2 Shared Services - A Working Definition
Shared services is the provision of a service by one part of an organization or group where that service had previously been found in more than one part of the organization or group. Thus the funding and resourcing of the service is shared and the providing department effectively becomes an internal service provider. Wikipedia, the free encyclopedia Look at Auditor general report Another definition What is currently done BY many….In the future is done by ONE… ….FOR many………… I like that one Off presentation at a MAV conference

3 Engineering Services Experience
Could you find more attractive models? What is this slide for?

4 Synopsis - NGSC Located in Wimmera Region in the Central West of Victoria Covers an area of 5,918 square kilometres Population of 11,719 (Density of 1 per 2.00 kilometres) 3,048 Kilometres of local roads 234 kilometres from Melbourne GPO to Stawell P.O.

5 Identification of a need/Opportunity for Innovation - Hindmarsh Shire Council
Area 7,527 square kilometres Population of over 6,200 374 kilometres from Melbourne GPO to Nhill Unable to recruit a suitable Engineer - high costs of contractors

6 Assess Capacity - NGSC Infrastructure Dept.
Personnel - 3 design and project Engineers and a Graduate Engineer Maintain sufficient workload to fully occupy a full time Graduate summer grad program -> full time Existing relationship with Hindmarsh Shire Management & Officers Sufficient fleet and equipment to support extra requirements

7 Early stages of the process / relationship
Initially developed a process where individual jobs were quoted for on a cost recovery basis Quotes were significantly cheaper with reduced travel costs, no accommodation costs and completed within time frames Graduate Engineer -> full time utilisation?

8 Development of a Process
Agree to mutually acceptable service standards Agree on acceptable Cost recovery basis Determine Transport, Travel, Wages, reasonable on costs Agree on skill level/experience of officers supplied

9 Formalisation/Benefits of the MOU process
Single agreement (MOU) removes need for quotes MOU obviates procurement considerations Provides ongoing service provision and certainty for Hindmarsh Shire Enables strategic planning

10 Supplementary Infrastructure Agreements
Oval aerating - quote for gallops adopted for Councils Street Sweeping Road Grading West Wimmera - agreement Discussions with other Councils

11 NGSC Environmental Health Experience
Add image

12 Identification of a need/Opportunity for Innovation
Ararat Rural City Council Adjoining Council Existing strong relationship

13 Assess Capacity/ Define Need - NGSC Environmental Health Unit
NGSC conducted service reviews in one EHO surplus to requirements Unable attract a suitable full time EHO in 2014 Executive level in principle arrangement re a potential shared service agreement during informal discussions

14 Early stages of the process / relationship
Discussion at appropriate level - Mngr Planning, HR, Finance Induction at new workplace and commence duties on informal basis - cost recovery of wages only Working from Ararat - familiarity with staff and processes

15 Development of a Process
Agree to mutually acceptable service standards Agree on acceptable Cost recovery basis Determine Transport, Travel, Wages, reasonable on costs Agree on skill level/experience of officers supplied - EHO and EHT provided to conduct less complicated inspections

16 Formalisation of the process - MOU
Single agreement (MOU) removes uncertainties MOU obviates procurement considerations Provides ongoing service provision and certainty for ARCC Enables strategic planning

17 How can Shared Services apply to land use planning?
Limited capacity in Statutory/Strategic/Enforcement Cost of full time role/contractors Neighbouring Councils with similar issues Budget limitations

18 How can Shared Services apply to land use planning?
Online interactive information / applications Paperless/Remote processing Joint area initiatives (Triangle Project) Implement RGP Initiatives Cluster/Regional services

19 Shared Service Checklist
Identification of Need / Opportunity Assess Capacity / Define Need Early Relationship / Informal stage Developmental/Sounding out Process Formalisation of Process Service Delivery Review of Process

20 Shared Service Case Study
Utilise the following case study or your own organisation to provide a (Planning) service to a neighbouring Council. What methodology would you apply within the following circumstances?

21 Shared Service Case Study
Quarreltown is staffed by 1.5 fte Statutory, 0.5 fte Strategic Planning, 1.0 fte Admin support, Quareltown has ability to attract further Statutory/Strategic Planner(s) Stoicville is staffed by 1.0 fte Statutory Planner, 0.6 fte Admin support. No current Strategic capacity

22 Shared Service Case Study
Both Shires have neglected strategic works over a number of years Both Shires are under pressure to reduce staff and expenditure Both LGA’s use different software and operating systems

23 Shared Service Case Study
Travel time between Shires is approx. one hour Both LGA’s have low rate bases and strong reliance on external funding Neither LGA is adverse to embracing opportunities for innovation


Download ppt "Shared Services and Land Use Planning"

Similar presentations


Ads by Google