Presentation is loading. Please wait.

Presentation is loading. Please wait.

Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.

Similar presentations


Presentation on theme: "Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM."— Presentation transcript:

1 Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM

2 Fulton Street Transit Center-Dey Street Connector - Overview Design and construction of a new pedestrian passageway connecting two new concourse levels by way of Cut & Cover construction and associated utility, sidewalk & roadway reconstruction Design and construction of two new concourse levels below existing track/platform levels of the R/W Cortlandt Street & 4/5 Fulton Street Stations | AECOM

3 Serve an Expected Commuter Traffic in the completed FSTC– 300,00 PPD Facilitate Connections to 12 NYC Transit Lines as part of the FSTC Provide a permanent below ground connection to the NJ PATH www.lowermanhattan.info Fulton Street Transit Center-Dey Street Connector - General Scope | AECOM

4 Post 9/11 Temporary Economic Loss Lower Manhattan – Comptrollers Assessment - $31 Billion 30 million sq ft of office space Private Sector Employment by October 2001– 51,000 jobs lost Temporary Infrastructure loss WTC PATH Station R/W – Cortland St Station 1/9 Downtown Access E – connection to PATH 7/22/01 PRE- 9/119/17/01 POST- 9/11 9/08/02 POST- 9/115/23/04 POST- 9/11 www.nycsubway.org/maps/historical.html#1980 | AECOM

5 Need #1- Post 9/11 - Access Revitalized Business District Decrease Congestion Increase ADA accessibility WTC Memorial Tourism Millions of tourists expected 85% generated through Subway Need for Increased ADA accessibility Need for Clear “connected” subway complex www.mta.info/capconstr/fstc | AECOM

6 NYC – Lower Manhattan Transportation Needs Post 9/11 – Revitalization Plan Improvement to regional transit access – essential to re- strengthening business district The Sustainability Challenge Enhance the level of service WTC Memorial Access Ensuring 1 million more people can get to work, school, etc Mass Transportation = Clean Air + Decreased Energy Consumption www.mta.info/capconstr/fstc | AECOM

7 NYC – Lower Manhattan Transportation Vision PRE- 9/11 Connections +++ Future WTC, WTC Memorial and WTC Transportation HUB Contract 3 Connector Dey Street or Fulton St www.lowermanhattan.info | AECOM

8 The Fulton Street Transit Center Transit = Access www.mta.info/capconstr/fstc | AECOM

9 The Fulton Street Transit Center Transit = Access www.mta.info/capconstr/fstc | AECOM

10 The Fulton Street Transit Center Transit = Access www.mta.info/capconstr/fstc | AECOM

11 The Fulton Street Transit Center – Dey Street Connector www.mta.info/capconstr/fstc | AECOM

12 Sub-Consultants New York Office Boston OfficeDey Street Structural Box OwnerDesign-Build Team The Fulton Street Transit Center – Dey Street Connector | AECOM

13 OwnerDesign-Build Team The Fulton Street Transit Center – Dey Street Connector | AECOM

14 Sub-Consultants New York Office Boston OfficeDey Street Structural Box OwnerDesign-Build Team The Fulton Street Transit Center – Dey Street Connector Civil - Roadway Civil - Utilities Structural CPS | AECOM

15 OwnerDesign-Build Team STAAD Inroads Microstation V8 The Fulton Street Transit Center – Dey Street Connector Geospatial Referencing Pre-BIM Ingenuity Base & Sheet File Management | AECOM

16 OwnerDesign-Build Team The Fulton Street Transit Center – Dey Street Connector | AECOM

17 OwnerDesign-Build Team STAAD Inroads Microstation V8 The Fulton Street Transit Center – Dey Street Connector Geospatial Referencing Pre-BIM Ingenuity Base & Sheet File Management | AECOM

18 OwnerDesign-Build Team The Fulton Street Transit Center – Dey Street Connector BASE FILES.BSE Existing Structure Reference Existing Utility Reference Gridlines – 4 phase project Secant Pile Coordinated & Final Position DESIGN FILES.DGN Design Files AutoCAD Design Files SHEET FILES.SHT Production Drawings | AECOM

19 A C R/W DEY ST High Roof & Option 1 4/5 | AECOM

20 A C The Fulton Street Transit Center – Dey Street Connector | AECOM

21 A C The Fulton Street Transit Center – Dey Street Connector | AECOM

22 A C R/W The Fulton Street Transit Center – Dey Street Connector | AECOM

23 The Fulton Street Transit Center – Dey Street Connector | AECOM

24 The Fulton Street Transit Center – Dey Street Connector | AECOM

25 The Fulton Street Transit Center – Dey Street Connector | AECOM

26 The Fulton Street Transit Center – Dey Street Connector | AECOM

27

28

29 A C R/W DEY ST The Fulton Street Transit Center – Dey Street Connector DEY ST | AECOM

30

31

32

33

34 A C R/W DEY ST High Roof & Option 1 | AECOM

35 Option 1 High Roof | AECOM

36

37 MTA New York City Transit CM-1349 Presentation Engineering Design and Construction Support Services for Emergency Ventilation Plants | AECOM

38 A C R/W DEY ST High Roof & Option 1 4/5 | AECOM

39

40

41

42

43 Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication


Download ppt "Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM."

Similar presentations


Ads by Google