Presentation is loading. Please wait.

Presentation is loading. Please wait.

Allen Cousins – Senior GIS Analyst Frank Hardisty Ph.D. - Adviser

Similar presentations


Presentation on theme: "Allen Cousins – Senior GIS Analyst Frank Hardisty Ph.D. - Adviser"— Presentation transcript:

1 Allen Cousins – Senior GIS Analyst Frank Hardisty Ph.D. - Adviser
Integrating Automated Metering Infrastructure (AMI) with GIS to Predict Electrical Outages Allen Cousins – Senior GIS Analyst Frank Hardisty Ph.D. - Adviser

2 Overview Background Outage Prediction Implementation Future

3 Background Customers Electric Gas Both Established 1889
355,000 Electric Customers 314,000 Gas Customers 26,400 Sq. Miles 8 Hydro Facilities Customers Electric Gas Both

4 Avista’s GIS ESRI ArcGIS/SDE 9.2 Oracle 10g 400+ Users
Avista Facilities Management (AFM) Edit - Electric and Gas OMS (OMT) - Electric Design - Electric and Gas Gas Compliance Engineering Analysis - SynerGEE Servers (OMT, Batch Posting, Compliance, Work, Statistics) Mobile – TC Technology Mapbook

5 OMT - Overview Logically connected network. Customer driven.
Customer outages are georeferenced. Outages are assessed and prioritized Geographically related Electrically related Prioritized by number and type of customers effected.

6 OMT – Problems Relies on customers to report outages.
May or may not report outage. Customer observations may be unreliable. Reactive versus proactive. Labor and time intensive analysis. Delay in analysis causes restoration delays. Verification of outage restoration.

7 AMI – Overview Automated Metering Infrastructure (AMI).
Two-way Automatic Communication System (TWACS). Remote meter reading. Allows for the “ping” of the meter.

8 Outage Prediction

9 Outage Prediction

10 Outage Prediction

11 Implementation - Technology
Visual Studio .NET and C# Component-based Scalable Logical Architecture (CSLA .NET) by Rockford Lhotka - ArcObjects used to create custom trace routines to trace the GIS logical network . TWACS hijacking

12 Implementation Existing Manual Outage Analysis Process

13 Implementation Three Phases to Automated Outage Analysis

14 The Future… Analysis vs. Scanning Storm Curve
Verification of restoration

15 Thank you for your attendance. Questions?


Download ppt "Allen Cousins – Senior GIS Analyst Frank Hardisty Ph.D. - Adviser"

Similar presentations


Ads by Google