2
Clubhouse lower level Renovation
3
December 2013
4
Work Begins The following slides show the progression of work during the project of work during the project
5
Demolition Demolition of Men's washroom
6
Plumbing Relocation New Men's Washroom Existing Men's Shower
7
New Framing Framing of closet and new women's washroom New men's washroom entrance
8
New Framing Steel framing of ceilings to maximize height.
9
Drywall Drywall installation in progress Rounded corners on traffic exposed areas
10
Flooring Commercial grade Laminate flooring installation
11
Flooring Ceramic tile added to washrooms
12
Paint and trim Trim and paint completed
13
Kitchenette Cabinet installation
14
Storage New closet area New under-stair storage area
15
Before & After The following slides are before and after photos taken from after photos taken from approximately the same position approximately the same position.
16
Before
17
After
18
Before
19
After
20
Before
21
After
22
Before
23
After
24
Before
25
After
26
Before
27
After
28
Final Look The following slides show the completed Project and some fine details
43
Thank You Newson Interiors would like to thank all of the owners of Tweedsmuir on the Park for selecting us to complete this project. We hope years of enjoyment and entertainment are to come in the new space. Jeff.
44
Jeff Newson Owner/operator, Newson Interiors. newsoninteriors.com jeff@newsoninteriors.com 613-277-2740