1 „Europos savaitės” diskusija „ENERGETINIAI ŠALTINIAI IR JŲ TIEKIMAS – ENERGETINIO SAUGUMO AKTUALIJOS“ Vytautas Naudužas 2009 m. gegužės 11 d. Vilnius

2

3 2007 Total produc-tion Total consumption (+) Exp. (-) Imp. LT 14,01
2007 NORDEL NORDEL Zviedrija Somija Total produc-tion Total consumption (+) Exp. (-) Imp. LT 14,01 12,64 1,37 LV 4,12 6,57 -2,45 EE 8,44 7,12 1,32 26,57 26,33 0,24 Finland Sweden ESTLINK 350 MW Integrated Baltic and CIS energy system Norway Igaunija Estonia Russia Krievija Latvija Latvia Denmark Lithuania Lietuva Belorus (in TWh) Poland Baltkrievija Polija UCTE/ CENTRAL Europe Ukraine Germany Ukraina Czech

4 MAJOR GENERATION FACILITIES IN BALTICS
MAJOR GENERATION FACILITIES IN BALTICS TPP – Thermal Power Plant (šiluminė elektrinė) CHP – Combined Heat and Power Station (kogeneracinė elektrinė) HPP – Hydro Power Plant (hidroelektrinė) HPSP – Hydro Pumped Storage Plant (hidroakumuliacinė elektrinė) TPP – Thermal Power Plant CHP – Combined Heat and Power Plant HPP – Hydro Power Plant HPSP – Hydro Pumped Storage Plant

5 Coal-fired power plant
New NPP Capacity 400 MW CCGT unit Capacity 1500 MW (3000 MW) Annual production 11 TWh (22 TWh) 2010 NORDEL NORDEL Produc-tion Consumption (+) Exp. (-) Imp. LT 10,99 11,50 -0,51 LV 4,67 7,47 -2,80 EE 8,48 8,03 0,45 24,14 27 Zviedrija Sweden Finland Somija ESTLINK 350 MW Norvēģija Norway Integrated Baltic and CIS energy Lithuania – Sweden 1000 MW system Estonia Igaunija Russia Krievija Latvia Latvija -2.60 NPP – Nuclear Power Plant CCGT – Combined Cycle Gas Turbine plant Dānija Dānija Lietuva Lithuania Capacity 400 MW Coal-fired power plant (in TWh) Import in 2015 → 5 TWh Baltkrievija Belorus Polija Poland UCTE/ CENTRAL Europe Lithuania – Poland 1000 MW Germany Vācija Ukraine Ukraina Czech Čehija

6 ENERGETIKA – Lietuvos-Lenkijos dujų jungtis

7 ENERGETIKA – Baltijos jūros reg. dujotiekių plėtra
• EU Amber Project (1) • BalticPipe(2) • Finland-Estonia (3) • Mid Nordic Pipeline (4) • Mid Nordic Gas Grid (5) • Baltic Gas Interconnector (6) • North European Pipeline (7) • Bernau-Sczecin (8)

8 Can we meet all our electricity needs with renewables?
Does nuclear energy belongs to a museum? Can we meet all our electricity needs with renewables?

9 No chance without Nuclear !

10 PLANNED PROJECTS NPP LNG terminals UGS Coal fired power plant
Electricity lines & cables Gas pipelines

11 PRIORITY PROJECTS - LITHUANIA (1)
Electricity Networks Lithuania – Poland electricity interconnection (1000 MW) M€ Additional network strengthening M€ Lithuania – Sweden electricity interconnection (1000 MW) M€ Reconstruction of internal electricity grid M€ ∑ (1) M€

12 PRIORITY PROJECTS - LITHUANIA (2) Electricity Generation
New CCGT (400 MW) M€ New gas-fired co-generation power plants (total 250 MW) M€ Modernization of Kruonis HPSP (2 units) M€ New Nuclear Power Plant (3400MW) M€ ∑ (1 +2) M€

13 PRIORITY PROJECTS - LITHUANIA (3)
Natural Gas Liquefied Natural Gas Terminal, Klaipeda (2 Bill. m3/ year) M€ Underground Natural Gas Storage Syderiai, Lithuania (0.5 Bill. m3) M€ Gas pipeline to Poland Amber pipeline (5.5 Bill. m3/ year) M€ ∑ (1+2+3) M€

14 PRIORITY PROJECTS - LITHUANIA (4) Renewables and Energy Efficiency
New Renewable capacities for Electricity and Heat (to reach 23% target) 1000 M€ Renovation of public buildings M€ Housing modernization programme M€ ∑ ( ) M€

15 15

16 ENERGETIKA – UCTE Pirminės ekonominio- techninio pagrindimo
studijos duomenimis sinchroninės jungties galimi įgyvendinimo terminai – m., kaštai – 2.5 mlrd. eurų

17 IS IT A RIGHT WAY ?

18 IŠEITIS Efektyvaus energijos vartojimo ir taupymo skatinimas.
Atsinaujinančių energijos išteklių intensyvesnis naudojimas. Naujoji atominė jėgainė. Nevėluoti įgyvendinant projektus. Juos vykdyti kryptingai. Efektyviai pasinaudoti Europos Sąjungos fondų parama. Mažinti biurokratines kliūtis.

19

20 EU COMMON ENERGY POLICY?
LITHUANIA

21 STRUCTURE OF PRIMARY ENERGY CONSUMPTION IN LITHUANIA

22 POWER SYSTEMS IN EUROPE
POWER SYSTEMS IN EUROPE UPS – United Power System IPS – Integrated power system UCTE – Union for Co-ordination of Transmission of Electricity NORDEL, CENTREL – tai ne akronimai, o Skandinavų ir Centrinės Europos šalių Elektros sistemų bendradarbiavimo organizacijų pavadinimai ATSOI ir UKSTOA atitinkami šiose dviejose salose esančių atskirų el. energetinių sistemų bendradarbiavimo organizacijų pavadinimai