Download presentation
Presentation is loading. Please wait.
Published byDustin Allen Modified over 6 years ago
1
802.16m Interference Mitigation DG Opening Report
May 5, 2009 Cairo, Egypt Co-chaired by: Clark Chen, Jeongho Park
2
802.16m IM DG Objectives of DG: Plan for today (for approval)
Harmonized baseline text for AWD Plan for today (for approval) Clarify DG rule 75% poll defined as consensus Go through all 22 contributions ToC draft Discussion of DG Report Prove of ToC draft and report to TGm
3
IM Contribution List
4
Chair’s Suggestion on ToC
15.2. X Interference Mitigation Mechanism 15.2.X.1 DL FFR 15.2.X.2 UL FFR 15.2.X.3 DL Multi-BS MIMO 15.2.x.4 UL Multi-BS MIMO (15.2.X.5 DL CSSI) * Each sub-section has the following content: DL/UL Signaling [PHY layer signaling is to be moved to corresponding chapters; make ref.] [MAC message and TLV is to be moved to Y and 11.Z respectively] Operation procedure [The interact protocol between ABS and AMS]
5
Proposed Text (to be updated by DG discussion)
6
Annex : IM Contribution List
Classify IM proposals according to their impact on AWD text Definition of terms PHY feature Content to be put into physical layer section PHY signaling Content to be put into physical control channel TLV (section 11.x in Rev2) MAC message (section ) MAC operation procedure Description of interaction between BS and MS Open to edit according to DG discussion
7
This is draft version
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.