1 TÜRK TELEKOM OPERATION DEPARTMENT
ZEKERİYA ERKAN TÜRK TELEKOM OPERATION DEPARTMENT

2 CHANGES ? OPERATION TOPOLOGICAL COMPLEXITY SERVICE TYPES
PHYSICAL MEDIA POWER AIR CONDITIONING FTTX EQT.QUANTITY HUMAN RESOURCES SERVICE TYPES COMPLEXITY

3 Change details Topology Central Distrubuted Media copper Fiber Power
CHANGES BEFORE AFTER Topology Central Distrubuted Media copper Fiber Power Not needed Needed Air-conditioning Eqt. Quantity As needed (x) High (20 to 30 X *) * : For TT Case

4 Change details Service types Limited Multiple Complexity Low High
CHANGES BEFORE AFTER Service types Limited Multiple Complexity Low High Operation Easy Diffucult Human Resources-Headcount Qualification

5 FIBER BUILT-IN CABLING
Deployment Model FTTC Secondary Cable (copper) ≤ 250 mt F/O F/O F/O CENTRAL OFFICE TO STREET CABINET THROUGH FIBER CABLE STREET CABINET TO THE CUSTOMER THROUGH SECONDARY(COPPER) CABLE (MAX:250 mt) FTTH F/O FTTB ONT F/O FIBER BUILT-IN CABLING SPLITTER F/O CAT-6 BUILT-IN CABLING FIBER REACHES THE BOUNDARY OF LIVING SPACE FIBER REACHES THE BOUNDARY OF THE BUILDING, SUCH AS THE BASEMENT IN A MULTI-DWELLING UNIT, WITH THE FINAL CONNECTION TO THE INDIVIDUAL LIVING SPACE BY CAT-6 (COPPER CABLE) Depending on the type of area, income level, topology and conditions of competition, FTTH, FTTB or FTTC solutions are implemented. FTTH Selected greenfield areas, industrialized areas FTTB Existing customers, business areas, high income residences, etc. FTTC Locations where rapid transformation is required and use of local cable is feasible

6 Battery- Back up time(hrs)
FTTX SPECIFICATIONS Cabinet Types Application PSTN Ports DSL Ports Total Power consumption(w) Battery- Back up time(hrs) Type A FTTC 1472 896 2368 1000 6-8 Type B 960 216 1176 500 6-10 Type C 768 1728 700 7-10 Type D 192 72 264 100 8-12 Type E FTTB 64 48 112 70 3-6 Type F 24 30 1,5 - 3

7 DISASTER-EARTHQUAKE Scenerio 1 : Earthquake on large FTTX deployed area Assumptions Main Telecom buildings are not damaged AC Mains is off Aftershocks are expecting Collapsed or Destroyed; Buildings Telecom İnfrastructure (Ducts, Pipes, Cables, Equipments …) High amount of incoming voice and Data traffic towards Disaster area Goverment agencies Relief agencies Press agencies ………

8 DISASTER-EARTHQUAKE RESULTS Telecom infrastructure destroyed and out of service There is no way to quickly recover infrastructure and provide service other than Mobile capabilities.

9 EFFECT OF EARTQUAKE

10 EFFECT OF EARTQUAKE

11 DISASTER-EARTHQUAKE Scenerio 2 : Earthquake on large FTTX deployed area Main Telecom buildings are not damaged AC Mains is off Aftershocks are expecting Some buildings collapsed destroyed others undamaged Telecom infrastructure (Ducts, Pipes, Cables, Equipments …) partially destroyed in some areas but still big portion un damaged High amount of incoming voice and Data traffic towards Disaster area Goverment agencies Relief agencies Press agencies ………

12 DISASTER-EARTHQUAKE RESULTS Telecom infrastructure destroyed and out of service in some areas Big Part of Network in good condition and works But still there is risk to loose all services Since Mains off, Fuel is running out, Battery back up times are exceeding How we can maintain services ?

13 DISASTER-EARTHQUAKE

14 DISASTER-FLOODING

15 Fiber cables more sensible pressure than copper cables
DISASTER-EARTHQUAKE Fiber cables more sensible pressure than copper cables Ring or mesh topoloji critical for FTTC cabinets Power shortage is very critical Spare FTTX equipment or boards and batteries Fire More network people to diagnose problems and put equipments in service