1 Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR

2 Comprehensive Explanation
Implement precision area navigation (P-RNAV) procedures to capitalize on the performance benefits offered by approved aircraft This is an interim objective aimed towards establishing a global RNP RNAV environment, and individual States, airports and aircraft operators will need to evaluate the business need for P-RNAV procedures according to local circumstances; Type - PCP Scope – ECAC; Applicability – All ECAC States, except Slovak Republic; Initial Operation Capability (IOC) – 01/2001; Full Operational Capability (FOC) – 31/12/2023. ESSIP Plan 2015 / Objective NAV03

3 What is new or has changed since LSSIP 2014
The FOC of the Objective has been postponed from 31/12/2012 to 31/12/2023 to be aligned with the PCP schedule; Also the deadline for implementation for ASP01, 02, 03, 05, 11 and USE 01, 02 have been postponed from 31/12/2012 to 31/12/2023 ESSIP Plan 2015 / Objective NAV03

4 Link to European ATM Master Plan
[AOM-0601]-Terminal Airspace Organization Adapted through Use of Best Practice; [AOM-0602]-Enhanced terminal operations with APV using Barometric VNAV; ESSIP Plan 2015 / Objective NAV03

5 Most important SLoA(s)
ASP01- Develop and implement RNAV arrival and departure procedures for PRNAV approved aircraft; ASP02 - Provide appropriate terrestrial navigation infrastructure to support RNAV operations; ASP03 - Train air traffic controllers in RNAV procedures; ASP11 - Develop a Local P-RNAV Safety Case; USE01 - Install appropriate RNAV equipment; USE02 - Train aircrews in RNAV TMA procedures; ESSIP Plan 2015 / Objective NAV03

6 Most important Finalisation Criteria
ASP01 - RNAV arrival and departures implemented in accordance with EUROCONTROL guidance material and JAA TGL 10 and declared in national AIP, and in use; ASP02 - Infrastructure assessed and modified if required to meet the requirements for DME/DME procedures; ASP03 - The necessary training given to controllers responsible for the operation of RNAV terminal procedures; ASP11 - Local P-RNAV Safety Case finalized and approved by the National Supervisory Authority; USE01 - All civil transport aircraft operating in ECAC states are capable of P-RNAV operations; USE02 - Training manuals have been updated to include RNAV TMA procedures. The aircrew is trained accordingly; ESSIP Plan 2015 / Objective NAV03

7 ESSIP Plan 2015 / Objective NAV03
Supporting Material EUROCONTROL - Airspace Concept Handbook for the Implementation of Performance Based Navigation (PBN) - Edition 2.0 Url : web.pdf ICAO - Doc Performance-based Navigation (PBN) Manual - Edition 4 / 03/2013 Url : ICAO - Doc 8168-Volume II - Aircraft Operations - Volume II - Construction of Visual and Instrument Flight Procedures - Air Navigation Services - Aircraft Operations (PANS-OPS) Software - Edition 5 / 04/2012 Url : ICAO - Doc Regional supplementary Procedures - Edition 5 / 07/2011 Url : EUROCONTROL - GUID Guidelines for P-RNAV Infrastructure Assessment - Edition V1.2 / 04/2008 Url : ESSIP Plan 2015 / Objective NAV03

8 ESSIP Plan 2015 / Objective NAV03
ESSIP Report 2014 ESSIP Plan 2015 / Objective NAV03

9 ESSIP Plan 2015 / Objective NAV03
Links and contacts Objective Coordinator: Adriatik KOKONA, DSR Objective Expert: Pavlicevic Franca, ESSIP Plan 2015 / Objective NAV03