Presentation is loading. Please wait.

Presentation is loading. Please wait.

Company Overview July, 2016.

Similar presentations


Presentation on theme: "Company Overview July, 2016."— Presentation transcript:

1 Company Overview July, 2016

2 Goldwind at a Glance Number 1
Since establishing the first wind farm in 1986, our people have spent 30 years as pioneers in the wind energy business. Goldwind has more than 31GW of wind turbine generation capacity installed globally. More than 22,000 wind turbine installed, including 18,000 units using the permanent magnet direct drive (PMDD) technology. We have successfully listed on 2 stock exchanges, in Shenzhen and Hong Kong. Number 1 in the world by newly installed capacity in 2015 Goldwind was established in 1998 as a wind turbine manufacture. Before 1998, we already have nearly 10 years wind farm operation and maintenance experience in Xinjiang. Goldwind is one of the first wind farm owner in China. We began our journey to become a world-leading wind turbine manufacturer and wind power solution provider nearly 30 years. As the end of 2015, the cumulated installed capacity already exceeded 31 GW. We have more than 22,000 wind turbine installed all over the world, including 18,000 wind turbine with PMDD technology.

3 Key Moments in Goldwind's History
Goldwind isn’t in the renewable-energy business because it’s the flavor of the moment. We’ve been here from the beginning—and today we share our capability and expertise with the world. Goldwind founders set up the first wind farm. Identifies PMDD as the core technology for the company Acquires Vensys, a European pioneer in PMDD technology. Invests in the Uilk Wind Farm in Minnesota. - Its first in US. Goldwind’s biggest overseas project (215MW) goes into commercial operation in Panama. Ranked 1st in the world for newly installed capacity, with 7.8GW during the year. Goldwind first establishes itself as a wind turbine manufacturer Goldwind makes its initial public offering on the Shenzhen Stock Exchange. Later, in 2010, the company lists on the Hong Kong Stock Exchange. Goldwind wins its first 15-year maintenance and operations contract in Thailand. In Ecuador, Goldwind signs its first engineering, procurement and construction contract. This is the timeline of Goldwind history. Here I would like to highlight some key moments. In 2003, Goldwind identified PMDD as our core and only technology. We have rich experience of operating gearbox wind turbine during the first decade, and tried PMDD technology starting from early of In order to strengthen R&D capability, Goldwind acquired a Germany company named Vensys in 2008, who is a pioneer in PMDD technology. Goldwind starts doing international business since In 2009 our first wind farm in US was invested, built and operated by ourselves. 然后把 的大事件说一下。We make growth step by step, and tried different business model to keep Goldwind competitive in the international market.

4 Largest Global Wind Manufacturer
Goldwind was number one in the world in 2015, with 7.9 GW of newly installed capacity for a global market share of 13%, according to BNEF. Global Market Share 2014 & 2015 Segment Revenues (RMB million) 2015 Wind Farm Development Wind Turbine Sales Wind Power Services Other 2014 This is the market share comparison of 2014 and Goldwind always keep its outstanding position with tier 1 OEM. Our global market share increasing from 9% in 2014 to 13% in Obviously our advanced PMDD technology and comprehensive services are more and more accepted by customers and markets. The right chart shows our revenues segmentation. Apart from the main business wind turbine manufacturing and sales, the wind farm development and services also contribute a lot for each year’s revenue. So Goldwind’s integrated business could provide a full range of services cover every stage of wind farm life circle.

5 Global R&D Leveraging international synergies and Partnerships. Goldwind employs +800 R&D engineers in 6 R&D centers. Germany Neunkirchen China Urumqi China Beijing United States Chicago Europe Denmark China Yancheng R&D Center Currently Goldwind operates a network of six research centres, employing more than 800 engineers in total. Starting from our original base in Urumqi, Xinjiang, we have branched out to Beijing, Dafeng in Jiangsu province, Chicago, Denmark and Germany. In addition, Goldwind maintains good working relationships with leading scientific institutions, universities, and consultancies worldwide.

6 Our Integrated Business Spans the Globe
Our 8 foreign subsidiaries and 5 international sales offices provide full global coverage to support our customers on every continent. Wherever you are, there’s a Goldwind office or facility in your region.

7 Total Goldwind Delivery
Global Footprint Country Capacity(MW) USA 190 Goldwind Canada 8.7 Vensys Total North America 198.7 Panama 270 Cuba 4.5 Bolivia 3 Ecuador 16.5 Chile 33 Total Latin America 327 Ethiopia 51 Egypt Total Africa 54 France 18.75 Romania 50 1.5 UK 7.5 Germany 178.7 Poland 28.8 Cyprus 31.5 Total Europe 317 Australia 185 Thailand 97.5 Pakistan 79.5 Total Asia Pacific (excl. China) 362 Total Goldwind Delivery 998.75 As the end of 2015 , contract capacity reached MW; Nearly 1000MW delivered across six continents.

8 Singapore’s Annual Electricity Consumption
Goldwind turbines produce energy exceeding Singapore’s Annual Electricity Consumption Corporate Social Responsibility

9 Thank you ! 8


Download ppt "Company Overview July, 2016."

Similar presentations


Ads by Google