1 INTEGRATED NATIONAL ELECTRFICATION PROGRAM (INEP)
DEPARTMENT OF ENERGY PRESENTATION ON THE INTEGRATED NATIONAL ELECTRFICATION PROGRAM (INEP) 18 JUNE 2013

2 Annual Report Presentation
Introduction Key focus areas Allocation 13/14 financial year Universal access challenges Additional progress Way forward

3 Introduction

4 INEP’s response to the 12 Government Outcomes and PICC
INEP contributes to the following DoE and Government’s Outcomes Based Planning Approach: Outcome 4 – Decent employment through inclusive economic growth; Outcome 6 – An efficient, competitive and responsive economic infrastructure network Outcome 7 – Vibrant, equitable and sustainable rural communities with food security for all Outcome 8 – Sustainable human settlement and improved quality of household life and Outcome 9 – A responsive, accountable, effective and efficient local government system. INEP is also reporting into SIP 6 of the PICC process.

5 Key Focus Areas for 2012/13

6 Electrification progress Electrified Houses: Municipalities & Eskom
Over 5.6 million households were connected to the grid between and 2012/13. In period 2002 to 2012/ households were supplied with non- grid technology (Solar panels – Renewable Energy) Eastern Cape - 12,282 Kwazulu Natal - 43,511 Limpopo ,381 Province Electrified Houses: Municipalities & Eskom Eastern Cape Free State Gauteng KwaZulu Natal Limpopo Mpumalanga Northern Cape North West Western Cape Total Non-grid electrification programmes will in future not only be implemented in concessionary areas, but in a limited basis in other areas in country.

7 MUNIC PROGRAMME 2012/13 – PERFORMANCE APRIL 2013
PROVINCE ALLOCATION R’000 TRANSFERRED R ‘000 EXPENDITURE R’000 PLANNED CONNECTIONS CONNECTIONS ACHIEVED YTD Actual Connections INCLUDING ROLLOVERS EC R 279,400 270,420 116,591 16494 2996 7601 FS R 79,300 69,300 24,495 3827 932 3258 GP R 168,000 188,000 91,328 7859 3874 6216 KZN R 234,000 240,000 38,270 16491 549 4684 LIM R 125,300 132,500 64,330 13078 4843 10255 MP R 74,943 75,823 31,527 5931 2248 5390 NW R 49,300 43,300 11,677 3852 546 4292 NC R 59,900 60,800 32,019 3590 887 2892 WC R 61,300 71,300 39,646 2725 2401 6032 TOTAL R 1,151,443 1,151,443 449,883 73 847 19 276 50 620

8 ESKOM PROGRAMME 2012/13– PERFORMANCE APRIL 2013
PROVINCE ALLOCATION TRANSFERED EXPENDITURE PLANNED CONNECTIONS CONNECTIONS ACHIEVED YTD Actual Connections INCLUDING ROLLOVERS EC R488,340,000 R 398,287,779 22,227 17151 21480 FS R39,118,000 R 22,590,440 2,815 3326 3559 GP R104,882,000 R 86,620,958 9,568 9688 12843 KZN R510,292,000 R 527,353,057 26,111 17963 20653 LIM R233,028,000 R 175,898,147 22,198 23553 26812 MP R108,566,000 R 85,843,897 9,385 10568 12082 NW R246,988,000 R 123,921,150 12,779 10516 12062 NC R36,108,000 R 14,871,096 1,338 1511 1643 WC R110,046,000 R 68,879,182 7,803 8618 9907 TOTAL R1,879,368,000 R 1,504,265,708 114,224 102894 121041

9 Non grid – Solar home systems 2012/13 Financial year
TOTAL ALLOCATION R’000 Planned Connections Total Expenditure to date Connections Achieved to Date R 13 310 R 9 343

10 Connections INEP (including roll-overs) Connections Own funding
INEP PERFORMANCE (12/13) Entity MTEF Allocations Connections INEP (including roll-overs) Connections Own funding Total Connections Eskom (bn) R 1, 21 831 Municipalities (bn) R 1, 50 620 Non-grid (mil) R 9 343 Total R 3,117,211 Electrification data of 12/13 still to be added – more connections will be added, need to verify some connections. Target of was exceeded Improved efficiencies as a result of be more involved in the operational activities of implementers. Good co-operation from Eskom and Municipalities

11 Allocations 13/14 Financial year

12 Allocations 2013/14 2013/14 R’000 MUNICIPALITIES 1,314,772 PLANNED CONNECTIONS 103,864 ESKOM (NATIONAL) 2,141,027 PLANNED CONNECTIONS 157,839 NON - GRID 91,150 15 000 TOTAL PLANNED CONNECTIONS * TOTAL ALLOCATIONS R 3,546,951 Connections might change as projects are moving from design into implementation phase.

13 Connection and Bulk Allocations for 2013/14
PROVINCE Total Allocation Eskom allocations (R’ 000) Munic allocation Adam allocation (R’000) Eastern Cape 95 000 Free State 17 782 95 100 85 000 Gauteng 97 000 KwaZulu Natal Limpopo Mpumalanga Northern Cape 94 270 17 170 57 100 20 000 North West 49 150 Western Cape 95 110 Total 3,775,799 2,141,027 1,314,772 320,000

14 Bulk allocation 2013/14 EC R 266,513,230 R 28,000,000 FS -
PROVINCE ESKOM MUNIC R’000 EC R 266,513,230 R 28,000,000 FS - R 27,000,000 GP R 291,042 R 41,000,000 KZN R 26,000,000 LIM R 7,068,000 R 7,000,000 MP R 6,583,500 R 17,620,000 NW R 25,000,000 NC R 13,500,000 WC R 36,920,062 R 23,000,000 TOTAL R 317,375,834 R 208,120,000

15 Adam allocation 2013/14 PROVINCE MUNICIPALITIES ALLOCATIONS EC
KING SEBATA DALINDYEBO 60,000,000 NELSON MANDELA 35,000,000 FS NGWATHE 20,000,000 MOQHAKA NALA MANGAUNG 25,000,000 KZN MSUNDUZI 100,000,000 NC SOL PLATJIE NW TLOKWE TOTAL 320,000,000

16 Universal access challenge

17 Universal access challenge
Households without electricity: ~3.3 million (Informal 1.2 mil and formal 2.1 mil) 75 % in Eskom supply area and 25% in municipalities supply area.

18 Universal access challenge (cont.)
INEP established in 2001/02 - address backlogs of households in line with Energy White Paper (1998) recommendations. Newly built households to be electrified by the restructured Electricity Distribution Industry (EDI) - due to serious inefficiencies in the EDI over the last 10 years, INEP had to address not only backlogs, but also newly built houses and informal households. Not only connections had to be funded, but also ‘back bone’ network infrastructure. In addition to the above challenges, escalating electrification costs and limited funding, as well as the high growth rate of houses (formal and informal), resulted in a serious thread to reach universal access in the country. Despite its successes to date, the electrification programme will fall short in meeting its target of electrifying 92% of formal households by 2014, as defined as backlogs in 2001/02. It is expected that 84% of all formal households and 78% of all households in the country will be electrified by 2014.

19 Households electrified in South Africa
2011 Census: ±12,24 mil households out of ± 14,45 mil households are utilizing electricity as a lighting source; ± 85% of households have access to electricity for lighting purposes. Different types of households included into the total household figure (built on the same stand as the formal household): Houses/flats/rooms in backyard  000 Informal dwellings in backyards (shacks in backyard)  000 Room/flatlet on a property or larger dwelling/servants quarters/granny flat  000 Total , Majority of these households (about 90% plus) are not metered, estimated to be ± 1.1 mil . Network designs were not done to accommodate these additional households, hence will have to be upgraded. These household does also not qualify for inclining bock tariff and FBE. About 2.2 mil households according to Census 2011 stats are without electricity, if the 1,1 mil households that are not metered (have not received electricity formally) been added, total figure of about 3,3 mil. In line with the INEP stats for households that are not formally electrify (metered), hence ±77% households have a metered supply.

20 Universal access challenge (cont.)
If universal access to electricity by 2014 is not practical, what is the most effective and realistic timeframe to reach universal access, given the various challenges in the electricity industry, raising cost of electrification, etc.? Hence a new approach to electrification is required - New Electrification Roadmap (Implementation plan) for South Africa was developed. In March 2012, DoE held an Electrification Indaba where all the relevant sector departments and stakeholders were invited to participate and agreed on the need for a new Electrification Roadmap. The Indaba resulted in a consultative working group process which the following relevent stakeholders were involved in defining the new Roadmap: Eskom, DHS, DRDLR, DPE, SALGA, AMEU, CoGTA, MISA, NERSA, SANEDI, DBSA, National Planning Commision, National Treasury, MinMEC, NPC, PICC Secretariat, Commercial financial institutions and current non-grid concessionnaires.

21 Universal Access is function of Electrification Technology options and funding
2027 2017 2018 2019 2017 +R2 billion 2031 2020 2022 2023 2021 Additional funding per year +R1 billion 2037 2023 Base case 2028 2030 2026 (base case) Option 2 Most cost efficient technology Option Option 3 (base case) Option 2, but non-grid within 3km Option 5 Option 3, grid connection for informal households Option 1 All grid Option 4 Option 3, but grid replaces mini-grids 100 70 90 87 78 Technology mix % of current un-electrified formal households to be connected to the grid

22 Universal access vs Connection rate
Number of connections outstanding Connection rates required2 to meet… Million connections At least 99% grid access by 2028 Current ~220,000 grid connections per year3 3.4 households1 1.2 households Universal access by 2025 ~380,000 connections per year3 2.2 2012 1 Informal settlements are defined as residential areas that do not comply with local authority requirements for conventional/formal townships 2 Beginning in the middle of 2013; includes informal settlements 3 Ignores growth of new un-electrified households .

23 Using these rules, it is expected to deploy around 300,000 solar home systems and reach universal access for formal households in 2025 South Africa Provincial non-grid potential Total connections 2013 – 2025 Million households Thousand households 37 26 10% Non-grid 0.3 16 84 11 28 Grid 90% 3.1 73 19 The highest potential for Non-grid is in KZN and Eastern Cape Time to electrify formal households 20251 1 Assumes existing INEP annual funding and DoHS contribution of R2,000 per household for new RDP houses (40,000 houses per annum); assumes total of 50,000 new formal households per year from DoHS formalization process

24 New Household Electrification Strategy
The key aspects of the new Household Electrification Strategy : Re-setting universal access date to 2025 and defining universal access as 97% - full electrification is not possible due to growth and delays in the process of formalizing informal settlements. Electrify about 3 million formal households via grid (90% of backlogs) and about 300,000 households with high-quality non-grid solar home systems to address current backlogs. Increased efficiency in planning and the delivery process will require Master Plan to ensure more connections and to be in line with PICC SIP progrmames. Current financial year will improve efficiency, especially wrt municipality’s delivery (last year increased connections by about ), as well as to prepare the electricity industry for the increased connection rate. Additional funding will be required if universal access is to be reached by An additional R0.5 billion annually (nominal figure) top-up of existing allocations will be required from 2014/15 onwards. Eskom’s to lead the development of the Master Plan. Municipalities to improve delivery and management of projects.

25 Additional progress

26 Additional progress Eskom has progressed very well with addressing the so-called “island electrification” in KZN. households identified falling into this category in 2011/12 – been electrified (4773 outstanding) Master plan development – DoE in collaboration with Eskom. DBSA “front loading” process to fast tracked certain high backlog Municipalities as part of INEP long term planning.

27 Project Report DBSA Front Loading
Municipality Province DBSA Loan Comment/Status Mbizana EC R61 Million Approved, business case submitted to National Treasury Umzimvubu R45 Million Matatiele R30 Million Mnguma R23 Million Approved, awaiting Council Resolution Engcobo The application is being appraised, developing a business case for the Municipality. Intsika Yethu R38 Million Awaiting information from the municipality Ntabankulu R35 Million

28 Project Report DBSA Front Loading
Municipality Province DBSA Loan Comment/Status Ingquza Hill EC R35 Million Awaiting information from the municipality Ndwedwe KZN R26,6 Million Under Administration Abaqulusi R23 Million Business plan not yet received from the municipality Matubatuba R45,8 Million Under administration Msinga R53,2 Million The business plan is not aligned to the IDP. The municipality is in discussion with Eskom to sign the service level agreement. Umzimkhulu R17 Million Municipality to provide outstanding information Mvoti R90 Million Application received on the 22nd of May 2013

29 Project Report DBSA Front Loading
Municipality Province DBSA Loan Comment/Status Thulamela LP R90 Million Municipality will complete phase one of R90 million by July They are in a process of applying for phase two. Greater Giyani R16 Million Municipality to provide Audited Financial Statements Greater Tzaneen R50 Million Application is being processed Polokwane R95 Million