Download presentation
Presentation is loading. Please wait.
Published byEmory Hudson Modified over 6 years ago
1
802.16 Project Planning Committee (PPC): M2M Study Report & PAR Development Plan
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE ppc-10/0001 Date Submitted: Source: Jose Puthenkulam Intel Corporation (Project Planning Committee Chair) Venue: NA Base Contribution: IEEE /0027r Project Planning Committee Session #66 Closing Report Purpose: Project Planning Committee Machine to Machine (M2M) Communication Study Report & PAR Development Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.
2
PPC M2M Study Report & PAR Development Plan
Goal: Finalize M2M Study Report and PAR by May Call for Initial Contributions issued for Study Report and PAR on March 24, 2010 for submission by April 5th AOE based on Initial Draft ToC ( /0024). Conference Calls Planned for Development: CC#1: April 6: 8:30-10:30PM PST CC#2: April 13: 1:30-3:30PM PST CC#3: April 20: 7:00-9:00AM PST CC#3: April 27: 8:30-10:30PM PST Agenda Schedule for Conference Call discussions: CC#1: Overall Plan, ToC Updates & Usage Models CC#2: Architecture & Requirements & Usage Model Completion CC#3: Requirements & Standard Impact & Architecture Completion CC#4: Requirements & Standard Impact Completion, Study Report Final Draft & PAR Form Updated Draft Final Study Report and PAR expected to be completed by May Session
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.