VISER progress report on realization of the WP2, WP4, WP5, WP6, WP7, WP8 Dr Slavica Marinković, The School of Electrical and Computer Engineering of.

Similar presentations


Presentation on theme: "VISER progress report on realization of the WP2, WP4, WP5, WP6, WP7, WP8 Dr Slavica Marinković, The School of Electrical and Computer Engineering of."— Presentation transcript:

1 VISER progress report on realization of the WP2, WP4, WP5, WP6, WP7, WP8
Dr Slavica Marinković, The School of Electrical and Computer Engineering of Applied Studies, Belgrade DBBT project meeting, Unversity of Bihać/Univerzitet u Bihaću (UNBI), Bihać, July 2018. The School of Electrical and Computer Engineering of Applied Studies, Belgrade

2 Progress report WP2.1, WP2.2 and WP2.3
Report on deliverable 2.1 Purchase of hardware equipment, Purchase of software and 2.3 Purchase of literature has been sent to WP2 leader. All procured equipment within DBBT project has been introduced in VISER equipment inventory books. Each part of the equipment received its inventory number. All procurred literature has been introduced in VISER library nventory books. Each part book received its inventory number The scanned copies of library inventory books have been sent to WP2 leader. The scanned copies of equipment inventory books have been sent to WP2 leader. Remark: the latest equipment that was additionally approved by EACEA has not yet been evidenced in inventory books. The report will be updated with this latest equipment and sent to WP2 leader by mid-july.

3 Progress report WP2.4 Report on deliverable 2.4 Training the staff for the use of equipment finished and sent to WP2 leader. Training the staff for the use of equipment by experts form Universidad Politécnica de Madrid (UPM) on the 22nd of December 2017 at VISER Teacher training and Training the staff for the use of equipment by experts form business partner JP Emisiona tehnika i veze (JPETV) on the 9th of March at JPETV. Training the staff for the use of equipment by experts form VSB- Technical University of Ostrava (VSB-TUO) on the 23rd of May at VISER.

4 Progress report 2.5 The activty 2.5 has been finished. The Report on deliverable 2.5 Set up of DBBT laboratory equipment finished and sent to WP2 leader. The list of equipment obtained through DBBT project and description of its current use in the practical instruction in Electronics and Telecommunications lab, and Audio and video labs has been presented in the report. Examples of laboratory set-ups have been included.

5 Progress report 2.6 Report on deliverable 2.6 Set up of DBBT laboratory equipment finished and sent to WP2 leader. Teaching materials have been developed for the needs of vocational (professional) master studies within the ERASMUS + project Digital Broadcasting & Broadband Tecnologies at VISER. Teaching materials have been published and are available at each course website. Table with the description of the teaching materials as well as website links and screenshots from VISER website have been included in the report.

6 WP2: Value Adding Activities
Connecting several laboratories with high speed connection to each other and HDTV studio is in progress. This value adding activity will be finished by mid-july.

7 Progress report WP4 All activities WP4.1 WP4.2 and WP4.3 have been duly finshed and sent to the WP4 leader and presented at previous project meetings. For activity 4.4. Book of curriculum in Serbian language has been compiled and printed and presented at the DBBT project meeting in Banjaluka. Since the last meeting The book of curriculum in English language has been compiled according to the instructions form the coordinator of DBBT project and sent to WP4 leader.

8 Progress report WP5.2 Activity WP5.2 Enrollment of students to vocational master studies has been finished in October and November The report with evidence on this activity has been sent to WP5 leader. Activity WP5.3 Monitoring the first generation of students on new study programmes has been finished and report on the success of students has been sent to WP5 leader. Since the last meeting The book of curriculum in English language has been compiled according to the instructions form the coordinator of DBBT project and sent to WP4 leader.

9 Progress report WP5.3 All courses and exams have been finished.
Within activity WP5.3 Implementation of academic and vocational master study programmes: All courses and exams have been finished. Five students from VISER attended training and study visit at UL Faculty of electrical engineering, Ljubljana (28th of May until 1st of June) The student training for WB students was organized at VISER (21st of May until 25th of May) The professors from VSB-TUO performed teaching sessions to VISER students and WB students that participated in the student training at VISER. The report on these activities has been sent to WP5 leader.

10 Student training at VISER 21st/25th of May 2108.

11 Progress report WP5.4 Acitvity 5.5 Monitoring the first generation of students on new study programmes has been finished. The report on the success of students has been sent to WP5 leader.

12 Progress report WP5.5 Acitvity 5.5 Analysis of the students' feedback has been finshed. The report has been sent to WP5 leader.

13 Progress report WP5.6 For Acitvity 5.6 Students' practice with business partners, statistics has been made and report has been sent to WP5 leader. Total number of students in the study program MULTIMEDIA ENGINEERING 32 The number of students who passed the student intership 1 15 The number of students who did not pass the student intership 1 17 Types of work places where students are engaged Job type Number of students Executive Director / Manager / Head / Coordinator / Manager 7 Stage manager / Director 1 Practical teaching assistant/lab technician 5 AV Technician Engineer List of firms where students are hired Company name Number of students Visoka škola elektrotehnike i računarstva strukovnih studija u Beogradu 5 Mup Republike Srbije 1 JMU RTS RTS 2 Radio difuzno preduzeće Studio B d.o.o. MOD International doo JP Kablovska distribucija JP SKC Obrenovac Dlight Design Doo Prosound Conference Systems d.o.o.

14 Progress report WP5.7 Acitvity 5.7 Lectures by experts from business has been finshed. The report has been sent to WP5 leader. 1. Lecture by dipl. inž., Jovan Zlatanović, JP Emisiona tehnika i veze (JPETV), 9th of March, 2018 2. Lecture by dipl. Inž., Zoran Gaćinović, JP Emisiona tehnika i veze (JPETV), 9th of March, 2018 3. Lecture by dipl. Inž., Zoran Romić, JP Emisiona tehnika i veze (JPETV), 9th of March, 2018 4. Lecture by dipl. Inž., Zoran Gaćinović, JP Emisiona tehnika i veze (JPETV), 12th of May, 2018 5. Lecture by., dipl. Inž. Zoran Gaćinović , JP Emisiona tehnika i veze (JPETV), 22nd of May, 2018

15 Progress report WP6 VISER participate in all Quality Board  tasks for approval of templates and evaluation of the project outcomes based on the quality plan. The template for student survay in WP5 approved

16 Progress report WP7 7.1 Promotion on internal meetings in partner institutions VISER students and empoloyees are informed about DBBT project activites at meetings, by news on VISER website and social networks 7.2 Promotion on Website & social networks. Detailed report has been sent to WP7 coordinator

17 Progress report WP7 7.3 Production of promotional material. VISER has prepared report on all produced promotional material.

18 Progress report WP8 VISER is leader of WP8
VISER has collected and compiled report on 8.1 Accreditation of new academic and vocational master study programmes in the field of DBBT VISER has collected and compiled report on 8.2 Sustainability of Cooperation with Industry after the Project Ends VISER has collected and compiled report on 8.4. Signing the long-term cooperation agreements between HEIs and all relevant stakeholders, as well as sustainability of this cooperation.

19 Thank you for attention!
This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.


Download ppt "VISER progress report on realization of the WP2, WP4, WP5, WP6, WP7, WP8 Dr Slavica Marinković, The School of Electrical and Computer Engineering of."

Similar presentations


Ads by Google