Presentation is loading. Please wait.

Presentation is loading. Please wait.

The ELENA Safety Documentation «time to prepare the safety clearance»

Similar presentations


Presentation on theme: "The ELENA Safety Documentation «time to prepare the safety clearance»"— Presentation transcript:

1 The ELENA Safety Documentation «time to prepare the safety clearance»
2015/11/12 The ELENA Safety Documentation «time to prepare the safety clearance» C. ALANZEAU – 14/07/2016 C.Alanzeau - EN/HDO H. BREUKER / C. ALANZEAU

2 ELENA Safety Documentation - Where do we stand?
Check List (HSE) Design Safety Clearance (HSE) DSO Tests (BE) Installation HW Commissionning BEAM Commissioning Operation Today ?? ( ?) ( ?) Contributions to Descriptive and Demonstrative parts received for >80% of the systems owners. -Ion source -Ion switch -Power Converters -Magnets -Injection septum -Injection kicker -kicker generator -RF Cavity -Infrastructures: EL,CV Needed next before DSO test -Access system (+ EIS) -RP inputs -Beam instrumentation -B-Train -Electron cooler -Control systems -Emergency systems Except: Safety inspection reports Tests protocols Needed before starting the HW commissionning of  -Vacuum system – ready. -Fast deflectors – ready. 14/07/2016 C.Alanzeau - EN/HDO

3 ELENA Safety Documentation Safety checks before hardware tests
The HSE Unit checks the compliance of the Safety documentation Engineering documentation Safety documentation (2 parts) HSE inspections reports if applicable + «No non-conformity» HW tests protocol (presented during VICs)  HSE Clearance 14/07/2016 C.Alanzeau - EN/HDO

4 ELENA Safety Documentation Safety checks before hardware tests
+ Documents attached to the ELENA project EDMS Node Example with TE/ABT fast deflectors Engineering Specification EDMS «Released», Description of the system §4.4.4 of EDMS , Demonstration of safety compliance EDMS Compliance to CERN safety rules (Eng Spec: §6 - Safety), Electrical safety inspection report (TE/ABT + HSE/SEE): IP3x, connections, distribution and grounding, Commissioning protocol to be presented to the VIC. Some assets have been defined as EIS-b for TL safety. 14/07/2016 C.Alanzeau - EN/HDO

5 ELENA Safety Documentation Safety checks before hardware tests
+ Documents attached to the ELENA project EDMS Node Example with TE/MSC electromagnets - Dipoles Engineering Specification EDMS «Released», Description of the system §4.3.2 of EDMS , Demonstration of safety compliance EDMS Compliance to CERN safety rules (Eng Spec: §4 - Safety), Electrical safety inspection report (TE/MSC + HSE/SEE): IP2x, DC connections and grounding, Commissioning protocol to be presented to the VIC (TE/MSC, TE/EPC, TE/MPE, HSE/SEE, EN/EA) 14/07/2016 C.Alanzeau - EN/HDO

6 ELENA Safety Documentation Now it is your responsibility to check…
Your system’ Safety Documentation: Engineering documentation «Released» : EDMS __________ EDMS _________ EDMS _________ + EDMS _________ Missing parts? Please contact asap the Safety File Editor. Reference? Check your § Check your § Reference? EDMS ref. can be a document or a node 14/07/2016 C.Alanzeau - EN/HDO


Download ppt "The ELENA Safety Documentation «time to prepare the safety clearance»"

Similar presentations


Ads by Google