AGENDA OF THE MEETING PHASE VII+ CORE STATUS PHASE VII+ PROJECT STATUS PHASE VII+ AMB-REW PROJECT STATUS PHASE VII+ CAPACITY REPORT PHASE VII+ DATA DOWNLOAD COMPARISON PHASE VII+ A/T STATUS PHASE OUT OF 2202/2206 BTS PHASE VII+ REDEP PLAN WORK ORDER FOR INSTALLATION OF ANTENNA & FEEDER CABLE INSTALLATION ETC. PHASE VII+ STATUS OF PROCUREMENT OF BB/PP FROM MM SECTION PENDING NODE-Bs IP MIGRATION STATUS PHASE VIII PLANNING 4G CITIES PLANNING HARYANA TELECOM CIRCLE

3 HARYANA TELECOM CIRCLE
PH VII+ CORE STATUS S. No. CORE ELEMENT PO ORDERED RECEIVED INSTALLED COMMISSIONED 1 REW MGW 2 AMB MGW 3 NARNAUL RNC 4 YMN NGR RNC 5 AMB RNC 6 REW RNC 7 YMN NGR BSC 8 REW BSC 9 AMB BSC HARYANA TELECOM CIRCLE

4 Additional 21 Nokia BTS plan
PH VII+ PROJECT STATUS PH VII+ PROJECT STATUS PHASE VII+ SITES PLANNED SITE HANDED OVER SITE INTEGRATED SITE ON AIR Additional 21 Nokia BTS plan TOTAL ON AIR 2G SWAP 325 122 21 143 3G SWAP 204 76 2G NEW 58 18 3G NEW 116 112 29 9 38 3G RRH 210 80 ZTE TOTAL 913 903 30 355 HARYANA TELECOM CIRCLE

5 AMB-REW PH VII+ PROJECT STATUS
S. No. SSA No. of BTS to be swapped No of BTS swapped No of new BTS integrated EXISTING (BEFORE PH VII+) TOTAL INTEGRATED BTS (TILL DATE) 2G 3G 1 REW 57 70 56 2 93 265 267 163 AMB 170 134 26 6 16 249 150 3 TOTAL 227 204 82 76 109 514 516 313 Additional REW swap- 21 Nokia BTS swap & 9 new 3G BTS integrated, Total REW 2G BTS swap= 56+21= 77, 3G BTS integrated = 93+9 = 102 HARYANA TELECOM CIRCLE

6 No of new BTS integrated EMF SUBMISSION PENDING
EMF SUBMISSION STATUS S. No. SSA No of new BTS integrated EMF SUBMITTED EMF SUBMISSION PENDING 2G 3G 1 REW 18 102 101 17 2 AMB 16 9 7 3 TOTAL 118 100 8 HARYANA TELECOM CIRCLE

7 PH VII+ CAPACITY REPORT (TILL DATE)
S. No. ITEM TOTAL PO TOTAL ON AIR PH VII+ CAPACITY PLANNED CAPACITY ACHIEVED % ACHIEVEMENT 1 2G SWAP 325 143 93331 47835 2 3G SWAP 204 76 30600 11400 3 2G NEW 58 18 79779 29316 4 3G NEW 326 118 171500 59000 5 2G REDEP 40 42000 6 3G REDEP 150 52500 7 TOTAL 1103 355 469710 147551 31.41 * CAPACITY ACHIEVED:- REW SSA- 1,30,269 & AMB SSA- 17, 282 HARYANA TELECOM CIRCLE

8 PHASE VII+ 3G DATA DOWNLOAD COMPARISON
SSA Before Swap April 2016 (24 hrs) Post Swap June (24 hrs) Rewari 486 GB 1157 GB SSA Before Swap April 2016 (24 hrs) Post Swap June (24 hrs) NARAINGARH SDCA 35 GB 54 GB HARYANA TELECOM CIRCLE

9 3G DATA DOWNLOAD SPEED SNAPSHOT- MTE_BAWAL
HARYANA TELECOM CIRCLE

10 PH VII+ A/T STATUS 2G Ph VII+ LOT-1 SUMMARY REW 52 1 53 AMB 22
SSA BTS Offered for AT Coverage AT memos issued ALL clear pending points(BTS Only) ALL clear pending points(BTS + Coverage) Swap New TOTAL REW 52 1 53 AMB 22 Total 2G 74 75 3G Ph VII+ LOT-1 SUMMARY 66 93 159 5 15 20 Total 3G 71 108 179 HARYANA TELECOM CIRCLE

11 PHASE OUT OF 22O2 & 22O6- PH I,II,III BTS
S. No. SSA NO. OF WORKING 2202 & 2206 BTS TO BE PHASE OUT PHASED OUT TILL DATE 1 AMB 48 15 2 HSR 124 3 KRNL 4 REW 5 TOTAL 176 19 HARYANA TELECOM CIRCLE

12 PH VII+ - REDEP PLAN S. No. SSA No. of BTS TO BE REDEP
CORE ELEMENT REDEP 2G 3G 1 HSR 24 99 2 KRNL 30 64 REW ERIC BSC REDEP (KRNL), REW ERIC RNC REDEP (KRUK) 3 JIND 41 JIND BTS/NODE-B TO BE REPARENTED TO AMB ERIC BSC/RNC 4 TOTAL 55 204 * FTHBD & SIRSA NODE-B RE-PARENTING FROM HISAR RNC TO SIRSA RNC – PENDING AT SSA HISAR END HARYANA TELECOM CIRCLE

13 HARYANA TELECOM CIRCLE
REDEP TENDER- BRIEF 1. BSNL CO has instructed circles to carry out the redeployment of BTS/ Node-B in house under phase VII+ project. 2. For in house redeployment of BTS/Node-B ,the separate tenders have been floated by this office for transport of equipment & rigger work . 3. The equipment (BTS & associated infra ) will be transported to the site through Transport Tender. 4. The rigger work i.e. the hoisting & de hoisting of antenna mount/ antenna, laying of feeder cable, minilink etc will be carried out through Rigger tender 5. After rigger work, the BTSs/ Node-Bs equipment will be installed by BSNL staff itself. HARYANA TELECOM CIRCLE

14 HARYANA TELECOM CIRCLE
RIGGER TENDER DETAILS The following vendors finalized for rigger work through rigger tender: M/s Neelkanth Engineers Ambala ii) M/s Jaskaran Infrastructure Pvt Ltd Faridabad HARYANA TELECOM CIRCLE

15 First lot of 30 BTS (25 - 2G, 5 - 3G) (swap-redep plan)
S. No. SSA No. of BTS 2G (NOKIA) 2G (ERIC) INFRA SITE EXISTING SITE WH TOTAL 2G 3G 1 AMB 2 HSR* 5 6 3 KRNL* 10 7 4 JIND* REW# TOTAL 20 16 6** 25 *23 no. of BTS (21-2G, 2-3G) have been packed, transported & reached resp. SSA warehouse (Karnal- 12, Jind- 5, Hisar-6). SSA to keep infra ready & issue work order for inst. of antenna, mounts & feeder cable. # 2 no. of existing Ph I,II,II BTS swapped by Nokia BTS by REW SSA. ** Rest 4 no. of BTS have been issued for replacement of faulty existing Nokia BTS -(Karnal- 2 (Ajrana, Rohera), Hisar- 1 (khedar) , Jind- 1 (kabarcha). HARYANA TELECOM CIRCLE

16 HARYANA TELECOM CIRCLE
WORK ORDER DETAILS HARYANA TELECOM CIRCLE

17 HARYANA TELECOM CIRCLE
1. The work orders for rigger work shall be issued by concerned SSA for all or some items mentioned above as per site requirement. 2. The work order shall be issued site wise. 3. AGM (CM-NP), O/o Sr. GM(CM) Haryana, Ambala will provide the following information to SSAs for issue of work order: site wise SOR vendor name to whom the work order is to be issued 4. The completion certificate in the format prescribed in the tender shall be issued by SSAs after execution of all the works by vendor against the work order. 5. The copy of tender document, APO, authorization etc. are uploaded on intranethr vide GM(CM)/HR/GSM Phase VII+/Deployment Tender/ /66 dated HARYANA TELECOM CIRCLE

18 PH VII+ BB/PP STATUS- PROCURED FROM MM SECTION
SSA REQUIREMENT OF POWER PLANTS (3+1) -50 A (Three Phase) (3+1) -100 A (Three Phase) TOTAL RECEIVED AMB 6 2 8 HSR 21 NIL KRNL 1 9 REW 24 28 34 62 SSA Battery Banks RECEIVED TOTAL (400AH) (600AH) AMB 2 7 9 1 4 HSR 40 20 KRNL 10 REW 22 26 48 21 65 42 107 32 34 HARYANA TELECOM CIRCLE

19 NODE-B IP MIGRATION PENDING
S. No. SSA Total Node-Bs FE MEDIA PENDING 1 Faridabad 58 11 2 Gurgaon 61 3 Karnal 149 4 TOTAL 268 33 HARYANA TELECOM CIRCLE

20 PHASE VIII PLANNING- REPLACEMENT OF PH IV, IV++ NOKIA BTS
SSA 444 BTS 888 BTS plnd 444 BTS 888 BTS GRAND TOTAL INDOOR OUTDOOR AMBALA 58 22 45 13 19 3 80 HISAR 93 2 82 11 1 95 JIND 85 27 36 143 KARNAL 175 18 151 24 17 193 REWARI 63 59 4 122 21 206 474 243 395 79 195 48 717 HARYANA TELECOM CIRCLE

21 REQUIREMENT OF BSC S. No. BSC Name Location of existing Nokia BSCs
TRX Required after Replacement with 444/888 Requirement of New type of BSC's 1 AMBALA 1224 Type II YMN NGR 2 HISAR 1164 3 JIND 2412 SAFFIDON NARWANA Type I 4 KARNAL PANIPAT 2532 KURUKSHETRA 5 REWARI 4188 Total 11520 HARYANA TELECOM CIRCLE

22 REQUIREMENT OF MGWs, MSS, OMC-R
SSA Erlang 63 Er per BTS Erlang 126 per BTS Total Traffic Erlang New Required MGW MSS OMC-R AMBALA 3654 2772 6426 Already ordered 16K in Phase VII+ Project (8K expansion reqd) HISAR 5859 252 6111 16K JIND 5355 7308 12663 24K KARNAL 11025 2268 13293 REWARI 3969 18018 21987 Already ordered 16K in Phase VII+ Project  (8K expansion reqd) Grand Total 29862 30618 60480 4 MILLION TYPE-1 HARYANA TELECOM CIRCLE

23 REQUIREMENT OF FEEDER, ANTENNA, DRIVE TEST KIT
Expansion Sites No of Antenna 900/1800 No of Antenna 900/1800/2100 Feeder (300 mtr average) 243 633 96 72900 m The requirement of drive Test kits – 27 (3 Kits per SSA) HARYANA TELECOM CIRCLE

24 4G CITIES PLANNING UNDER PH VIII
1. KARNAL 2. PANIPAT 3. HISAR 4. KURUKSHETRA 5. AMBALA HARYANA TELECOM CIRCLE