Presentation is loading. Please wait.

Presentation is loading. Please wait.

Accredited Standards Committee C63® - EMC

Similar presentations


Presentation on theme: "Accredited Standards Committee C63® - EMC"— Presentation transcript:

1 Accredited Standards Committee C63® - EMC
Main Committee Daniel Hoolihan Chair 11 May 2017

2 Accredited Standards Committee C63® - EMC
Chairman’s Report May 2017 Meeting Welcome to all Members and Guests Thanks to A2LA for hosting this series of meetings Next Meeting – November 6-9, 2017 ETS-Lindgren, Cedar Park/Austin - TX

3 Accredited Standards Committee C63® - EMC
Chairman’s Report C63 Standards Standards Published Since Last Meeting– C63.2 – January – 2017 C63.5 – May – 2017 C63.27 – May

4 Accredited Standards Committee C63® - EMC
Publication Date COMMENTS C63.5 May Revised Standard C63.27 NEW Standard C63.2 February C63.16 May C63.12 January C63.26 C63.7 March C63.14 December C63.9 October Reaffirmed C63.18 June C63.4 C63.17 October Revised Standard  C63.10 September C63.23 March NEW Standard  C63 Standards

5 Accredited Standards Committee C63® - EMC
Chairman’s Report C63 Committee Filing FCC – ET Docket No (RM-11652) Original Filing – 17 June 2013 Reply Comments were filed 31 July 2013 C63 Ex Parte Comments Filed on 8 January 2014 recommending the “incorporation by reference” of the newest versions of C63.10 (2013) and C63.17 (2013)

6 Accredited Standards Committee C63® - EMC
Chairman’s Report C63 Ex Parte Comments Filed 30 June 2014 and a Clarification of Ex Parte Comments Filed 8 July 2014 recommending the “incorporation by reference” of C63.4 (2014) FCC Published the Report and Order (R&O) in December of 2014 FCC published R&O in the Federal Register on June 12, 2015 Transition Period for ANSI C and ANSI C ends on July 13,2016

7 Accredited Standards Committee C63® - EMC
Chairman’s Report FCC Memorandum Opinion and Order and Order on Reconsideration – Postponed Transition Period ending July 13, 2017 AND stated that testing labs in non-MRA countries must be assessed by an FCC Recognized Test Firm Accrediting Body (TFAB). Test site validation requirements to CISPR16-1-4:2010 is still July 13, 2018. FCC recognized NIST/NVLAP and A2LA as FCC Recognized Test Firm Accrediting Bodies as of 23 March Valid for People’s Republic of China, Indonesia, India, Philippines, Russia, Switzerland, Thailand and Ukraine.

8 Accredited Standards Committee C63® - EMC
Chairman’s Report FCC WT – NPRM – FCC Hearing Aid Compatibility (HAC) Docket – Comments filed by Subcommittee 8 of ANSI-ASC C63R on February 28, 2016

9 Accredited Standards Committee C63® - EMC
Chairman’s Report FCC Public Notice on C63.26 Should C63.26 be adopted for use by the FCC? Comments were due 5 May 2016; reply comments were due 15 May 2016 As of May of 2017, no adoption by FCC

10 Accredited Standards Committee C63® - EMC
Membership Issues New Members Changes in Organizational Membership Blackberry, ACS, and Motorola Mobility have been dropped from active membership Changes in Membership TUV SUD America acquired ACS Blackberry and Motorola Mobility did not renew their membership

11 Accredited Standards Committee C63® - EMC
Motion from the Steering Committee Recommended procedure for PINS will be to (1) use the word version of the PINS when initiating a PINS at the working group or subcommittee level; (2) obtain main committee approval of the PINS; (3) the secretary of the main committee will submit the PINS to Sue Vogel; (4) Sue will populate the web-based PINS Form and submit it to ANSI.


Download ppt "Accredited Standards Committee C63® - EMC"

Similar presentations


Ads by Google