Presentation is loading. Please wait.

Presentation is loading. Please wait.

Report to CETIS EC SIG Meeting

Similar presentations


Presentation on theme: "Report to CETIS EC SIG Meeting"— Presentation transcript:

1 Report to CETIS EC SIG Meeting
SCORM By Scott Wilson, CETIS Report to CETIS EC SIG Meeting 25 Feb. 2003, London

2 The ADL Organisation US Department of Defence
Research and development labs: Washington Florida Wisconsin (Ottawa) (Telford)

3 SCORM requirements Replace CBT material with web material
Support tracking of learner activity in an LMS Support a conformance programme Usable by DoD, US Armed Forces, and associated government entities

4 SCORM Components IMS Content Packaging IMS Metadata
AICC Computer Managed Instruction ECMAScript Runtime model IMS Simple Sequencing (1.3) IMS QTI (1.3? Or 1.4?)

5 SCORM users National Guard Bureau NUSWC US Army USMC US Navy
Canadian DND

6 When to use SCORM 1.2 Materials are delivered by web browser
Materials use must be tracked by the LMS Learners operate independently Learners work self-paced

7 SCORM 1.3 Adds Sequencing Usable in programmed instruction and adaptive programmed instruction scenarios

8 Strengths Vendor support Large user community Based on IMS specs

9 Weaknesses Not intended for non-military use
Some metadata vocabs unsuitable Single, self-paced learner only Can only be used with browser-delivered learning Relies upon controlled browser configuration

10 Where SCORM is headed V1.4 V2.0+ QTI integration
Digital repository management V2.0+ Semantic web and other new technologies AI/Intelligent Tutoring Simulation integration (HLA)

11 Finding out more CETIS ADL http://www.cetis.ac.uk


Download ppt "Report to CETIS EC SIG Meeting"

Similar presentations


Ads by Google