Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGz Los Angeles Closing Report

Similar presentations


Presentation on theme: "TGz Los Angeles Closing Report"— Presentation transcript:

1 TGz Los Angeles Closing Report
January 2005 doc.: IEEE yy/xxxxr0 January 2010 TGz Los Angeles Closing Report Date: 22 January 2010 Authors: Menzo Wentink (Qualcomm) Dorothy Stanley, Agere Systems

2 TGz Accomplishments in LA
January 2005 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE yy/xxxxr0 January 2010 TGz Accomplishments in LA TGz resolved all of the comments received on the initial sponsor ballot The approved comment resolutions are in 11-09/1185r4 TGz approved a 15-day recirculation sponsor ballot to start when the editor has prepared TGz draft 7.0 Slide 2 Menzo Wentink (Qualcomm) Page 2 Dorothy Stanley, Agere Systems John Doe, Some Company


Download ppt "TGz Los Angeles Closing Report"

Similar presentations


Ads by Google