GHTP, LEHRA MOHABBAT GHTP, LEHRA MOHABBAT STAGE I 2 x 210 MW (420MW) Commissioned.

Similar presentations


Presentation on theme: "GHTP, LEHRA MOHABBAT GHTP, LEHRA MOHABBAT STAGE I 2 x 210 MW (420MW) Commissioned."— Presentation transcript:

1 GHTP, LEHRA MOHABBAT GHTP, LEHRA MOHABBAT STAGE I x 210 MW (420MW) Commissioned in STAGE II 2 x 250 MW (500MW) Commissioned in 2008

2 TECHNICAL DETAILS BOILERS:
a) Type = Natural circulation, water tube, single drum with radiant reheat semi outdoor unit. b) Make = Bharat Heavy Electricals Limited Stage I Stage II c) Capacity T / hour 810 T/hour d) Steam Pressure 155 Kg/cm Kg/cm2 e) Steam Temperature 540° C 540° C

3 TECHNICAL DETAILS TURBINE:
a) Type = Tandem coupling type. Three cylinder, reheat condensing turbine with HP Bypass and LP Bypass system. b) Make = BHEL (KRAFT WERK UNION CO.,GERMANY) Stage I Stage II c) Rated output 210 MW 250MW d) Rated speed rpm 3000rpm e) Inlet steam pressure 150 Kg/cm Kg/cm2 f) Inlet steam temperature 535° C 535° C

4 TECHNICAL DETAILS Stage I Stage II CONDENSER: Area 11500 M2 15468M2
Cooling Water Flow M3 /hr M3/hr. CONDENSATE AND FEED CYCLE PUMP: a) Condensate Pump 2 No No. Capacity M3 /hr M3 /hr b) Boiler feed Pump 3 No No. Capacity M3 /hr M3/hr. Head MWC MWC

5 TECHNICAL DETAILS Generator: a) Make Bharat Heavy Electricals Limited
Stage I Stage II b) Capacity (i) 210 MW 250MW (ii) 247 MVA 294MVA c) Voltage Volts Volts d) Current Amp Amp.

6 YEAR WISE GENERATION (In MUs)
Year Generation

7 PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR (%)

8 SPECIFIC FUEL CONSUMPTIONS

9 HEAT RATE

10 THERMAL EFFICIENCY

11 NO. OF TRIPPINGS

12 % Make up of DM Water

13 Auxiliary Consumption (%) Net

14 HIGHLIGHTS OF PERFORMANCE OF GHTP, LEHRA MOHABAT during 2010-11
GHTP, Lehra Mohabbat has been awarded First National Energy Conservation Award 2010 (First prize at National level)) by Hon’ble Power Minister of India on 14th December 2010. Lowest ever annual Auxiliary Consumption: 8.08% Stage-II units have entered in 96th day of its longest ever continuous run from to till date ( ) without any tripping surpassing the previous record of days from to   Stage-I units have achieved their longest ever continuous run of 96.2 days from to without any tripping surpassing the previous record of days from to   Unit 3 has entered in 108th day of its longest ever continuous run after capital over haul from to till date ( )) without any interruption.

15 AWARDS & INCENTIVES WON BY GHTP
GHTP, Lehra Mohabbat has been awarded First National Energy Conservation Award 2010 (First prize at National level)) by Hon’ble Power Minister of India on 14th December 2010. Gold Shield for the Year Presented by Hon’ble President of India for Outstanding Performance. Silver Shield for the Years , for good Performance. Presented by Hon’ble Power Minister, Government of India. Bronze Shield for the Year Presented by Hon’ble Prime Minister of India for Outstanding Performance. Certificate of Merit for years 2001, 2002 & 2003 for reduction in Specific Secondary Fuel Oil consumption.

16 AWARDS & INCENTIVES WON BY GHTP
Certificate for Meritorious performance for the year for Meritorious Performance Awarded by Hon’ble Power Minister, Government of India. Silver Medal for the Year Meritorious Productivity Award for the year Incentive Award for the calendar year 2000, for reduction in the secondary oil consumption. Incentive Award for the calendar year 2000, for reduction in the Auxiliary consumption.

17 ENVIRONMENT FRIENDLY PLANT - GHTP, LEHRA MOHABAT
ESP of % efficiency has been provided with each unit to keep the atmosphere pollution within permissible limits. Punjab State Electricity Board is very particular about providing effective pollution control measures so that environment remains healthy.

18 POLLUTION CONTROL DEVICES:
Following Pollution Control devices have been provided at GHTP, Lehra Mohabbat: - 1.      Electrostatic Precipitators (ESPs) having efficiency of %. 2.      220 Mts. high RCC Multi Flue Chimneys. 3.      Dust suppression system consisting sprinkling of water to check the fugitive emissions. 4.      Dust Extraction System consisting of Cyclone Separators & Bag Fillers to arrest coal dust.

19 AIR POLLUTION MONITORING STATIONS:
A)   ON LINE MONITORS have been provided on the Chimneys to monitor the suspended particulate matter, Oxides of Nitrogen and Sulphur and the results are monitored regularly. B) Four No. Ambient Air Stations have been fixed at the following locations: - i)       GHTP Field Hostel. ii) Village Lehra Mohabat. iii) Patti Karam Chand, (Village Mehraj) iv)   Village Lehra DhurKot.

20 DRY ASH UTILISATION: Huge quantity of Ash generated is a major cause of concern for GHTP management. Therefore, a target has been fixed to use 100% ash generated by the Thermal Plant. To encourage utilization of fly ash, Ash is being supplied to M/s Gujrat Ambuja and M/s Vikram cement units and other various medium and small cement grinding units in Punjab, HP and J&K free of cost.

21 MAIN CONTROL ROOM GHTP, LEHRA MOHABAT

22 COAL STACKING & RECLAIMIMG

23 WAGON TIPPLER IN COAL HANDLING PLANT

24 220KV SUB STATION GHTP, LEHRA MOHABAT

25 ASH SILO - DRY ; DRY FLY ASH COLLECTION