Presentation is loading. Please wait.

Presentation is loading. Please wait.

Report of the Capacity Buildung Sub-Committee

Similar presentations


Presentation on theme: "Report of the Capacity Buildung Sub-Committee"— Presentation transcript:

1 Report of the Capacity Buildung Sub-Committee
IRCC 9 12-14 June 2017 (Paramaribo, Suriname) Report of the Capacity Buildung Sub-Committee Thomas Dehling CBSC Chair

2 Contents Main developments and achievements in IHO CB
Mayor challenges in IHO Capacity Building CB Management Contribution to Capacity Building CB Work Programme E-Learning Statistics and Performance Indicators Proposals

3 Main Developments and Achievements (1)
IHO Capacity Building developing very successful. Strict use of IHO CB Strategy Clear structure of processes and smooth execution Almost reached the limit with the resources available To reach this development the following contributions have to be acknowledged especially: generous contribution from ROK generous contribution from Nippon Foundation

4 Main Developments and Achievements (2)
To reach this development the following contributions have to be acknowledged especially (cont.): in-kind support from MS and Industry for CB execution work of the RHC CB Coordinators and Project Leaders contribution from France for EAtHC Definition Study work done by UK on CMEP, OECS and Commonwealth Seabed Mapping Programme work of NZ for the risk assessment and the PRNI Excellent support of Alberto Costa Neves

5 Main Developments and Achievements (3)
CB Funds: regular contributions from IHO Budget increased Balance at the end of the year small E-learning, blended-learning and TFT initiatives. Several initiatives are ongoing, namely EAHC/Training Research and Development Center (TRDC), project on MSI in the EAtHC.

6 Major challenges (1) Capacity Building Assistance in the IHO Secretariat The successful operation and further enhancement is at risk or even impossible without additional Capacity Building Assistance Significant increase in the level of activities other competing IHO requirements/priorities Noted by EIHC-5 (Decision No.2) Report of WP 1 at Assembly1 (item 78-80).

7 Major challenges (2) Capacity Building Assistance in the IHO Secretariat (cont.) CBSC Secretary too much involved in administrative work and other tasks in the Secretariat. Time needed to assist the CBSC in the development of the CB and the realization of the CB Strategy.

8 Major challenges (3) Additional Capacity Building Assistance needs:
Development of the CB Management System Integration with IHO GIS, CIS, document-system Validation of Student and Trainer Databases Process submissions and requests Maintenance of CB Publications Development of CB Procedures Assessment of the reports of the CB Activities Provide base knowledge available in the Secretariat to Technical Visit Team Leaders

9 Major challenges (4) Additional Capacity Building Assistance needs:
Provide mentoring to CB Coordinators Development and maintenance of the CB at the IHO website Development of best practices and questions and answers guide Collate performance indicators and statistics Liaison with project partners Management of projects Knowledge in the cooperation with donor agencies Other clerical support in CB execution

10 Major challenges (5) Need of additional funds
Available CB Funds provided are less than needed to even cover the expenses of projects with a higher priority. The number of submissions from the RHCs is stagnating due to the limited chances of getting funded. Member States can support the CB. Make use of national experts to get funds for projects.

11 Major challenges (6) Joint Capacity Building efforts with IMO
The formerly very productive joint work with the IMO has ceased Joint CB meeting cancelled Disadvantageous that IMO ITCP does not provide cooperation with the IHO in CB A success of comprehensive projects will depend on a good cooperation between organizations

12 Major challenges (7) CB Coordinators.
Necessary to nominate CB Coordinators permanently and allow participation in CBSC. SEPRHC still changes the CB Coordinator too often. Disadvantageous for the acceptance of projects and the allocation of CB funds. A cooperation with neighboring RHCs can improve the effectiveness of projects and thus also the chances to be funded.

13 CB Management The following CB Procedures have been adopted
Procedure 10: Management Plan Procedure 11: Assessment of the Status of CB Phases Procedure 12: Certificate for the Completion of CB Activities

14 Contribution to CB Contribution from Republic of Korea
Republic of Korea contributes significantly to the IHO CB Funding of students from IHO MS for the CAT A course at USM, Training for Trainer project, CAT B Module Course program held in Busan, ROK. Contribution of Japan through the Nippon Foundation (NF) IHO has implemented the NF-IHO Cartography, Hydrography and Related Training (NF-IHO CHART) Project, fully funded by the NF. Support from other MS and external support (i.e. Industry).

15 CB Work Programme

16 CB Work Programme 2017 and 2018 WP 2017 updated
IHO ROK Nippon Total Balance 2016 ,14 1 159,86 0,00 105 911,00 Income 2017 ,00 166 429,00 ,00 521 815,00 IHO Surplus 2017 191 000,00 2017 CBWP ,70 -169 219,00 -195 386,00 -825 169,70 Balance 2017 -4 813,56 -1 630,14 -6 443,70 Not funded yet 100 000,00 WP 2017 updated WP 2018 adopted, expenditures roughly €, Submissions sum up to €

17 E-Learning Decision 16 on PRO-2 during Assembly1
to take into account e-learning in the IHO CB Strategy consider using e-learning in its Capacity Building activities E-learning is already an integral tool in the CB Strategy CBSC edited the CB Strategy to give it a more prominent visibility. Changes kept as a working document to submit a new version of the CB Strategy to the Council prior to A-2. Several e-learning initiatives ongoing in CB provision. e-learning platform for the delivery of MSI in Francophone Africa EAHC TRDC has been engaged in e-learning development as well.

18 Statistics and Performance Indicators
Submission of projects from RHCs Year 2011 2012 2013 2014 2015 2016 2017 Submitted 14 31 28 29 30 33 32 Planned 21 Delivered 13,5 22 18 23 TBD CB-related Strategic Performance Indicators 4 and 5: Year 2011 2012 2013 2014 2015 2016 2017 SPI4 100% 97% 75% 93% SPI5 96% 73% 86% 82% 79% 88% TBD Statistics from the delivery of CB activities: no resources

19 Elections Chair Thomas Dehling, Germany has been re-elected
Lamberto Lamberti, Italy has been elected as Vice-Chair The contribution of Olumide Omotoso, Nigeria as the former Vice-Chair of the CBSC has been acknowledged Olumide Omotoso has been assigned as the “CBSC Ambassador for Africa”.

20 Proposals (1/2) IRCC is invited to take note of the report;
endorse the need of an urgent expansion of the IHO Secretariat support to CB and to request to the Council at its 1st Session to task the Secretary-General to ensure that the appropriate staff resources are provided to the CB-related activities. invite MS to investigate the possibilities of fund raising and engagement in CB via national organizations

21 Proposals (2/2) IRCC is invited to
take action as seen appropriate to revitalize the cooperation between IHO and IMO to invite SEPRHC to install a permanent CB Coordinator and to ensure his or her participation in the CBSC meetings take any other actions as appropriate.


Download ppt "Report of the Capacity Buildung Sub-Committee"

Similar presentations


Ads by Google