Presentation is loading. Please wait.

Presentation is loading. Please wait.

Site Design and Operational Consideration session three

Similar presentations


Presentation on theme: "Site Design and Operational Consideration session three"— Presentation transcript:

1 Site Design and Operational Consideration session three

2 Designing a Facility Right for Your Community
Reservation Rural Urban Wooded Agricultural What will you be composting-Waste Audit Yard Waste Food Waste Animal Waste Bio-solids

3 Designing a Facility Right for Your Community
Compost Usage Internal only Tribal member usage Sale for outside use Assess Your Current Resources Staff Equipment Land Contracts

4 Designing a Facility Right for Your Community
Site Considerations Established roadways Usage Tribal Members Large Trucks Heavy Machinery Gate or Fenced Restroom Facilities Odor-nearby residences or businesses


Download ppt "Site Design and Operational Consideration session three"

Similar presentations


Ads by Google