1 Integration, Test, and Calibration
Brian Grist Integration and Test Engineer

2 I&T Milestones TKR & CAL Modules A & B Ready for Integration into Calibration Unit 08/15/03 TKR & CAL Modules 1 & 2 Ready for Integration into Calibration Unit 11/03/03 Calibration Unit Beam Test Complete 04/17/04 Flight Grid Ready for Integration 01/02/04 Flight TKR & CAL Modules 3 & 4 Ready for Integration 01/02/04 Flight TKR & CAL Modules 15 & 16 Ready for Integration 03/24/04 Flight TKR & CAL Modules 1 & 2 Ready for Integration 04/26/04 Flight ACD Ready for Integration 04/26/04 LAT Instrument Ready for Environmental Testing 07/09/04 LAT Instrument Pre- ship Review 01/07/05 LAT Instrument Ready to Ship 03/01/05 GLAST Launch /06

3 I&T Schedule

4 Draft I&T Cost Estimate (FY99$)

5 Integration & Test Cost Estimates
Current Approved Project Management Cost Profile (Escalated $) P3 Cost Loading Report PRIMAVERA PROJECT PLANNER Integration and Test RUN NO. 80 COST LOADING REPORT START DATE 03APR00 FIN DATE 29MAR06 11:03 DATA DATE 01SEP01 PAGE NO. 1 TOTAL USAGE FOR YEAR FY DESCRIPTION TOTAL 2000 2001 2002 2003 2004 2005 2006 INTEGRATION 61125 679320 672960 758185 698028 277769 RELIABILITY 103964 16701 45495 41768 I & T PREPAR 388485 209497 73317 73614 32058 CALIBRATION 557444 146081 272508 138855 FLIGHT LAT I 351417 976635 267715 24921 MISSION INTE 189395 21114 31191 79658 57433 REPORT TOTAL 77826 360123

6 Mapping of WBS items to Manager Responsibility
I&T&C Manager E. Bloom WBS 4.1.9 I&T Engineer B. Grist WBS Reliability & QA D. Marsh WBS Instrument Operations Coordinator S. Williams Ground Support Equipment TBD Online Manager R. Claus Integration, Facilities, Configuration, and Test O.Millican (Acting) Particle Test Manager G.Godfrey Environmental Test Manager M. Lovellette Calibration, Analysis and Science Verification E. do Couto e Silva I&T Preparation EM Model I&T Calibration Unit I&T Flight LAT I&T Mission I&T Support

7 On-Project vs. Off-Project Manpower
I&T Organization must rely heavily on Off-Project manpower Off-Project Manpower Elliott Bloom Eduardo do Couto e Silva Gary Godfrey Paul Kuntz Hiro Tajima Post Doc (currently 1.5) Stanford Graduate Students (currently 4) other contributed collaboration labor for tasks like Calibration under Eduardo and staffing of shifts during tests under Ossie Current On-Project Manpower Brian Grist Ric Claus Ossie Millican John Broeder NRL Team (Environmental Testing) TBD Programmer (for Eduardo) TBD GSE (Mechanical Engineer) other resources that are being identified

8 DRAFT - Fiscal Year vs. FTE

9 DRAFT - On and Off Budget FTE

10 Choices that Impact Schedule and Budget
NRL as Environmental Test Site Choice Schedule Environmental tests at NRL all in one trip will reduce schedule impact due to shipping and verification testing. Budget Environmental tests at NRL will fit within the budget allocated for Acoustic/Vib and Thermal Vacuum ~$600k (escalated) for tests at NRL Fits within (escalated) currently allocated budget One beam test at SLAC only (drop CERN test) Saves about one month in the I&T timeline Reduction in the shipping and cost due to two functional checkouts

11 I&T schedule and budget work
I&T managers are addressing their schedule and budget requirements and these will need to be folded into the official schedule and budget I&T plan needs to be agreed upon before loading into P3 Updated Schedule and resources needs to be loaded into P3 Rectify differences in the Resource Loaded P3 schedule and the budget restrictions