1 4TH QUARTER PERFORMANCE REPORT 2014/15 PRESENTATION
DEPARTMENT OF WOMEN 4TH QUARTER PERFORMANCE REPORT 2014/15 PRESENTATION PORTFOLIO COMMITTEE ON WOMEN 19 MAY 2015 Ms Jenny Schreiner

2 Fourth Quarter Performance Overview against Predetermined Objective
TABLE OF CONTENTS Purpose Introduction Fourth Quarter Performance Overview against Predetermined Objective Programme Performance for each Programme 2

3 PURPOSE To present the 4th quarter performance report for the 2014/2015 financial year, including challenges confronting the department in pursuit of achieving the targets as outlined in the revised Department’s Annual Performance Plan 3

4 INTRODUCTION On 25 May 2014 the President of the Republic of South Africa, announced the appointment of the Minister in The Presidency responsible for Women who is mandated to lead, coordinate and oversee the transformation agenda on women’s socio-economic empowerment, rights and equality. National Macro Organisation of the State (NMOS) Project, with regards to the transfer of functions relating to the support of people with disabilities and children to the Department of Social Development was finalised in October 2014. 4

5 INTRODUCTION The focus on NMOS process and resignation of some key personnel such as the Accounting Officer, DDG: WEGE, Chief Director: Stakeholder Coordination, Director: Communication, Chief Director: Communication, Director HR, Director: Internal Audit and Deputy Director: Financial Accounting contributed in the Department not being able to manage service delivery effectively. 5

6 OVERVIEW PERFORMANCE INFORMATION
The figure below illustrates that out of 22 targets planned for the fourth quarter of the 2014/15 financial year, the department achieved 8 targets (36%) while 14 targets (64%) were not achieved. Figure 1: Overview Performance Information 6

7 DEPARTMENTAL FINANCIAL PERSPECTIVE
The table below illustrates that the department’s projected expenditure was R 184 ,764 million for the year 2014 / 15 and that the actual expenditure amounted to R 182, 930 million, with an under expenditure of R 1,834 million. Therefore the department has spent 99% of its budget as at 31 March 2015. Figure 2: Department s Financial Performance for the 4th Quarter Programme Adjusted Appropriation Projected Spending Plan 31/03/2015 Projected Spending Plan % Actual Expenditure 31/03/2015 % Spent R’ 000 Administration 79 443 100% 78 960 99% SOCIAL, POLITICAL AND ECONOMIC PARTICIPATION AND EMPOWERMENT 85 546 85 280 RESEARCH, POLICY COORDINATION AND KNOWLEDGE MANAGEMENT 8 002 7 686 96% MONITORING, EVALUATION AND OUTREACH 11 773 11 004 93% TOTALS 7

8 DEPARTMENTAL FINANCIAL PERSPECTIVE
Figure 2: Department’s Financial Performance for the 4th Quarter 8

9 PROGRAMME 1: PERFORMANCE INFORMATION
The figure below illustrates that out of 11 targets planned for the fourth quarter of the 2014/15 financial year, Programme 1 (Administration) achieved 7 targets (64%) while 4 targets (36%) were not achieved. Figure 3: Performance Information 9

10 PROGRAMME 1,FINANCIAL PERFORMANCE
The table below illustrates that out of the total planned budget projection of R 79, 443 million for the year 2014/15, the actual expenditure was R 78 ,960 million, with an under expenditure of R 483 thousands. Therefore, Programme 1 has spent 99% of its budget as of 31 March 2015. Figure 3: Financial Performance Programme 1 Sub Programme Adjusted Appropriation Projected Spending Plan 31/03/2015 Projected Spending Plan % Actual Expenditure 31/03/2015 % Spent R’ 000 MINISTRY 23 435 100% 23 765 101% MANAGEMENT 8 798 8 314 94% CORPORATE SERVICES 23 275 24 469 105% FINANCIAL MANAGEMENT 13 919 13 916 OFFICE ACCOMODATION 10 016 8 496 85% TOTALS 79 443 78 960 99% 10

11 PROGRAMME 1,FINANCIAL PERFORMANCE
Figure 3: Financial Performance Programme 1 11

12 PROGRAMME 1: PERFORMANCE INFORMATION
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made for Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Departmental Management Number of Internal Audit Reports issued 4 1 Not Achieved Capacity constrains within the reporting period Internal Audit Director assumed duty on 1 April 2015 12

13 PROGRAMME 1: PERFORMANCE INFORMATION
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made for Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Financial Management Percentage of all service providers paid within 30 days 100% Out of invoices, 69 were paid outside of 30 days, which equals 7.6% Not Achieved The delays were as follows: 12 Invoices due to banking detail verification 57 Invoices due to delay of certification by end users 13

14 PROGRAMME 1: PERFORMANCE INFORMATION
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made for Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Financial Management Percentage of deviation on expenditure against allocated funding 5% The In Year Monitoring Reports were submitted on time for the reporting period. There was a deviation of 1% on expenditure against allocated funding Achieved N/A 14

15 PROGRAMME 1: PERFORMANCE INFORMATION
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made for Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Corporate Management Number of ICT operations and governance reports 3 1 The ICT Operations and Governance report developed and approved by DDG: CM Achieved N/A 15

16 PROGRAMME 1: PERFORMANCE INFORMATION
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made for Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Corporate Management Number of departmental wide risk assessments conducted 1 The process of review and updating of the risk registers was not finalised Not Achieved Non availability of risk owners because of other commitments has an impact on the finalisation of risk registers. The circular to institutionalise Risk management to all business processes has been approved and circulated to managers. Number of reports on fraud prevention measures Forensic investigation was coordinated . The Director: Risk Management also tasked with the functions of Internal Audit (Capacity constraints) A consolidated report covering all aspects of Fraud Prevention measures will be developed in the 1st quarter 2015/16 Director: Internal Audit position filled. 16

17 PROGRAMME 1: PERFORMANCE INFORMATION
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made for Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Corporate Management Number of Legal services management reports 2 1 Legal Services Management Reports for fourth quarter developed and approved by DDG: CM Achieved N/A Number of HR oversight reports 4 Q 3 Oversight report developed and approved 17

18 PROGRAMME 1: PERFORMANCE INFORMATION
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made for Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Corporate Management Number of status reports on facilities and security 2 1 1 report on facility and security produced Achieved N/A Number of strategic plans prepared (strategic plan and annual plan) Strategic Plan submitted to Parliament Annual Performance Plan 2015/16 submitted to Parliament Strategic Plan and APP printed and tabled in Parliament 18

19 PROGRAMME 1: PERFORMANCE INFORMATION
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made for Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Corporate Management Number of periodic strategic reports prepared (quarterly, annual and MPAT) 6 1 Q4 report developed Achieved N/A 19

20 PROGRAMME 2:SOCIAL, POLITICAL AND ECONOMIC PARTICIPATION AND EMPOWERMENT
The figure below illustrates that out of 3 targets planned for the fourth quarter of the 2014/15 financial year, Programme 2 SPEPE out of 3 targets all of them were not achieved (0%). Figure 4: Performance Information 20

21 PROGRAMME 2,FINANCIAL PERFORMANCE
The table below illustrates that out of the total planned budget projections of R 85 ,546 million for the year 2014/15, the actual expenditure was R 85 ,280 million with an under expenditure of R 266 thousands. Therefore, Programme 2 has spent 100% of its budget as of 31 March 2015. Figure 5: Financial Performance Programme 2 Sub Programme Adjusted Appropriation Projected Spending Plan 31/03/2015 Projected Spending Plan % Actual Expenditure 31/03/2015 % Spent R’ 000 MAN: SOCIAL, POLITICAL AND ECONOMIC PARTICIPATION AND EMPOWERMENT 11 878 100% 10 231 86% SOCIAL & RELATED FUNCTIONS 6 427 7 814 122% JUSTICE & PUBLIC ORDER 2 0% GOVERNANCE & ADMINISTRATION ECONOMIC EMPOWERMENT CGE 67 235 TOTALS 85 546 85 280 21

22 PROGRAMME 2,FINANCIAL PERFORMANCE
Figure 5: Financial Performance Programme 2 22

23 PROGRAMME 2: SOCIO ECONOMIC PARTICIPATION AND EMPOWERMENT
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Economic Empowerment Number of consultations conducted on Gender Responsive Budgeting (GRB) Integration Plan 2 (DPME & National Treasury) Report on the DPME GRB Integration Plan The DPME has worked with the Department to finalize the GRB indicators and recommend for their inclusion into the National Development Plan for all institutions to plan, implement and account Not achieved The reports were developed however with the resignation of the DG there was a delay in signing them To re- routed for signing of by the DG in 1st quarter 2015/16 23

24 PROGRAMME 2: SOCIO ECONOMIC PARTICIPATION AND EMPOWERMENT
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Social Empowerment Number of implementation arrangements/protocol facilitated for young women’s access and participation in the STEM field 2 reports developed on recruitment and placement of young women in the STEM Report on the placement of young women in newly identified STEM companies developed The recruitment of techno girls has been done by the implementing institution (UWESO) and the Department of Basic Education in the Provinces. Companies where the girls will be placed during the March/April holidays have been identified as well and contract with them have been drawn up and signed Not achieved The reports were developed however with the resignation of the DG there was a delay in signing them To re- routed for signing of by the DG in 1st quarter 2015/16 24

25 PROGRAMME 2: SOCIO ECONOMIC PARTICIPATION AND EMPOWERMENT
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Social Empowerment Review institutionalisation of gender focal points Report on gender focal points Report on the review of gender focal points Report on the review of research findings on GFPs and previous cabinet decisions developed Not achieved The reports were developed however with the resignation of the DG there was a delay in signing them To re- routed for signing of by the DG in 1st quarter 2015/16 25

26 PROGRAMME 3:RESEARCH, POLICY COORDINATION AND KNOWLEDGE MANAGEMENT
The figure below illustrates that out of 1 target planned for the fourth quarter of the 2014/15 financial year, Programme 3 RPCKM target was not achieved, that is (0%). Figure 6: Performance Information 26

27 PROGRAMME 3,FINANCIAL PERFORMANCE
The table below illustrates that out of the total planned budget projections of R 8 ,002 million, the actual expenditure was R 7 ,686 million, with an under expenditure of R 316 thousands. Therefore, Programme 3 has spent 96% of its budget in the as of 31 March 2015 Figure 7: Financial Performance Programme 3 Sub Programme Adjusted Appropriation Projected Spending Plan 31/03/2015 Projected Spending Plan % Actual Expenditure 31/03/2015 % Spent R’ 000 MANAGEMENT: RESEARCH, POLICY COORDINATION AND KNOWLEDGE MANAGEMENT 2 100% 0% RESEARCH MANAGEMENT 4 987 3 942 79% POLICY ANALYSIS & COORDINATION 3 011 3 744 124% INFORMATION & KNOWLEDGE MANAGEMENT TOTALS 8 002 7 686 96% 27

28 PROGRAMME 3,FINANCIAL PERFORMANCE
Figure 7: Financial Performance Programme 3 28

29 PROGRAMME 3: RESEARCH, POLICY COORDINATION AND KNOWLEDGE MANAGEMENT
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Phase 1 report on the status of women’s socio- economic empowerment developed One report (Phase 1 Draft) developed Phase 1 report developed Phase 1 of Report on the Status of Women’s Socio-Economic empowerment was achieved. Progress was first a successful meeting that was held with stakeholders from other departments and some Chapter Nine Institutions and NGO’s Not Achieved 2 Directors transferred to DSD and available capacity deployed to Community dialogues and Izimbizo’s Deferred to 1st quarter 2015/16 29

30 PROGRAMME 4: MONITORING, EVALUATION AND OUTREACH
The figure below illustrates that out of 7 targets planned for the fourth quarter of the 2014/15 financial year, Programme 4, ME&O achieved 1 (14%) target while 6 (86%) targets were not achieved. Figure 8: Performance Information 30

31 PROGRAMME 4,FINANCIAL PERFORMANCE
The table below illustrates that out of the total planned budget projections of R 11 ,773 million, the actual expenditure was R 11, 004 million, with an under expenditure R 769 thousands. Therefore, Programme 4 has spent 93% of its budget as of 31 March 2015. Figure 9 : Financial Performance Programme 4 Sub Programme Adjusted Appropriation Projected Spending Plan 31/03/2015 Projected Spending Plan % Actual Expenditure 31/03/2015 % Spent R’ 000 MANAGEMENT: MONITORING, EVALUATION & OUTREACH 2 100% 0% MONITORING & EVALUATION 7 780 3 678 47% STAKEHOLDER COORDINATION OUTREACH INITIATIVES 3 989 7 326 TOTALS 11 773 11 004 93% 31

32 PROGRAMME 4,FINANCIAL PERFORMANCE
Figure 9 : Financial Performance Programme 4 32

33 PROGRAMME 4:MONITORING, EVALUATION AND OUTREACH
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Monitoring and Evaluation M&E norms and standards for women’s socio- economic empowerment and realisation of their rights developed 1 set of norms and standards with indicators and targets developed Draft norms and standards developed A draft Document on Norms and Standards developed Achieved N/A 33

34 PROGRAMME 4:MONITORING, EVALUATION AND OUTREACH
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Monitoring and Evaluation Number of compliance reports to regional, continental and international commitments 4 reports on compliance to regional, continental and international commitments SADC protocol on gender and development report developed CEDAW report developed Beijing +20 Reports redrafted, consulted on with DG Clusters, and two civil society meetings, and Cabinet approved. Foreword by President and Preface by Minister drafted and submitted to Minister Solemn Declaration Report finalised and presented to Minister Two reports on CEDAW and Responses to CEDAW Concluding Observations drafted. Not Achieved Not able to compile SADC Report as time was redirected to finalising B+20 Report All incomplete reports will be completed in First Quarter of 2015/16 34

35 PROGRAMME 4:MONITORING, EVALUATION AND OUTREACH
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Stakeholder Coordination Number of reports produced on strategic multilateral relations 2 reports on the country’s participation in multilateral engagements Report on the country’s participation in the 59th Session of the United Nations (UN) – Conference on the Status of Women scheduled for February/March 2015 in New York, USA. Draft Report developed Not Achieved Chief Director: Stakeholder Coordination resigned and Director: Stakeholder Coordination transferred to DSD (Capacity constraints) To capacitate the Chief Directorate 35

36 PROGRAMME 4:MONITORING, EVALUATION AND OUTREACH
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Stakeholder Coordination Number of reports produced on strategic multilateral relations 2 reports on the country’s participation in multilateral engagements Report on the country’s participation in the 59th Session of the United Nations (UN) – Conference on the Status of Women scheduled for February/March 2015 in New York, USA. Draft Report developed Not Achieved Chief Director: Stakeholder Coordination resigned and Director: Stakeholder Coordination transferred to DSD (Capacity constraints) To capacitate the Chief Directorate 36

37 PROGRAMME 4:MONITORING, EVALUATION AND OUTREACH
Performance Indicator Annual Target 2014/15 Q4 Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Stakeholder Coordination Number of reports on Stakeholder consultation Consultation on thematic areas for UN-CSW Country Position paper for the UN-CSW Draft Country Report developed Not Achieved Chief Director : Stakeholder Coordination resigned and Director: Stakeholder Coordination transferred to DSD (Capacity constraints) To capacitate the Chief Directorate 37

38 PROGRAMME 4:MONITORING, EVALUATION AND OUTREACH
Performance Indicator Annual Target 2014/15 Q4Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Communication and Outreach Initiative Gender based Violence Communication Strategy developed Gender based Violence Communication Strategy developed Gender based Violence (365) Communication Strategy in place Draft Gender based Violence (365) Communication Strategy developed Not Achieved Chief Director Communication resigned and Director position vacant (Capacity constraints) To be resubmitted for approval Number of outreach campaigns conducted 2 Outreach campaigns conducted 365 GBV awareness campaign implementation plan Draft Concept & Implementation Plan To be finalized in the 1st quarter of 2015/16 financial year 38

39 PROGRAMME 4:MONITORING, EVALUATION AND OUTREACH
Performance Indicator Annual Target 2014/15 Q4Target Description of progress made in Q4 Performance Status Reason for Deviation Corrective measures Sub-programme: Communication and Outreach Initiative Number of corporate documents finalised and submitted 2 corporate documents developed Corporate Identity Manual developed Draft Corporate Identity Manual developed Not Achieved Chief Director Communicati on resigned and Director position vacant (Capacity constraints) To be resubmitted for approval 39

40 Departmental Performance Scores for Quarter 1, 2, 3 and 4 in 2014/15:
CONCLUSION Departmental Performance Scores for Quarter 1, 2, 3 and 4 in 2014/15: 40

41 CONCLUSION Department Performance in the 3rd quarter was higher (78%) compared to 1st (60%) and 2nd (44%) quarter however in the 4th quarter dropped drastically to 36% due to the high number of SMS resignation in the fourth quarter. 2nd quarter was also not a good performance of the Department with 44% due to the Department`s focus on ENMOS. The establishment of the DoW in 2014 represents a firm recognition by the President that the achievement of gender equality and the realisation of women’s rights require consolidation and effective coordination. The DoW has developed a budget programme structure that will enable it to achieve this strategic objective. The process of designing an organogram that will enable the DoW to attract, develop and retain professional high-end skills and secure adequate financial resources is underway. The Department believes that this process will improve performance in next financial year 2015/16. 41

42 THANK YOU 42