Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ma-603 Mach 153B John Branlund.

Similar presentations


Presentation on theme: "Ma-603 Mach 153B John Branlund."— Presentation transcript:

1 Ma-603 Mach 153B John Branlund

2 Learning Objectives: Learn the use of ‘Loops ’ using the L word in g-code programs. Practice Incremental Positioning techniques. Dividing lengths of whole patterns into equal individual lengths.

3 Blueprint: Holes should be drilled to ¼” diameter.

4 1st Pattern: 7 holes between X-.75 and X-5.25
4.5 / 6 is the hole spacing in X

5 2nd Pattern: 8 holes between Y-.75 and Y-3.375
2.625 / 7 is the hole spacing in Y

6 3rd Pattern: 7 holes between
X-5.25 Y-3. X-.75 Y-1.5 X spacing is 4.5 / 6 and the Y spacing is 1.5 / 6

7 Writing the frame: Again, I used the Frame Maker to write the profile toolpath.

8 Writing the 1st Pattern:
Add T2 to your program. Position to the start of the row. Drill the first hole. Add next holes as INC & add L word.

9 2nd Pattern: Drill 1st hole of the second pattern in ABS.
Add next holes as INC & add L word.

10 3rd Pattern: Drill 1st hole of the second pattern in ABS.
Add next holes as INC X & Y and add the L word. Switch back to ABS and end cycle.

11 Conclusions: Looping is an effective method to create patterns that are equally spaced. The L word can also be used with subroutines which have been written in incremental positioning.


Download ppt "Ma-603 Mach 153B John Branlund."

Similar presentations


Ads by Google