbourne US Hwy 67 E. Concho Ave 10 S. Chadbourne W. Ave B E. Ave L Recon 17 Southland Sherwood Walmart/SAMs

8 Year Three Projects Type Priority # Street Name From To Overlay 1
N. Chadbourne Loop 306 43rd Street 2 Glenna Dr Woodlawn Dr Howard St 3 Sunset Dr College Hills Blvd Knickerbocker Rd 5 Knickerbocker Foster Rd

9 Year Three Projects Type Priority # Street Name From To Overlay 6
Southwest Blvd Rockbrook Twin Mountain Recon. 8 29th St/ Edmund Blvd Howard St N Bryant Blvd 10 Glenna Dr Loop 306 Woodlawn 13 N. & S. Johnson St Sherwood Way W. Ave N

10 Year Five Projects Type Priority # Street Name From To Recon. 5
College Hills Blvd Loop 306 Avenue N Overlay 7 E. Harris St N. Abe St N. Bell St 11 Howard St Greenwood Dr US Hwy 67

11 Year Five Projects Type Priority # Street Name From To Overlay 12
Howard St US Hwy 67 Pecos St 15 Christoval Rd Paint Rock Rd S Chadbourne 17 S. & W. Washington W. Twohig Ave

12 Year Seven Projects Type Priority # Street Name From To Recon. 6
Avenue N Sherwood Way S Chadbourne Overlay 4 Sunset Dr Loop 306 S. College Hills Blvd 18 Smith Blvd US Hwy 67 Gordon Blvd 19 Pulliam St

13 Year Nine Projects Type Priority # Street Name From To Recon. 7
Southwest Blvd West Loop 306 Rockbrook Drive 9 S Johnson St Avenue N Knickerbocker

14 Year One Project Timeline
Street Name Letting Date Construction Start Construction End MLK Blvd Loop 306 to 29th Street July 2016 Oct 2016 Jan 2018 Bell Street Rio Concho Dr. to Harris St. Sept 2016 Dec 2016 May 2018 Harris St. to Loop 306 Dec 2017 March 2018 April 2019 Loop 306 to Old Ballinger Hwy June 2018 Sept 2018 Oct 2019

15 Year One Project Timeline
Street Name Letting Date Construction Start Construction End S. College Hills Blvd Loop 306 to Valleyview Blvd June 2016 Sept 2016 March 2017 N. Chadbourne St US Hwy 67 to E. Concho Ave Aug 2016 Nov 2016 May 2017 S. Chadbourne St W. Ave B to E. Ave L Jan 2017 July 2017 Southland Blvd Sherwood to Walmart/SAMs July 2016 Oct 2016

16 City Council January 19, 2016


Download ppt "City Council January 19, 2016."

Similar presentations


Ads by Google