1 UTSA Capital Projects Update Facilities, Engineering & Projects
Financial Area Representatives Meeting November 30, 2016 Paul Goodman, Assistant Vice President

2 Science and Engineering Building

3 Science and Engineering Building

4 Science and Engineering Building

5 Science and Engineering Building

6 Science and Engineering Building

7 Science and Engineering Building

8 Science and Engineering Building

9 Science and Engineering Building

10 Science and Engineering Building

11 Science and Engineering Building
Cost Per Gross Square Foot Benchmarks Science and Engineering Building (with 7% Shell Space) $426 Science and Engineering Building (Estimated Total Finish-Out) $437 THECB Average for Laboratory, General $501 Low Quartile Median High Quartile Other U. T. System Projects $483 $527 $575 Other National Projects $536 $593 $781

12 Science and Engineering Building
$95,000,000 Total Project Cost $70,000,000 TRB $10,000,000 PUF $10,000,000 Designated Funds $ 5,000,000 RFS Total Building Cost GSF Building Cost/GSF Science and Engineering Building $63,154,000 148,250 $426

13 UC Retama Renovation Upgrade seating and increase capacity
Update finishes and lighting Upgrade technology Total Project Cost: $2 million

14 UC Retama Renovation

15 UC Retama Renovation

16 Recreation Center Pool
Features: 8-lane 200,000-gallon lap pool, depths from 3’-6” to 9’-6” 60,000-gallon leisure pool, depth 3’-6” Crawl space with mud slab adjacent to and beneath both pools Relocated sand volleyball court New pool equipment and piping New pool chemical system Site drainage improvements New sidewalks, concrete flatwork, landscape, irrigation, & fire lanes Lead Consultant/Architect:  Marmon Mok Architecture, San Antonio, TX Aquatics Designer:  Aquatics Design Group, Carlsbad, CA Contractor:  Byrne Construction Services, San Antonio, TX Total Project Cost:  $6.5 million

17 Recreation Center Pool

18 Recreation Center Pool

19 Recreation Center Pool