1 Create Project Definition/Order and Work Breakdown Structure Element (Direct Charge)
Show Slide 1: Create Project Definition/Order and Work Breakdown Structure Element (Direct Charge) Generalize New Information (4Ø minutes) Instructor Note: During the crawl phase the Instructor will go through each step of the transaction code (t-code) while reading the information provided in the (info) boxes. The following t-codes will be covered during the Direct Charge Process. CJ2ØN = Create a Project and WBS element FMBB = Funds Management CJ2ØN- Fund and Release ZRFSC3 - Cumulative Status by FC (FUND CENTER) Report 1

2 Terminal Learning Objective
Action: Create Project Definition/Order and Work Breakdown Structure Element (Direct Charge) Conditions: Mid-grade FM Leaders in a classroom environment working individually and as a member of a small group, using doctrinal and administrative publications, practical exercises, case studies, personal experience, handouts, and discussion. Standard: Application Includes: - Reimbursable Process - Create Project Definition via CJ20N - Fund a Funded Program via FMBB - WBS Element via CJ20N - Cumulative Status by FC Report via ZFSC3 Show Slide 2: Terminal Learning Objective Read TLO SAFETY REQUIREMENTS: In a training environment, leaders must perform a risk assessment in accordance with DA PAM , Risk Management. Leaders will complete a DD Form 2977 RISK MANAGEMENT WORKSHEET during the planning and completion of each task and sub-task by assessing mission, enemy, terrain and weather, troops and support available-time available and civil considerations, (METT-TC). Local policies and procedures must be followed during times of increased heat category in order to avoid heat related injury. Consider the work/rest cycles and water replacement guidelines IAW TRADOC Regulation Risk Assessment Level: Low. Hazard Identification: Electrical Shock, Fire, Slippery Floors, Physical Injure/Strain, Tripping Tight Spaces in Classroom, and Influenza. Hazard controls: Primary Instructor (PI) will ensure: All electrical cords are properly stored under desks, liquid containers have lids on them and all spills are immediately cleaned and mopped and allowed to completely dry before allowing students/personnel to walk on them. All chairs are ergonomically designed, adjust to individual preference and that all students are awake and paying attention in class. All cables/cords are properly plugged in, sheathed, and secured along tables, walls, and ceilings. No damaged or frayed cords/cables will be used. PI will brief proper hand washing techniques, the use of hand sanitizer, and evacuation procedures. All trash will be removed daily. ENVIRONMENTAL STATEMENT: Environmental protection is not just the law but the right thing to do. It is a continual process and starts with deliberate planning. Always be alert to ways to protect our environment during training and missions. In doing so, you will contribute to the sustainment of our training resources while protecting people and the environment from harmful effects. Refer to FM Environmental Considerations and GTA ENVIRONMENTAL-RELATED RISK ASSESSMENT. EVALUATION. At the end of the S8 Module a culminating event, resulting in a briefing to the Commander, will be assessed. INSTRUCTIONAL LEAD IN - Before we can understand how to control our funds, we must briefly discuss the course to roles crosswalk process. 2

3 Agenda Build a project via t-code CJ20N Fund a project via t-code FMBB
Approve funding and release via t-code CJ20N View funded program via t-code ZFSC3 Show Slide 3: Agenda Build a project via t-code CJ20N Fund a project via t-code FMBB View funded program via t-code ZFSC3 Approve funding and release via t-code CJ20N 3

4 CJ20N FMBB ZFSC3 Legend Distribute Funds to Funded Program
GFEBS Operation Plan Project and Create WBS RM/AST CJ20N Distribute Funds to Funded Program Budget Office Fund/Release Project Cumulative Status by FP Report ZFSC3 FMBB Show Slide 4: Overview Discuss overview of process from building a project to viewing a funded program 4

5 Direct Charge Order Process
Direct Charge – Performer and Requestor are on GFEBS Performer creates the WBS Element and Funded Program FP and WBS Element numbers are the same Performer sends with Funded Program number to Requestor WBS Elements should not be marked “Billable” Requestor enters LOA on WBS Element in CJ20N Requestor uses FMBB to fund the Funded Program Requestor sends (AKO) to Performer confirming FP has been funded Performer Releases WBS Element marked Funded Show Slide 5: Direct Charge Order Process Instructor Note: For Direct Charge, decide between the requestor an performer who will create the WBS element. 5

6 Considerations for Use
Recommended way to control distribution of funding! Battalion level funding (example) 1st BN – S HHC – S Alpha Company – S Bravo Company – S Charlie Company – S Specific training events Specific expenditures S8 can set-up WBS and fund for a variety of reasons Provides a “hard stop” when unit/event expends all available funding

7 LSA - 1 Create a Project CJ20N Show Slide 6: Create a project
Generalize New Information (35 minutes) Instructor Note: The functions in this component support you in creating and executing budgets. The purpose of Funds Management is to budget all revenues and expenditures for individual areas of responsibility, to control future funds transactions in accordance with the distributed budget, and to stop the budget from being exceeded. 6

8 This is YOU! Show Slide 7: Create a funded program 7

9 Create a Project and a WBS Element
(CJ20N) For first time users, the “Welcome to Builder” pane along with parameter choice will Always show. Green Check both to proceed. CJ2ØN This is the “Create” Project Definition Icon, single-click and select from the menu. 1 Show Slide 8: Create a project Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. 8

10 Create a Project and a WBS Element
(CJ20N) Under “Identification and view selection”, input a short description and amount of the service being provided Menu-bar 2 Monthly Septic Cleaning Service 25ØØØ 4 Free-Text Field Tabs / Tab-fields This is found in Item 9b of DD Form 448 3 REFRESH: Screen Fields Show Slide 9: Create a project  Instructor Note: This is a quick overview of the different field-types in the training data base. This information was covered during the Intro to GFEBs lesson. Click the down arrow to navigate through this slide and the following slides. 1. The Menu Bar list action tabs. 2. The Free-text field – when the field background is white it is open/available for text input. 3. Tabs/Tab-fields – are used for specific information. The pages that display after the tab is selected is for information relevant to the specific tab. 4. The drop-down arrows will display a list of designated choices for the tab field. Radio buttons – you can select one radio button when it is “required”. Continue on with the selection Drop-Down Radio buttons 9

11 Create a Project and a WBS Element
(CJ20N) This is your system generated Project Definition number Keep in mind: = Project Definition And = WBS element overview Click in “Person Respons.” box to reveal the dropdown, then click dropdown to reveal the choices available 5 Show Slide 10: Create a project  Instructor Note: SAP / ERP will generate a project definition number beginning with (S ). If a screen appears that ask for a beginning and ending range, have the student(s) type for the start date and as the end date. 3 5 Click in “Applicant no.” box to reveal the dropdown, then click dropdown to reveal the choices available 6 10

12 Create a Project and a WBS Element
(CJ20N) 9 Show Slide 11: Create a project Instructor Note: Step 7: For the start date, use current date. For the finish date, use a future date within the current fiscal year. Select the appropriate organizational entity (plant = installation / FOB) 3 5 Projected start date (use today) and end date of project ( use end of FY) 8 FSHA 7 1Ø/Ø6/2Ø14 11

13 Create a Project and a WBS Element Cont.
(CJ20N) Notice: The definition populated. Single-Click the “Overview Icon” to begin the WBS Level 1 build 11 Show Slide 12: Create a project Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. Double- Click on your Project number (this action moves the definition into the “Project Structure: Description) 3 5 FSHA 1Ø/Ø6/2Ø14 12

14 Create a Project and a WBS Element
(CJ20N) L1 Typ, click in the box, click the drop-down to reveal the “categorical- type” of service(s) to be performed (Sustainment) L1 WBS element: Annotate your system generated “Project Definition Number” Description of the services to be rendered. (Same as Project Definition Description) 12 13 14 15 S.ØØØØØ13 Monthly Septic Cleaning Service 25ØØØ S1 Level 1: To be completed by the “Requester’s Budget Office” 18 “Operative Indicators” Planning Element (PE) allows Cost Planning for those WBS elements that are checked Show Slide 13: Create a project Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. L1-Req.cost ce… This is the Performer’s cost center to be used for the service 3 15 5 L1-CA… (resp.) Always: ARMY 16 17 ARMY 76VVØØ65 FSHA 1Ø/Ø6/2Ø14 13

15 Create a Project and a WBS Element
(CJ20N) On the menu bar, click “Save”. Double-click on the WBS (Level 1) project to begin assigning the funding information. In the “Tabs” section, select the “Customer Enhancement” tab to begin inputting funding information. Ensure that you are on the operating under the “Funding Data” tab. Remember, this is to be completed by the Performer. 25 19 21 Click in the “Funded Program Type” box to view the selection(s) available. This is a Direct Charge Reimbursable (DRCH) 22 Show Slide 14: Create a project Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations 23 DRCH 1Ø/Ø6/2Ø14 24 Click in the “Create Funded Program” box. Click in the “Funded Program Start Date” box to reveal the calendar or input the date manually (use current date) 14

16 Create a Project and a WBS Element Cont.
(CJ20N) Upon Dbl-clicking your project (bottom half of screen), the WBS populates at the upper-half of the screen. Single-click the WBS to populate the template. Show Slide 15: Create a project Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations Under “Last Projects Processed”, Dbl-click on your project name 15

17 Create a Project and a WBS Element Cont. (CJ20N)
33 Notice: The L1 WBS is highlighted, and the fields to the right populated to finish inserting the funding information. Click the “Cust. Enhancement” tab Select the “Save” button” to allow the changes to be saved Ensure that you are working under the “Funding Data” tab. NOTE: This section to be completed by the Requester’s Budget Office. Select the “Basic Data” tab 31 26 This section to be filled out by the “Requester’s Budget Office” Enter the “Functional Area” 32 27 28 131Ø96QLOG Enter the “Funds Center” Show Slide 16: Create a project Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations 29 A76VV Enter the “Main Account” 2Ø2Ø Enter the “Fund” (15 represents current FY) 2Ø2Ø1ØD15 By checking the Operative Indicator “Acct asst elem.” this assigns the account assignment to the WBS 16

18 CJ20N- Direct Charge Order
Simulation The instructor demonstrates this activity while you follow along Hands on Exercise The instructor will lead you step by step through the activity using the training materials provided Show Slide 17: Create a project Apply (1 hour) Practical Exercise #1, CJ20N Create a Project and WBS element Instructor Note: The CJ2ØN exercise scenario will be done by each student. The students are required to perform this exercise on their own. Review the PE (1Ø minutes) 17

19 Fund a Funded Program FMBB
LSA - 2 Show Slide 18: Fund a Funded Program LSA 2– Fund a Funded Program Generalize New Information (35 minutes) Instructor Note: The functions in this component support you in creating and executing budgets. The purpose of Funds Management is to budget all revenues and expenditures for individual areas of responsibility, to control future funds transactions in accordance with the distributed budget, and to stop the budget from being exceeded. 18

20 Show Slide 19: Battle Drill 32 – Create a Funded Program

21 Fund a Funded Program (FMBB)
Select the dropdown and enter the FM layout variant “ARMY” 1 ARMY Select the dropdown and enter the FM layout variant “ARMY” Show Slide 20: Fund a Funded Program  Instructor Note: Use the "page down" key to navigate through the steps. You will need to do this for all the transaction code demonstrations. As you go through the slides read the appropriate notes, If there are not any notes inform the students to select the highlighted (numbered) information. 2 ARMY2 20

22 Fund a Funded Program (FMBB)
Select the Version type to be used. Click the drop-down to view available choices. (Always choose zero) Select the appropriate Process which is to take place. Select the Document type to be used. Click the drop-down to view available choices. Budget Category should default into Payment. 3 4 5 Ø ALLT (Allotment) Show Slide 21: Fund a Funded Program  Instructor Note: Use the "page down" key to navigate through the steps. You will need to do this for all the transaction code demonstrations. As you go through the slides read the appropriate notes, If there are not any notes inform the students to select the highlighted (numbered) information. 21

23 Fund a Funded Program (FMBB)
Command policy will dictate the actual “Document Date” Posting Date should be the current date. Ø 6 Budget Type (46**) Asterisks Represent current quarter eg. 11/1st qtr, 12/2nd, 13/3rd, etc. Use current quarter. ALLT (Allotment) SENDER Information (L1) represented by (-) symbol Enter the Fund for the current year (Performer / Requester Agreement ) 7 4611 8 2Ø2Ø1ØD15 9 “Commitment Item” will default in with All Objects Show Slide 22: Fund a Funded Program  Instructor Note: Use the "page down" key to navigate through the steps. You will need to do this for all the transaction code demonstrations. Make sure you use the Reference (excel spreadsheet) to depict the correct budget type. As you go through the slides, read the appropriate notes. If there are no notes, inform the students to select the highlighted (numbered) information. 22

24 Fund a Funded Program (FMBB)
Ø ALLT (Allotment) 4611 2Ø2Ø1ØD15 Budget Type (46**) Asterisks Represent current quarter eg. 11/1st qtr, 12/2nd, 13/3rd, etc. Use current quarter. Enter the Fund for the current year (Performer / Requester Agreement ) Show Slide 23: Fund a Funded Program  Instructor Note: Use the "page down" key to navigate through the steps. You will need to do this for all the transaction code demonstrations. As you go through the slides read the appropriate notes, If there are not any notes inform the students to select the highlighted (numbered) information. RECEIVER Information (L2) represented by (+) symbol 4611 11 2Ø2Ø1ØD15 12 “Commitment Item” will default in with All Objects 23

25 Fund a Funded Program (FMBB)
19 18 Click “Check Document” to ensure correct entries were made Ø ALLT (Allotment) 4611 2Ø2Ø1ØD15 Double-Check your information here prior to the Post. (Notice, the original 2 lines below have been copied into the system as shown on lines 3 and 4) Show Slide 24: Fund a Funded Program  Instructor Note: Use the "page down" key to navigate through the steps. You will need to do this for all the transaction code demonstrations. As you go through the slides read the appropriate notes, If there are not any notes inform the students to select the highlighted (numbered) information. 4611 2Ø2Ø1ØD15 Enter the Functional Area from the LOA. Enter the Funded Program (Your WBS creation number) Total amount from the Performer / Requestor Agreement 19 Enter the Appropriate “Funds Center” from the LOA. Description on what is being funded (to include $ amount) 15 16 18 17 A76VV 131 ARMY 25ØØØ Septic Service A76VV 131 S.ØØØØØ13 25ØØØ Septic Service - 25ØØØ 24

26 FMBB – Fund a Funded Program
Simulation The instructor demonstrates this activity while you follow along Hands on Exercise The instructor will lead you step by step through the activity using the training materials provided Show Slide 25: Fund a Funded Program Simulation -- The instructor demonstrates this activity while you follow along Hands on Exercise -- The instructor will lead you step by step through the activity using the training materials provided 25

27 WBS Element-Mark Funded and Release (CJ20N)
LSA - 3 Show Slide 26: WBS Element-Mark Funded and Release LSA -4 – WBS Element-Mark Funded and Release (CJ20N) Generalize New Information (20 minutes) Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. 26

28 Show Slide 27: Create a funded program

29 WBS Element-Mark Funded and Release
(CJ20N) CJ2ØN 2 Once again, open (Dbl-Clk) your project definition to populate the project structure above (WBS-L1) Single-Click on your WBS level 1 project 1 Show Slide 28: WBS Element-Mark Funded and Release Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. 28

30 WBS Element-Mark Funded and Release
(CJ20N) “Select: Menu> 3 Hover Over: Edit Hover Over: STATUS Show Slide 29: WBS Element-Mark Funded and Release Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. Hover Over: User STATUS Hover Over: Set & Pass On 29

31 WBS Element-Mark Funded and Release
(CJ20N) User Status Message: Designated POC / User Status Fund Successfully Set Notice: System Status lets you know that Funding was Created (CRTD) From the menu, select “Funding Approved” and Green-Check it. Show Slide 30: WBS Element-Mark Funded and Release Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. 30

32 (CJ20N) WBS Element-Mark Funded and Release Click “Save” Click “Menu”
Notice: System Status lets you know that Funding was Released (REL). Show Slide 31: WBS Element-Mark Funded and Release Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. System generated message informing processor of Status funding Status being set 31

33 CJ20N WBS Element – Mark Funded and Release
Simulation The instructor demonstrates this activity while you follow along Hands on Exercise The instructor will lead you step by step through the activity using the training materials provided Show Slide 32: WBS Element-Mark Funded and Release Apply (2Ø minutes) Practical Exercise #4, WBS Element-Mark Funded and Release CJ2ØN Instructor Note: In this activity, the students will input the CJ2ØN. The students should log into the GFEBS Portal and Training Environment. Use the data sheet included in the course packet to complete the activity. If questions arise that do not pertain to the scenario, address them after the hands-on training. Explain to participants the resources they have available to complete the activity. The instructor can determine if the training should be done individually or in groups of two. 32

34 Cumulative Status by FP Report ZFSC3
LSA - 4 Show Slide 33: Overview LSA-3 – Cumulative Status by FC Report (ZFSC3) Generalize New Information (15 minutes) Instructor Note: Cumulative Status reports are used to pull reports down by Fund Center. This t-code allows you to pull reports that reflect the input the transactions have on the budget. 33

35 Show Slide 34: View a funded program

36 (ZFSC3) Cumulative Status by FP Report
Financial Management Area is ARMY (May Default in as ØØØ1) 1 ARMY 2 2Ø15 “From and to” Fiscal Year will default to current year (YYYY) 2Ø15 3 From period and To period represent the first and last calendar month(s) (numbers) 1 12 Dbl-Click the appropriate Budget type according to the current quarter. 4 In the Fund Or value(s) line, enter the Fund Show Slide 35: Cumulative Status by FP Report Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. 2Ø2Ø1ØD15 5 Enter the Fund Center A76VV 35

37 (ZFSC3) Cumulative Status by FP Report
Basic information based on search criterion. Show Slide 36: Cumulative Status by FP Report Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. 36

38 Cumulative Status by FC Report Cont.
(ZFSC3) Our original Project definition number shows an available allotment amount of $25,000.00 Show Slide 37: Cumulative Status by FP Report Instructor Note: Use the “"page down"” key to navigate through the steps. You will need to do this for all the transaction code demonstrations. 37

39 ZFSC3 – Cumulative Status by FP Report
Simulation The instructor demonstrates this activity while you follow along Hands on Exercise The instructor will lead you step by step through the activity using the training materials provided Show Slide 38: Cumulative Status by FP Report 38

40 Questions? Show Slide 39: Questions Restate TLO Summarize Lesson 39