Presentation is loading. Please wait.

Presentation is loading. Please wait.

BNSF Master Template – March 2012

Similar presentations


Presentation on theme: "BNSF Master Template – March 2012"— Presentation transcript:

1 BNSF Master Template – March 2012
DriveCam “Fleet Tracking” November 1, 2017 SACP Meeting 4/11/2019

2 Fleet Tracking What is Fleet Tracking: Through GPS, provides the ability to monitor real-time location, movements, status and behavior of BNSF fleet Some of the uses are: Location Identification Route History Vehicle Utilization Geo-Fence Settings and Alerts Positive Identification of Driver During Speeding Events (Not currently planned) HOS DOT BSM Telematics – All vehicles 10,000 lbs. or above…most all Med and Heavy Duty Vehicles. HLCS installed in 3300 hy-rail vehicles. Will track location information when vehicle is running. DriveCam – Can provide Real time GPS Tracking, GEO Fencing, Bread crumb, Idling, Speeding…

3 Real Time Status with Google Maps
See the status of your entire fleet Real-time status of your entire fleet location, status, traffic and ETA Get idle, departure and estimated arrival times so you can make fast decisions Real-Time groupings and smart search make it easy to see the status of your fleet

4 Real Time Status with Google Maps
Get individual vehicle details Google Street view provides panoramic views of location External View Only

5 Locate Closest Driver Enter an address and Fleet Tracking will Find your closest drivers and give you an approximate distance and ETA.

6 Animated Driver History
Replay driver routes, starts, stops and idle times Documents time spent at every point in the route. Trail points available for up to 60 days standard.

7 Benefits Benefits: Provides ability to quickly locate vehicle in case of emergency Locate stolen vehicles Provides alerts when vehicles are in locations for long periods of time (maintenance shops as an example) Provides route history to assist in optimizing future work schedules Assist in providing more accurate ETA’s Mobile access

8 Potential Next Steps Division Pilot:
Red River, Montana, and California Estimated Pilot Start Date – January 2018 Next Steps Conduct Q&A with Labor General Chairmen – SACP Educate Field Officers at Pilot Location Kickoff Pilot – Review at end of 60 days Assess Value and Go-forward Options


Download ppt "BNSF Master Template – March 2012"

Similar presentations


Ads by Google