Presentation is loading. Please wait.

Presentation is loading. Please wait.

ANNUAL PROGRAMME IMPLEMENTATION PLAN (APIP) ( ) MEGHALAYA

Similar presentations


Presentation on theme: "ANNUAL PROGRAMME IMPLEMENTATION PLAN (APIP) ( ) MEGHALAYA"— Presentation transcript:

1 ANNUAL PROGRAMME IMPLEMENTATION PLAN (APIP) (2012-2013) MEGHALAYA

2 Situation and Gap Analysis
Socio-economic and demographic profile of the State i) Population (ICDS) as per Household Survey Register) Rural Urban Tribal Total SC ST OBC General Others -- 180320 20674 4201 150661 9255 ii) Child Population(ICDS) Category Population as (ICDS Household Survey Register) Children 6 months – 3 years 440621 Children 3 years – 6 years

3 Total No. of District/Blocks
iii) Districts/Blocks (Rural/Urban/Tribal) Total No. of District/Blocks Rural Urban Tribal 7/41 39 2 iv) Female Literacy Rate (ICDS) as per Household Survey Register) Rural Urban Tribal 54.03% v) Rural Connectivity All Weather road 191 Seasonal Road (Difficult and unreached) 551+ vi) No. of villages/habitations unreached or difficult to reach villages Vii) Population covered under ICDS – 5,76,553 0-6 year , PM/ NM , A.Gs – 57760

4 Nutrition and Health Status of Women and Children (ICDS)
Status of Children 6 months to 6 years Normal -- 82.21% Moderate 16.91% Severely 1.18% Status of operationalization of AWCs/Mini- AWCs Total no. of AWCs sanctioned Total no. of AWCs operatio-nalised as on October, 2012 Total no. of Mini AWCs sanctioned as on October, 2012 Total no. of Mini AWCs operationalised Remarks 3922 3917 1234 One AWC under Court Case, 4 AWC which was sanctioned during as Anganwadi on Demand is under process for operational.

5 Infrastructure status of all operational AWC Buildings
Operational AWCs Own building Rented building Pucca building Kuccha building Others Total 3880 2309 36 766 176 593 Coverage of beneficiaries for supplementary nutrition and pre-school education, separately for three years Year SNP Pre-School 3-6 years 6 months – 6 years Pm/NM Adolescent Girls 341138 60010 13942 149451 350288 60038 99354 149512 440621 78172 57760 163534

6 Major gaps/constraints in programme implementation
Inadequate infrastructure at the District and Block level Non interest of the parents to enroll the children for pre-school education. Geographical terrain of the State create difficulties to achieve full coverage supervision by Lady Supervisor centres in a month. Communication problem and shortage of Departmental vehicle. Govt. of India’s norms for house rent.

7 Vision for the Development of Children & Women
Vision Statement The State through ICDS Programme has catered children in the age group 0 – 6 years leaving another 1,27,461 population uncovered. The extension of the scheme to cover the uncovered targeted Child population would tremendously bring into a healthy State with future healthy citizen.

8 Annual Action Plan – Programme Components
A. Human Resource Functionaries Total Sanctioned Post In-position Salary/Honorarium per month Estimated Budgetary requirement for the FY (In Rs.) 1 State level functionaries 13 402777 2 District level functionaries 57 casual employees 3 Block level functionaries 470 449 54 (casual employees 4 AWC level functionaries 9078 9068 5 Grand Total 30,32,8536 (say Rs lakhs) 39,563,5811 (say Rs lakhs)

9 Estimated budgetary requirement (Rs.)
B. Procurement of Materials and Equipment Items Estimated budgetary requirement (Rs.) 1 State level Cell 2 District Cell 3 Block/Project level 4 AWC level 5 Total (say Rs lakhs)

10 C Delivery of Services at AWCs
I : Supplementary Nutrition (SN) Type of food 6 months to 3 years (Items in detail) 3 years to 6 years (Items in detail) P & L Women (Items in detail) Take Home Ration (THR) Fortified SujiFortified Dalia, Fortified Atta, Fortified Cheera, , Milkose Powder Bengal gram, Dried Peas, Soya Bean, Green peas, Ground nut (unskinned) Fortified Suji, atta, dalia, cherra, choco malt, Iodised Salt, and sugar Morning Snacks (Hot cooked meal) Fortified Dalia, Fortified ,Atta Fortified Suji, Fortified Cheera, Milkose Powder II Expenditure on Supplementary Nutrition during , – Budgetary allocation and actual expenditure incurred. Year Budget Allocation Expenditure CSS State Share Rs lakhs Rs lakhs Rs lakhs Rs lakhs Rs lakhs Rs lakhs Rs lakhs Rs lakhs

11 Status of Supplementary Nutrition
Beneficiaries Population as per AWWs survey register No. of beneficiaries (as on ) Target for current FY Unit cost (In Rs.) Budgetary requirement for current FY ( ) (Rs. Lakh) Means of verification (MPRs/UCs) Children 6 months – 3 years 208969 231782 Rs.4 MPR Children 3 – 6 years 231652 260789 Pregnant Women 46499 49765 Rs.5 746.48 Lactating mothers (with children below 6 months) 31673 35570 533.55 Adolescent Girls 109347 57760 68311 Rs.2.30 & Rs.5 Total 628140 576553 646217

12 Status of Pre-school Education
No. of AWCs providing pre-school education (as on ) No. of children 3 – 6 yrs as per AWWs survey register (as on ) No. of 3-6 yrs children attended PSE for at least 16 days in the previous month (as on ) Target for the FY Estimated budget requirement for PSE kits Rs.1000 per kit per AWC per year & Rs. 250 per kit per mini AWCs ) Means of verification (MPRs/ASRs/ UCs) 5114 (AWCs) 231652 163534 3922 (AWCs) 1234 (Mini AWCs) children 39.22 lakhs 3.09 lakhs (Total lakhs) MPRs/ UCs 1234 (Mini AWCs) Contents of PSE kits and supply positions during and Stuff toys, Rubber Ball, Kitchen set, Flash Card (story telling), Picture Chart & Book on animals, fruits, vegetables, etc., Colour and Shape, Cricket bat and ball (plastic), Leather Ball (Football). Nil * Contents of PSE kits and supply positions during previous two years;

13 Immunization and Vitamin A
Current immunization coverage rates in the state 67.17% (based on ICDS MPR) No. of AWCs received and provided Vita A during last year 4893 Health Check up Supply and composition of Medicine Kits during and : 3978 : 3767 Target for Financial Year : Mechanism taken for Nutrition and Health Education Counseling of mothers through discussion and presentation of pamphlets, flash cards, Nutrition & Health Education (NHED) kits during home visits. 2. Awareness Programmes at the village level on importance of breast feeding, food habits and health care etc. 3. Observation and celebration of Village Health Day, Breast Feeding Week and Nutrition Week.

14 Budgetary Allocation and Actual Expenditure incurred Govt
Budgetary Allocation and Actual Expenditure incurred Govt. of India and State share Rs. in lakhs Year Budget Allocation Expenditure CSS State Share Main Scheme Rs SNP Rs Rs Rs Rs Rs Rs Rs Rs Rs Rs Rs SNP Rs Rs SNP Rs

15 Estimated budgetary requirement for FY 2012-13
Estimated budgetary requirements for the FY ; (Rupees in lakhs) Sl. No. Items Estimated budgetary requirement for FY A. MAIN SCHEME 1 Salaries of officers and staffs/Honorarium of AWWs and helpers. 2 Medical Treatment of officers and staffs 12.00 3 Travel expenses Officers etc 200.00 4 Hospitality Expenses at state and District level 7.75 5 Offices contingencies under NSS 5.00 6 State level awards to AWWs under Rs.5000 per AWW per district .35 7 Procurement of materials, Equipments. etc 467.35 8 PSE Kits 42.31 9 Medicine Kits 27.23 10 IEC 39.22 11 Monitoring and Evaluation 19.61 Total

16 Estimated budgetary requirement for FY 2012-13
Estimated budgetary requirements for the FY ; (Rupees in lakhs) Sl. No. Items Estimated budgetary requirement for FY B. KSY, SABLA, IGMSY & Training Programme 1 Implementation of KSY 25.00 2 Rajiv Gandhi Scheme for Empowerment of Adolescent girls(RGSEAG)-SABLA 92.00 3 Indira Gandhi Matritava Sehyog Yojana IGMSY Conditional Maternity Benefit Scheme 100.00 4 Training Programmes for functionaries of ICDS 59.34 Total 276.34 C. NUTRITION Supplementary Nutrition Programme for ICDS Scheme Grand Total A + B+ C

17 Training and capacity building
Training resources available in the State Training centres Sanction Operational Location Anganwadi Training Centre 2 Shillong & Tura Middle level training centre 1 Shillong Financial implication for Regular Training Type of Training Total no. of course Total no. of participant Total cost AWTC/ MLTC Job : AWWs 11 385 AWTC Ref: AWWs 6 240 225000 Orientation Helpers 5 250 253750 Ref: Helpers 7 350 273000 Job: Supervisors 2 50 280500 MLTC Ref: Supervisors 1 25 53750 Total (say Rs lakhs)

18 Total no. of participant
Financial implication for Innovative Training Type of Training Total no. of course Total no. of participant Total cost AWTC/ MLTC Nutrition counselling for CDPOs/ LS/ Nutritionist/ Health Functionaries 1 30 65500 MLTC Nutrition counselling for AWWs/ AWHs/ Mothers/ AGs 48800 AWTC Skills Training on Pre school education 2 60 209000 Training of the Community Leaders 97400 Total 420700 (Say Rs.4.21 lakhs) Estimated Expenditure Sl. No. Items Amount 1 Regular Training 24.66 2 Innovative Training 4.21 3 Establishment for AWTCs/ MLTC 23.09 4 Replenishment/ Up-gradation / Monitoring and Administrative Cost 7.38 Total 59.34

19 THANK YOU


Download ppt "ANNUAL PROGRAMME IMPLEMENTATION PLAN (APIP) ( ) MEGHALAYA"

Similar presentations


Ads by Google