Presentation is loading. Please wait.

Presentation is loading. Please wait.

GuoNeng Electricals, China

Similar presentations


Presentation on theme: "GuoNeng Electricals, China"— Presentation transcript:

1 GuoNeng Electricals, China
GNE

2 Business Sectors Power Generations – Energy Solutions
Project Engineering Machinery Supply Auto Control Solutions Parts & Services Environmental Protections – Total Solutions Thermal power plant by burning urban garbage Ethonol Vinasse treatment GNE

3 Power Generation-Thermal
Steam Boiler CFB/PC/Bagasse/Biomass Steam Turbine Condensing/Extraction/Back Pressure Turbo Generator Direct Coupling/Gearbox, Air/Hytrogen Cooling Total Controls DCS/PLC, Instrumentations GNE

4 Power Generation-Hydro
Hydro Turbine Axial Inflow/Intrusion/Pressure Inflow Hydro Generator Single Shaft/Gearbox Total Controls DCS/PLC, Instrumentations GNE

5 Power Generation-Thermal
Business Associated with: CNIEC, CHEC GXYA China Science Group Hualan Engineering Top Brands of Manufacturers …… GNE

6 Sound Track Thermal Power Plants: CFB/PC boiler t/h, Steam Turbine 15-50mw,major boiler, turbine, generator plus auxiliaries, 3 sets Heat and Power Plants for Sugar Mills:bagasse boiler 35-85t/h, turbo generator 3-12mw,major boiler, turbine, generator plus auxiliaries, 5 sets Heat and Power Plants for Textile, Chemical Mills:CFB/PC boiler t/h turbo generator 3-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets Thermal Power Plants of Burning Urban Garbage:CFB boiler 35-65t/h, turbo generator 6-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment 600t/d Auto Controls: DCS, PLC, Instrumentations: 60 sets Hydro Power Plant:3-10mw: major boiler, turbine, generator plus auxiliaries, 2 sets GNE

7 Typical Thermal Power Plant
Huaxing Power Plant, Baise, China Boiler:1*220t/h CFB, 9.81MPa, 540℃ Turbo Generator: 1*50MW, 9.0MPa, 500℃ Completion: Dec., 2004 Notes: Second hand turbo generator, made in 1959 Total Plant Turbo Generator Feed Pumps Control Room DCS Operator Station GNE

8 Captive Power Plant (1) GNE Deyongjia Garment Plant, Dongguan, China
Boiler:4×75t/h, CFB, 3.98MPa, 450℃ Turbine:15MW 3.5MPa 435℃ DCS:BTG synchronized auto controls Date of Completion: May, 2001 Total Plant TG Set Coal Conveying Control Room Power Panels GNE

9 Captive Power Plant (2) GNE
#1、#2、#3、#4 Boiler auto controls, Baiganhua Sugar Mill, Baise, China Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters GNE

10 Power Plant – Burning Garbage
Dongguan Garbage Power Plant, 2×15+1×12mw, 1200t/d garbage handling, Guangdong, China Ningbo Garbage Power Plant, 2×15mw, 800t/d garbage handling, Zhejiang, China Boiler:65t/h CFB, 3.98MPa 450℃ Turbo Generator:15mw, 3.5MPa, 435℃ Date of Completion: Dongguan-March, 2005, Ningbo-Dec., 2005 Dongguan Plant Ningbo Plant Turbo Generator Control Room CFB Boiler GNE

11 International Projects
AA Group, 300t/h, CFB,Biomass, Thailand Boiler:300t/h, CFB, 9.8MPa, 540℃ Date of Completion:under construction, to commissioning in Oct. 2008 Signing Ceremony Technical Agreement Signing China Representatives Site Survey Site Survey GNE

12 International Projects
SSYPL, 2*35t/h, CFB,2*7.5MW STG, India Signing of contract with SSYPL Signing Ceremony GNE

13 International Projects
Lhoknga 2×16MW Power Plant EP Project, Indonesia Boiler:75t/h,CFBC Boiler, 3.9MPa, 450℃ Steam turbine and generator:15MW, 3.5MPa, 435℃ Associated with CHEC, 2006 Used plant package supplied to Indonesia, 2008. Boiler: 2×75t/h,CFBC Boiler, 3.9MPa, 450℃ Steam turbine and generator:2×15MW, 3.5MPa, 435℃ HFO DG Sets, 4×10MW, 2008, package supplied to Indonesia 4×10MW, HFO DG Sets Associated with GD Imp/Exp Corp. GNE

14 International Projects
India KPPL 2×25MW thermal power plant EP Project Boiler:2×130t/h, PC Boiler, 3.9MPa, 450℃ Steam turbine and generator:2×25MW, 3.5MPa, 435℃ Contract Signing GNE

15 Typical International Projects
SSYPL, Surat, India - Boiler: CFB, 2x35t/h, 3.82MPa, 450 ℃ - TG: 2x7.5MW, 3.82MPa, 435 ℃ GNE

16 DCS Applications GNE Typical DCS installed: XDPS-400, Shanghai Xinhua
MACS, Beijing Hollysys WebField ECS-100, Supcon PCS7, Siemens Florence 2000, ABB UMC-800/HC900, Honeywell GNE

17 PLC Applications GNE Typical PLC installed: S7-200/S7-300, Siemens
Schneider Allen Bradley FX2N, Mitsubishi GNE

18 Installed Instrumentations
Pressure Transmitters 50MW Turbo Generator Drum leveler Temprature Probe Speed Sensors Generator Hydrogen Cooling Sony Video Camera Industrial Monitors GNE

19 Typical Projects GNE Honeywell HC-900 DCS system
#1、#2、#3、#4 Boiler auto controls, Baiganhua, Baise, China Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters GNE

20 GuoNeng Electricals Ltd.
Addr.: Rm1612, Xincheng Int’l Bldg, No.92-1, Nanning, Guangxi, China Tel: - Fax: 0771- GNE


Download ppt "GuoNeng Electricals, China"

Similar presentations


Ads by Google