Download presentation
Presentation is loading. Please wait.
1
Mission Readiness Assessment System (MRAS)
Duane ‘Chip’ Morris ManTech Security Solutions Group Enterprise Integration Center (e-IC)
2
Overview Project Description Development Strategy Design
Required and Produced Content Schedule and Transition
3
MRAS-NG GOAL A software shell application that:
Resides on the DS2 server Provides users with situational awareness based on material and personnel readiness Allows subject matter experts to create and manage the knowledge applied by the system to generate the operational assessments across a variety of ship classes and joint weapon system platforms
4
MRAS-NG Concept Manual Input
5
MRAS-NG Development Strategy
Address Equipment/Systems Availability and operator training content areas first Situational Awareness Work up from report data to more timely availability data/info CASREP 2KILO 3M Database SORTS messages Legacy monitoring/expert systems Manual input
6
MRAS-NG Design Software Shell Accessible through DS2 Modular
Agent based User managed external configuration files User tool set Development Tools Application Tools Accessible through DS2
7
MRAS-NG Design Data Sources IT-21 LAN resident databases
Sensor readings DS2 databases Archive files Manual Input
8
MRAS-NG Focus Areas Addresses four (4) aspects of Readiness Assessment – each with required and produced content Missions Processes Entities Views
9
MRAS-NG Content Missions Processes Required Produced
Mission Definitions, Capabilities, Critical Equipment Produced Assessments and Situational Awareness Processes Business Rules Sequence of process steps execution KIM (Knowledge Instance Model) construction and maintenance Findings of Equipment/Systems monitored
10
MRAS-NG Content Entities Views Required Produced
Training Status, Equipment Status/Availability Data (CASREP, 2KILO, ICAS, TRAREP, etc.) Produced Operational Status/Availability, Assessments and Situational Awareness Views User Preferences Customized Presentation Custom Report generation
11
MRAS-NG Transition Oct 2003 – Mar 2005 Apr 2005 – Sep 2007
Redesign, develop, certify, and field test Incorporate field test findings Additional equipments Prep for fielding NAVSEA to submit MRAS in POM for FY06 Apr 2005 – Sep 2007 Refresh – sources, systems, capabilities Oct 2007 – Mar 2009 Refresh 2 of the MRAS
12
MRAS-NG Transition Milestones
Jan/Feb 2004 Design Review and Demonstration IPRs at 4-6 week intervals May/Jun 2004 Pre Test Review Jun-Aug 2004 Factory Acceptance Test (Fairmont, WV) DS2 Acceptance Test (NSWC Crane) Certification Testing (SPAWAR Chesapeake) Sep 2004 = Field Test with DS2 in Sea Warrior Sep-Dec 2004 = Refactoring and Expansion of Application sources Feb 2005 = Acceptance Testing March 2005 = Deployment Preparations
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.