Presentation is loading. Please wait.

Presentation is loading. Please wait.

Adien Limited 2015 Adien Limited 2005.

Similar presentations


Presentation on theme: "Adien Limited 2015 Adien Limited 2005."— Presentation transcript:

1 Adien Limited 2015 Adien Limited 2005

2 “an ill wind…” Adien Limited 2015

3 Markets & Opportunities
Major civil infrastructure projects Power, Water , Oil and Gas Highways and Rail Scottish Rail BAM Nuttall Caledonian Water 2JV’s Volker EA framework Defence Estates DIO Infrastructure Contractors Eight 2O (Thames Water) Balfour Beatty Utilities Carillion /Amey Barhale /GVA (Yorkshire Water) Volker Stevin/Fitzpatrick Magnox Nuclear industry Projects sourced via databases, networking and referrals Adien Limited 2015

4 Current Strategies Continuous improvement of service delivery Augmented reality, Clients results are available on site via ‘phone/handset or Ipad (with 3D Autocad) Reduction in delivery times to Client (digital delivery only) Increased range of digital output types Development of new service lines : Photogrammetric surveys delivered as a 3D model with an image that has dimensional accuracy 3D Laser scanning Measured building surveys NDT in live pipelines Adien Limited 2015


Download ppt "Adien Limited 2015 Adien Limited 2005."

Similar presentations


Ads by Google