Presentation is loading. Please wait.

Presentation is loading. Please wait.

BPC User Manual October 2015.

Similar presentations


Presentation on theme: "BPC User Manual October 2015."— Presentation transcript:

1 BPC User Manual October 2015

2 1 2 3 4 5 6 Agenda Introduction Access Draft Contract Encoding
Validation 6 Reporting

3 Introduction Objectives of BPC Overview of templates
Timeline and forecasting versions Link to other systems Roles Support

4 Objectives Annual Budget 2. EDF calls for contributions
Intro Access Draft Contract Encoding Validation Reporting Annual Budget 2. EDF calls for contributions DG DEVCO  DG BUDG Financial Forecasts DG DEVCO  ACP Group of the Council 3.Monitoring budgetary execution 4. Reporting DG DEVCO DG DEVCO  EU Bud. Authority, OECD, IATI  A new comprehensive forecasting process fulfilling each of the above objectives through the use of a single Financial Forecast system called BPC

5 Overview Encoding template
Intro Access Draft Contract Encoding Validation Reporting Encoding template SAP BPC offers a flexible encoding template : Provide full portfolio view of decisions & contracts for a given delegation/unit using an excel interface Allow to input forecasted data & related risk Allow easy filters on contract lists and decisions Allow input of comments when necessary Perform necessary controls on the indicators online Dashboards SAP BPC integrates a set of easy-to-use Dashboards that: Allow to report delegations / units figures at aggregated level Provide a graphical view supporting validators' decisions Summarize delegation / unit indicators Reports SAP BPC offers a set of standard operational and variance analysis reports that: Provide an aggregated view of forecasts (e.g. by budget line, benefitting zone,..) Compare forecasts with actuals and different forecast versions Allow drill-down functionality Workflows SAP BPC offers a validation flow that: Is aligned with security set-up in the unit / delegation Ensure that all actors identified in the forecasting process are appropriately involved Ensure that no forecasts generating negative indicators on decisions and contracts are validated

6 Timeline Intro Access Draft Contract Encoding Validation Reporting The preparation, review and consolidation of financial forecast processes are integrated with the other reporting and monitoring processes. Deadlines have been defined in such a way that required information is provided on time in order to report to external stakeholders. The processes are supported by a strong versioning mechanism to keep track of figures entered and modified throughout the time. Year N Year N+1 D J F M A M J J A S O N D J Budget circular 2nd Forecast alert from DG BUDG Budget N+1 adopted by EP DGs Contribution to draft budget N+1 1st Forecast alert from DG BUDG Forecasts year N per Budget Line to DG BUDG Draft Budget N+1 finalised by EC Revised forecasts year N to DG BUDG Global transfer on EC budget year N 3rd Forecast alert from DG BUDG D J F M A M J J A S O N D J 2nd call for contributions for year N 3rd call for contributions for year N 1st call for contributions for year N+1 D J F M A M J J A S O N D J FF for years N & N+1 Revised FF for years N & N+1 Monthly Monitoring of large payments EU Budget EDF Financial Forecast

7 Internal monthly monitoring of large payments (No validation needed)
Versions Intro Access Draft Contract Encoding Validation Reporting Two forecasting exercises requiring validation of all needed actors in Delegation/Unit and the review of the HQ validators during the month of January and July to comply with the deadlines defined in the previous slide: Initial & Mid-Year : Validation required by Delegations and Units before the 15th of January and July Initial & Mid-Year Validated by HQ : Validation of HQ validators before the 31st of January and July Year N Year N+1 J F M A M J J A S O N D J Initial Mid-year Internal monthly monitoring of large payments (No validation needed) Initial Initial val by HQ Mid-year val by HQ Initial val by HQ NB: From September to December, an internal monthly monitoring of large payments is required for both delegations and HQ units. Indeed, for payments initially greater than 200,000€, delegations/units are required to provide DEVCO HQ with an updated forecast based on latest information known.

8 Systems SAP BPC CRIS DWH REFDATA ABAC DWH
Intro Access Draft Contract Encoding Validation Reporting Every 24 hours, BPC is fed with data from CRIS DataWarehouse (for Contracts & Decisions), ABAC DataWarehouse (for payments) and REFDATA. BPC will display data as encoded in CRIS with a 24 hours delay. This is due to the scheduling of the different systems at EC and due to the time zone importance at DEVCO (avoid putting users offline in the middle of the day). Inbound data "Short term" master data: on- going & draft decisions and on- going contracts Actual figures (with AOS and / or definitive visa): decided (initial & riders), contracted (initial & riders), paid (net) and decommitted amounts (negative riders) Inbound data "Long term" master data: delegations / units / directorates, budget positions, benefitting zones, DAC sector code, contract types, contract (Sub)natures, budget management types CRIS DWH SAP BPC REFDATA ABAC DWH Outbound data "Short term" master data: draft contracts Forecasted figures (per version): decided (initial & riders), contracted (initial & riders), paid (net) and decommitted amounts (negative riders)

9 Scope Intro Access Draft Contract Encoding Validation Reporting In SAP BPC, forecasts are done at 3 different levels (representing different forecasting objects). They are coming from different systems and are used to forecast different amounts. Objects Description Source Amounts forecasted Decisions Includes statuses EC, EG, DE Budget lines of on-going decisions must still be valid to appear on input template (excludes 6th / 7th EDF and budget lines of Annual Budget not carried forward) CRIS Decided amounts (expected positive riders on the decision) Decommitted amounts (expected negative riders on the decision) Draft Decisions (PO status) Includes provisional status PO (only those that have already been assigned to a valid Budget Line in CRIS) Budget lines of on-going decisions must still be valid to appear on input template Contracts Includes statuses EC, EG and DE Budget lines of decisions must still be valid to appear on input template Contracted amounts (expected positive riders on the contract) Decommitted amounts (expected negative riders on the contract) Paid amounts (expected invoices on the contract) Draft contracts When a contract with related payments is expected, a draft contract must be created in SAP BPC (status DR) so as to input forecasts on it (rather than inputting on the decision). Draft contracts can represent calls for proposal launched by HQ Units. SAP BPC

10 Roles HoD/HoC HoU Person in charge in FCA unit of the Directorate
Intro Access Draft Contract Encoding Validation Reporting FCA Unit & Unit D3 Verification HoD/HoC 2nd Validation Head of FC section (SPOC) Global Review Head of Cooperation 1st Validation Nominated Project Manager Encoding FCA Unit & Unit D3 Verification HoU 2nd Validation Person in charge in FCA unit of the Directorate Global Review Nominated Project Manager 1st Validation Encoding Verify global coherence of forecasts at delegation / unit, directorate and Budget lines levels In charge of the general coordination with SPOCs in delegations and with Geo coordinators in HQ units under his/her perimeter. Verify global coherence of forecasts (Directorate Dashboard) Commit to achieve forecasts submitted for year N and N+1, once validated Ensure compliance with Financial Regulation and with contractual terms Verify global coherence of forecasts SPOC in delegations : in charge of the global coordination of each exercise, (2) the coordination with HQ verification units, (3) the management of user access and plug-ins installation, (4) the first-level support in the delegation, (5) the monitoring of the execution of the financial forecasts, (6) the coordination of regular updates of the forecast in the live version of BPC, (7) the coordination with daughter delegations (when applicable) and (8) Ensuring that BPC users in the Delegation have attended necessary trainings. Verify, validate or reject and comment when relevant the forecasts for the Section's portfolio Encode forecast + risk level +comments when needed Proceed with the adjustments of forecasts in case of rejection by one of the next actors

11 Support General Information
Intro Access Draft Contract Encoding Validation Reporting General Information For any issue, users must contact DEVCO Application Support functional mailbox or by phone (99000 or ). The availability of the service starts from 08:30 until 18:00 (Brussels time) on the official working days of the Commission. Licences Upon arrival, departure, reallocation or absences of staff members, each Unit / Delegation must notify it to DEVCO APPLICATION SUPPORT for the management of licenses. Update of the Delegation/Unit user list in October by the support team. Useful links Knowledge Base: orecasting+tool

12 Access

13 Access Prerequisites Access Tips & Tricks

14 Prerequisites Intro Access Draft Contract Encoding Validation Reporting The use of BPC implies a pre-installation of a plug-in called the "EPM Add-in". Before connecting to the tool, the user will verify that the "EPM Add-in" is installed on his/her computer. This component of the tool is required to open the reports and input templates in the Excel interface. To make sure the installation was performed on your computer: Open Excel Verify that the tab "EPM" and "Data Manager" appear on the Ribbon If you do not see the EPM Add-in in Excel, please install it by clicking on: i. Menu / All Programs / Landesk Management / Portal Manager ii. Select "DEVCO_EPM_AddIn_16_01" and "W7-NP_EPM_ForFirefox" iii. Launch iv. Wait for the installation to complete After an Excel crash, the "EPM" and "data manager" tabs might not appear in Excel anymore. To solve this, you just need to enable the add-in in the Excel options. Excel options tab >Add-ins Then go to "Manage" and select "Disabled Items". You will then see the EPM Add-in and will be able to enable it.

15 Prerequisites Intro Access Draft Contract Encoding Validation Reporting At the first connection (connection to a SAP BPC Report/encoding Template) or connection to a new computer, one option needs to be set by the user in the EPM add-in. This option, once defined by the user, will not need to be set again. The user will need to remove the "…" for empty comments: The user must then untick two parameters in the "Display" tab to remove the window on the left of his screen Follow the path: EPM>Options>User Options In the user options, go to the “Others” tab and remove the “…” next to “Empty comment” Follow the path: EPM>Options>User Options In the user options, go to the “Display” tab and untick "Display EPM Context Bar" and "Display EPM Pane"

16 Access Intro Access Draft Contract Encoding Validation Reporting The user can connect via the Intranet under the "DEVCO TOOLS" tab The system will request the user's credentials. Users in delegations can either user their EEAS login/password or the DEVCO one. After logging on, the user will be redirected to the access portal:

17 Access Intro Access Draft Contract Encoding Validation Reporting Confirm it is your delegation. If you have a drop-down list it means that the system registered your login for several delegation Important announcements related to maintenance or important communications Reporting for all (Delegations & HQ) and specific reporting requested by HQ. A report catalogue is available in the reporting part of the user manual Action button OPEN to access the template requested. A prinstcreen is available to have a quick view on the report The encoding template to encode your forecast and the Create & Manage Draft Contracts. Validation template to validate or reject the forecast

18 Tips & Tricks User's To Do List for each forecasting exercise
Intro Access Draft Contract Encoding Validation Reporting User's To Do List for each forecasting exercise STEP 1 : DRAFT DECISIONS Create PO Decisions in CRIS that are linked to a Budget Line During initial exercises, all draft decisions should be created before 31/12 STEP 2 : DRAFT CONTRACTS LINK the draft contracts to the correct CRIS contracts. All forecasts will be transferred from the draft contract to the correct CRIS contract in order to have the executed amount and a positive RAP. DELETE the contract that has no reason to exist anymore CREATE new draft contract if needed STEP 3 : ENCODING UPDATE the forecast while looking at the ACTUAL in the encoding template to avoid a double count (e.g. the current month is July, you have encoded a forecast in August but the amount was executed in June which create a double count). ENCODE new forecast if needed VERIFY your forecast on shared decisions. Even with negative shared decisions in his portfolio, the user will be able to save and validate. STEP 4 : VALIDATE CONTROL the dashboard in the validation template VALIDATE or REJECT the forecast

19 Draft decision

20 Decision Create a Decision in provisionary status (PO) in CRIS
Intro Access Draft Contract Encoding Validation Reporting If the user wants to create a Draft Contract on a future decision not yet existing in CRIS, he/she shall: Create a Decision in provisionary status (PO) in CRIS Fill in the Analytical breakdown (for EDF only) 3. Link it to a Budget line (by filling in the Financial Breakdown at ENCOD level) Once the above conditions are completed and without giving any visa in CRIS, the "Draft Decision" will be automatically transferred in BPC's encoding template with a 48h delay and draft contract can be created on it. In order to make forecasts, the user will encode a DECIDED figure equal to the amount of the decision in the month of the future ORDO visa. The Actual amount will be transferred from CRIS to BPC once the ORDO Visa is given in CRIS.

21 Decision EDF Select a decision year for 2016/2017/2018
Intro Access Draft Contract Encoding Validation Reporting Select a decision year for 2016/2017/2018 Fill in at least all mandatory (bold) fields + press "Submit" (Yellow warnings are not blocking) The Decision is created in CRIS and receives a specific ID. All related tabs are created. Access the Rider's tab and click on MODIFY.

22 Decision EDF In the Initial Rider tab:
Intro Access Draft Contract Encoding Validation Reporting In the Initial Rider tab: Select "EDF number" 11 by double-clicking on the corresponding yellow-field or search button Enter a "Commitment type" + Press "Submit" or the submitting "Green V" (Yellow warnings are not blocking) In Analytical Breakdown tab: Select the EU Contribution, Fill in at least one "Zone Financing the action" + Press "Submit" (Yellow warnings are not blocking)  Regarding regional decisions, GESTOPEs must also encode a "Zone Financing the action" by Country as this information is already known at this stage.

23 Decision EDF In Financial Breakdown tab:
Intro Access Draft Contract Encoding Validation Reporting In Financial Breakdown tab: Access the "Financial Breakdown", click on NEW and select the Budget line by double-clicking on the corresponding yellow-field or search button. Encode the total amount and select the Posting criteria by double-clicking on the corresponding yellow-field or search button. Click on Submit (No visa is required)

24 Decision BGUE Select a decision year for 2016/2017/2018
Intro Access Draft Contract Encoding Validation Reporting Select a decision year for 2016/2017/2018 Fill in at least all mandatory (bold) fields + press "Submit" (Yellow warnings are not blocking) The Decision is created in CRIS and receives a specific ID. All related tabs are created. Access the Rider's tab and click on MODIFY.

25 Decision BGUE In the Financial breakdown tab:
Intro Access Draft Contract Encoding Validation Reporting In the Financial breakdown tab: No "Analytical Breakdown" required for Budget. Click on NEW, select the Budget line (no posting-criteria required for BUDGET) Encode the amount and click on SUBMIT. Other fields will be updated automatically. No visa is required In the Initial Rider tab: Enter a "Commitment type" Enter a "Legal justification" Click on SUBMIT (Yellow warnings are not blocking) and access the Financial breakdown

26 Draft Contract

27 Draft Contract Introduction & Lifecycle Creation Management
Creation of Draft Decisions in CRIS FAQ – Usual questions from the users

28 Introduction What? When? Why? How? Draft contracts correspond to:
Access Draft Contract Encoding Validation Reporting What? Draft contracts correspond to: Individual contracts not yet registered in CRIS but expected to be signed in year N and N+1 Calls for proposal launched by HQ - on-going or expected to start (aggregated estimation) Contracts in the workflow but not yet signed by the AOS When? A draft contract must be created each time contracted and paid amounts are expected to impact DEVCO decisions (contracts on decisions) or DEVCO budget lines (EN contracts without decisions) in years N and N+1 Why? By using draft contracts and linking them subsequently to CRIS contracts, SAP BPC ensures a detailed and coherent forecast breakdown. How? Draft contracts are managed in a simple excel template containing two sheets: one to create them and one to manage them Draft contracts can be created on draft or on-going decisions for each delegation / unit or without decision on DEVCO budget lines (only for the Budget)

29 Lifecycle Intro Access Draft Contract Encoding Validation Reporting Draft contracts have a limited life in the forecasting tool. In the short / medium term, they should be deleted, associated to CRIS contracts or re-allocated to other draft contracts. Therefore, several mechanisms have been set up. 1. Create draft contract 2. Update draft contract 3a. Link draft with on-going CRIS contracts Tasks Select existing decision (if relevant) and budget line(s) Assign to delegation (if relevant) Define attributes (benefitting zone, (sub)nature, DAC Code,…) Tasks Update attributes Delete draft contract (if finally contract signature will not occur anymore) Tasks (for individual contracts) Identify ID of CRIS on-going contract (newly created) corresponding to draft contract; Link forecasts to CRIS on-going contract 3b. Re-allocate forecasts from call for proposals Tasks (for regional or thematic call for proposals) Initial forecasts (previous versions) made globally by thematic or delegation "chef de file" are split on individual draft contracts according to the results of the call

30 Creation Intro Access Draft Contract Encoding Validation Reporting The "Create & Manage Draft Contracts" template is composed by two main tabs. The first one available when you open the report will enable you to create new draft contracts Action buttons (to save draft contracts created and to refresh data in the template) Draft contracts created today for the delegation but not yet updated in SAP BPC list (1 day delay) Selection of draft contract number and definition of main attributes. The GESTOPE will be automatically set with the login of the user. Link to appropriate decision (if relevant) and to budget line(s). Only decisions having active budget lines and belonging to the delegation / unit are displayed If the user wishes to create a draft contract not linked to a decision, he / she should select "NO_DEC". If "NO_DEC" has been selected, the user can choose any budget line. If a decision has been selected, the choice will be limited to the budget line(s) of the decision. By default the user has room to define 5 budget lines for his / her draft contract. Nevertheless, additional lines can be added using the button

31 Possible error message
Save Intro Access Draft Contract Encoding Validation Reporting Possible error message If all mandatory fields of the draft contract have not been completed, the system blocks the saving action. This is typically the case when nothing has been mentioned for decision and budget lines. The user must return in the template and complete missing information. Confirmation message If all data have been correctly encoded, the system issues a message requesting the user to confirm the creation. If the user confirms, a second message is sent, proving that information has been correctly sent to SAP BPC database.

32 Manage Intro Access Draft Contract Encoding Validation Reporting The "Create & Manage Draft Contracts" template is composed of two main tabs. !!! All actions (ADAPT, DELETE or LINK) will have an impact the next day !!! Draft contracts created for your Delegation SELECT the draft contract you want to manage by changing attributes, delete or link ADAPT the description or the attributes DELETE your draft contract if the signature will never occur LINK your draft contract to the recently signed contract on the related decision in CRIS. The forecast of the draft will be transferred to the CRIS contract in your portfolio Only contracts belonging to the same decision and created within 1 year will be available for link

33 Manage - Link Intro Access Draft Contract Encoding Validation Reporting As for previous actions, the user must select the draft contract he / she wants to treat in the step 1 of the template. 1 2 In this section, the user must then select, using the drop-down list, the recently signed CRIS contract to which he / she wishes to link the draft contract. By default, this drop-down list includes all contracts belonging to the delegation, related to the same decision as the draft contract and signed within the last year: After selection of the CRIS contract and by pressing the button "Link contract", the user will be requested to confirm the link: Important remark: this procedure is not applicable for draft contracts that correspond to calls for proposals launched by HQ. Actually, those draft contracts require a re-allocation of previous forecasts versions on draft contracts corresponding to the selected projects according to the results of the call (see next slide) After one day The draft contract will disappear from the input template and will receive a specific status. The figures forecasted in previous versions will be re-assigned automatically to the newly created CRIS contract For the figures forecasted in current version (version currently used to input), two cases are possible: Draft contract and CRIS contract use the same budget line(s): forecasts are fully re-assigned in current version Draft contract and CRIS contract use different budget line(s): forecasts are re-assigned in current version to the CRIS Contract's Budget Line

34 Impact Draft contract creation template Immediate impact
Intro Access Draft Contract Encoding Validation Reporting Draft contract creation template Immediate impact The created contract appears as already used in the template and is not selectable anymore. Input template Draft contract is listed in the delegation portfolio (under its decision) and the user can start entering forecasted values on it. Nevertheless, attributes are not visible yet. Delayed impact (after one day) Draft contract creation template New contracts IDs are available for creation (as IDs have been used the previous day) Manage Draft contract template Created draft contracts appear with their attributes as active and can be updated, deleted or linked to CRIS contract Input template Attributes of created draft contract are also displayed in the input template.

35 Exceptions Call for proposal
Intro Access Draft Contract Encoding Validation Reporting Call for proposal The case of calls for proposal launched by HQ requires a particular procedure in managing draft contracts. Actually, this process involves three main steps: Until the call procedure is not finalised (when call procedure is planned, launched and performed), the number of resulting contracts, the beneficiaries and the delegations that will manage them are unknown. As such, the HQ Unit creates one single draft contract that corresponds to the global envelope of the call and encodes aggregated forecasts on it. When the call for proposal is finalised, the HQ Unit will use a reallocation template that will create one draft contract for each selected project. Those draft contracts are assigned to the appropriate delegations in charge that can start encoding their forecasts in the current version. It will reflect the reallocation done in the previous forecasting versions (e.g. the global forecasted envelope created by B_01 should not be reflected in their portfolio as it would significantly perturb their execution rate) Shared Decisions To create new contracts ("draft contracts") on a shared decision, the following steps must be respected: • Delegation (A) / HQ unit (owner of the shared decision) is the only delegation/HQ unit allowed to create draft contracts under this decision. • If Delegation (B) needs to create a draft contract under this shared decision, Delegation (B) must request Delegation (A) / HQ unit to generate a draft contract on its behalf. • Thereafter, Delegation (B) can encode its financial forecasts on the newly-created draft contract that will appear in its BPC portfolio.

36 FAQ Frequent questions
Intro Access Draft Contract Encoding Validation Reporting Frequent questions "I have created a draft contract but I don't see the title and attributes in the encoding template" The draft contract is already present in the encoding template and the user is able to encode forecast on it. The next day, he will see the attributes "I have created a draft contract two days ago but I still don't see the attributes and the draft contract in the management part of the template" Create an incident sent to DEVCO APPLICATION SUPPORT "I have deleted a draft contract but the forecast has still an impact on the RAP" The impact will be reflected the next day "I have two draft contracts with the same ID in my portfolio" This happens when two users create a draft contract simultaneously. He should delete one of the two contract and create a new one with a different ID. 

37 FAQ Intro Access Draft Contract Encoding Validation Reporting "I want to link a draft contract but the CRIS contract is not available in the drop-down list" The draft contract is not linked to the same decision as the CRIS contract. Example: The draft contract was created under NO_DEC and they want to link it to a CRIS contract with a CRIS decision  Manual Link: Copy paste the forecast of the draft contract on the CRIS contract in the encoding template and DELETE the draft contract The CRIS contract was created in CRIS more than one year ago "I want to create a draft contract but the decision is not available in the drop-down list" Please refer to point II of the encoding chapter. Either the decision is belonging to another Delegation/Unit and the latter should create the draft contract for them by selecting their Delegation/Unit as Delegation/Unit in charge in the attribute. Either, the decision is not present in BPC (e.g. Unit B_01 creating a draft contract for DELEG_LK).

38 FAQ Error message : "The attribute selected is not valid"
Intro Access Draft Contract Encoding Validation Reporting Error message : "The attribute selected is not valid" The user encoded manually a wrong attribute not known by the system instead of double clicking on the cell to select it in a box. The same error message will appear if he forget to select an attribute.

39 Encoding

40 Encoding Filter Page Components of the encoding template
Save the data encoded Indicators Offline Mode FAQ – Usual questions from the user

41 Filter Page If needed the user can filter on:
Intro Access Draft Contract Encoding Validation Reporting If needed the user can filter on: Benefitting Zone Decision EDF / BGUE Generate Portfolio to see the encoding template filled with your decisions and contracts Save your forecast Offline Mode in order to encode without connexion required The validation progress Information on: The latest refresh The mode (OFFLINE/ONLINE), the user and the date Select the information needed in the template. Less information for a better printout Legend on: The possible errors that might occur when encoding your forecasts (e.g. "V" periodic issue) The risk levels Conditional formatting

42 Components Intro Access Draft Contract Encoding Validation Reporting All decisions and their related contracts will be displayed in one single Excel sheet. The blue lines portray the total of the decision. The grey lines stand for the total of a specific BL. The user will be able to enter: Decision: DECIDED & DECOMMITTED_DEC Contract: CONTRACTED, PAID, DECOMMITTED_CTR The user will also find certain attributes to help him/her to identify the contracts and decisions. The user will be able to filter on any of those attributes to create a custom selection of contracts / decisions. Figures Decided = Decided – Decommitted_DEC Contracted = Contracted – Decommitted_CTR Paid The forecasted amounts are directly calculated with the forecast encoded RAC = Decided – Contracted – Decommitted_DEC + Decommitted_CTR RAL = Decided – Paid – Decommitted_DEC OR RAC + RAP RAP = Contracted – Paid – Decommitted_CTR Errors in the indicators are highlighted in Red The user can enter comments on each line Forecasts can be entered on a monthly basis. except on past months highlighted as actuals. Only positive amounts must be entered in the system (decommitments) except for payments. If the risk level is not defined by the user, the system will automatically associate it with a very low risk (risk level 1).

43 Save Intro Access Draft Contract Encoding Validation Reporting Once you have encoded your forecast and the related risk level, click on SAVE DATA to save your work. Only when the status is succeed: Your data has been correctly saved into the system and you can close the template The periodic indicators (RAC, RAP & RAL) have been re-calculated: The correction you made for "V" periodic message errors (refer to Indicators section of the user manual) will be reflected and the "V" will disappear after the save

44 Indicators Global indicator in error Open the error management report
Intro Access Draft Contract Encoding Validation Reporting Global indicator in error Open the error management report Error with "!" (1 in the filter box) in the encoding template: Forecasted too much (e.g. they have an executed amount in June and they forecasted that amount in July, double count / They encoded on a wrong line) Draft contract no linked (e.g. the CONTRACTED amount they forecasted was replaced by no actual as not linked to CRIS). Only a forecasted PAID amount subsists in July explaining the negative RAP Error with "V" is a periodic issue and is explained next slide

45 Indicators Periodic indicator in error
Intro Access Draft Contract Encoding Validation Reporting Periodic indicator in error Example of previous slide on CTR_DR_FJ_0018 (worksheet "CHECK RAP") The user encoded a PAID amount in February 2016 on a Draft Contract and a CONTRACTED amount in August 2016. The global RAP over the years will be positive: CONTRACTED – PAID 2* = RAP 0) However, in February the RAP is of 0 and there is no amount available to encode a PAID forecast. The contracted amount only occurs in August. So from February till August the RAP will be negative. The user should either: Move the CONTRACTED forecast to February Move the PAID forecast to August Please note that for large shared decisions, the correction can be more complex as more figures are impacting the indicator

46 Indicators Intro Access Draft Contract Encoding Validation Reporting Indicators in error on a decision with multiple Budget Lines In this case, it is important to see on which line the correction should be done

47 Offline Mode Generate the offline version
Intro Access Draft Contract Encoding Validation Reporting This automated function enables users to share the encoding task with other users offline. An external user without license nor internet connection will be able to encode his forecast on this version. The person having shared the file will be able to upload the figures encoded online. Generate the offline version By clicking on the OFFLINE MODE action button, the template will be automatically generated and the system will propose to save the file on your computer. Once this is done, you can easily send the offline encoding template to your colleagues.

48 Offline Mode Upload the encoded data online 1 2
Intro Access Draft Contract Encoding Validation Reporting Upload the encoded data online 1 2 In the FILE tab of the Excel, click on OPEN to select the offline version you saved previously on your computer Enter the BPC access template and make sure you are connected (green light) 3 4 Click on the ONLINE MODE action button to put the encoding template back online Once the mode is ONLINE, click on the SAVE DATA action button to upload the encoded figures

49 FAQ User has negative indicators on PO decision
Intro Access Draft Contract Encoding Validation Reporting User has negative indicators on PO decision The user encoded forecasts on draft contracts under the newly created PO decision. However, the decision has no available amount as it will be reflected in BPC once the ORDO visa is given in CRIS. The user should therefore encode a DECIDED forecast in the month he should receive the ORDO.

50 FAQ "Cannot be saved due to a work status rule violation"
Intro Access Draft Contract Encoding Validation Reporting "Cannot be saved due to a work status rule violation" Delegation/Unit's forecast has been validated at least by the 1st validation (OPS section) and the template has been locked. If a change is needed they should ask the Head of FC Section, the HoD/U or the HQ validator to reject the forecast.

51 FAQ Intro Access Draft Contract Encoding Validation Reporting The user notices that a contract or decision is missing in the BPC portfolio The decision or contract is allocated to another Delegation/Unit in CRIS. The correction needs to be made in CRIS. UNIT: The Entity in Charge should be the Unit (not a directorate) DELEG: Delegation in charge: Delegation and Entity in charge: Directorate Status: Decisions: EC, EG, DE or PO (only those that have already been assigned to a Budget Line) Contracts: EC, EG and DE

52 Validation

53 Validation Dashboard Detailed View FAQ – Usual questions from the user

54 Dashboard Intro Access Draft Contract Encoding Validation Reporting The first part shows where the user stands in the overall process. The summary of the check on the RAC, RAP & RAL (forecasts included) of the delegation is displayed. General comments can be entered at the level of the delegation (max 500 characters). The second part of the report contains the dashboard at delegation level. This will support the user in the validation / decision-making process. This dashboard is further described in the next point. The third part presents a forecast analysis by risk category.

55 Dashboard Intro Access Draft Contract Encoding Validation Reporting The comments’ fields available for input of the user are highlighted in yellow. The user must click on SAVE COMMENT. For each comment, the role, user ID of the author and the date at which the comment was entered are available. . The indicator check will confirm to the validator that no errors are detected on the RAC, RAP, RAL for contracts and decisions belonging to the delegation. A shared decision in error will not impact the indicators and the user will be able to validate. The validation button will only be displayed if the following conditions are met: - The user has the appropriate role in the validation process; - Indicators are all positive. The reject button will enable the user to unlock the encoding template in order for the encoder to modify the forecast again. The last Head of Operational Section validating will lock the encoding template to enable the next validators to work on a stable environment A window appears so that the last Head of Ope. Section can change the status from “Unlocked" to “Submitted” Upon forecasts rejection, the validation process returns to the first step. The input of forecasts is now allowed. A window appears so that the rejector can change the status from “Submitted" to “Unlocked”

56 Dashboard Intro Access Draft Contract Encoding Validation Reporting Depending on the forecasting version, the first column will show: During the INITIAL forecast: The Actual of the previous year During the MID-YEAR forecast: The initial forecast encoded in January The ongoing forecast reflecting the encoding template (A) Actuals (B) Left to implement = Full year forecast – Actual (A-B) : Will reflect the amount to be implemented before the end of the year to achieve a 100% execution rate. Year-To-Date initial forecast: Reflect the initial forecast from January till the current month (C) Year-To-Date execution rate = YTD forecast – Actual (C-B): Shows what should have been implemented to achieve a 100% YTD execution rate. It gives the user a good indicator on the current accuracy of his forecast. For each amount types, the table gives the execution rate of previous year for the: Initial Forecast validated by Delegation vs Actual Initial Forecast validated by HQ vs Actual Mid-Year Forecast validated by Delegation vs Actual It gives a good indicator on the quality of the forecast made by the delegation and on the impact of the revision of the HQ validators This section provides the validator with the RAL absorption time of the delegation / unit based on previous year's actuals, current and next year's forecasts. A absorption rate of 4 means the delegation will need 4 years to fully pay the amount decided.

57 Dashboard Intro Access Draft Contract Encoding Validation Reporting This section displays information on decisions (EC, EG, DE, PO and DR) contracts (EC, EG, DE) and BPC draft contracts (DR, RE) the delegation / unit is dealing with. For each decision and contract status, the table displays the number of items dealt with and their associated financial indicators (total decided / contracted amount, based on the combined forecasts version and RAC, RAP, RAL). This section includes a waterfall chart portraying the RAL evolution (on decisions only) from previous year actual to next year forecast. The breakdown of each component contributing to the RAL evolution from one year to another is displayed. RAL N-1 + DECIDED – PAID – DECOMMITTED_DEC = RAL N The summary table consists of a breakdown of the different financial amounts characterizing the financial situation of a delegation / unit, on the one hand risk-free and on the other risk-adjusted. In the breakdown, a distinction is also made in order to identify the budget support amounts. Selection Box : In this part, the user has the possibility to select the year and the instrument (EDF, BUDGET or ALL) he / she wishes to consult the forecasts for. Based on the selection, the table and the graph will automatically adapt. Graphs: The validator can see a distribution of risk levels by measure type (i.e. decided, contracted and paid amounts).

58 Detailed View Intro Access Draft Contract Encoding Validation Reporting The second worksheet of the validation template gives you a portfolio overview of all your decisions and contracts with the related indicators Risk Weighted or Risk Free Your delegation is set by default but you can change it View: Encoding: Shows only the active contracts and decisions as in the Encoding Template Reporting : Shows all contracts and decisions including the closed and cancelled ones not present in the Encoding Template Refresh to generate the template Show properties to see more attributes (e.g. GESTOPE, etc.) Show Semester view Show Decommitted (DECOMITTED_CTR & DECOMMITTED_DEC) Attributes part Actual and N, N+1 and N+2 forecast for the current version for each amount type. RAL, RAP & RAC for all contracts and decisions

59 FAQ "Not at the right level for being validated"
Intro Access Draft Contract Encoding Validation Reporting "Not at the right level for being validated" The 1st validation by OPS section should be done before the Head of FC Section can give his visa

60 FAQ "Please correct the indicators RAC RAP RAL in error"
Intro Access Draft Contract Encoding Validation Reporting "Please correct the indicators RAC RAP RAL in error" At least one decision (RAC & RAL) or a contract (RAP) belonging to the Delegation/Unit has a negative indicator. A shared decision not belonging to the Delegation/Unit in error will not impact the RAC or RAL with a red cross.

61 FAQ Not the right number of section
Intro Access Draft Contract Encoding Validation Reporting Not the right number of section The system needs two validation at OPS section but the user communicated they have only one section in Delegation Two solutions: The Ops section can validate a second time with the same login Send to DEVCO Application Support to update the number of section of the Delegation/Unit.

62 Reporting

63 Catalogue REPORT DESCRIPTION All Variance Analysis Report
Intro Access Draft Contract Encoding Validation Reporting REPORT DESCRIPTION All Variance Analysis Report Run an execution rate analysis with drill-down possibilities by financial instrument, entity in charge, nature, sub-nature, DAC code and beneficiary Actual vs Forecast - Monthly Report View variance between actual & forecasts on a monthly basis Pivot Table Report Create your own report through the use of a pivot table. The user will have full flexibility to respond to specific reporting needs Error Management Report View decisions and contracts in error in your encoding template and find the root cause of these errors Required by HQ Directorate H Report Generate a list of contracts showing FULL YEAR and YTD execution rate on contracted and paid amounts Directorate D & E Report View variance between actual & forecast on a YTD and Semester View Decision Absorption Period Report Analyze the absorption period by decision with drill-down possibilities Risk by Contract Report View forecast and comment by contract and by risk level Risk by Decision Report Generate a list of decisions showing the RAC, RAP & RAL as well as the forecast on all risk levels by semester and FULL YEAR

64 Reporting Reporting Filters
Intro Access Draft Contract Encoding Validation Reporting Risk Free = Amounts encoding template Risk Weighted = Amounts encoded re-calculated based on the risk level Reporting Filters Select the year of the forecast Decided/ Contracted/ Paid/ Decommitted_CTR/ Decommitted_DEC Select the Delegation/ Unit/ Directorate/ DEVCO/ ALL_DG Select the period when the forecast was validated Full Year = Forecast vs Actual of all year Year-to-Date = Forecast vs Actual till the current month of the year Select figures FED / BUDGET / ALL Select the forecast version to analyse The present selection : See Paid Risk Weighted forecast of year 2015 validated by HQ in 2014 (validation period) for FED & BUDGET. The execution rate will be calculated on a FULL YEAR basis.

65 Reporting Initial version validated in January
Intro Access Draft Contract Encoding Validation Reporting Initial version validated in January Mid-Year version validated in July Ongoing version (example: current month is September) N N+1 J F M A S O N D J F M A S O N D Initial Forecast N N+1 J F M A S O N D J F M A S O N D ACTUAL Mid-Year Forecast N N+1 J F M A S O N D J F M A S O N D ACTUAL Mid-Year Forecast

66 Reporting Intro Access Draft Contract Encoding Validation Reporting Year-to-Date and Full-Year Execution Rate (example: current month SEP) If the current month is JUL, the version is Mid-Year validated in year N and you select YTD, the execution rate will be very good as you compare ACTUAL vs FORECAST (in this case ACTUAL as the Mid-Year version takes actual for Semester 1 of year N). YTD FULL YEAR ACTUAL FORECAST JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Left to Implement NOV DEC


Download ppt "BPC User Manual October 2015."

Similar presentations


Ads by Google