1 Bioscience Research Building
College Park, Maryland Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

2 Presentation Agenda Building and Construction Features
Independent Building Analysis Site Logistics Analysis Asbestos Research Summary Questions Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

3 Building Features General Info: 138,500 SF $55.8 million
Independent Building Site Logistics Asbestos Summary Questions General Info: 138,500 SF $55.8 million 4 floors (above grade) Laboratories & classrooms on 1st – 3rd floors Mechanical floor on 4th Construction Features: CM at Risk 2 year schedule (July 04-06) Connected to existing Biology- Psychology Building Central courtyard Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

4 Presentation Agenda Building and Construction Features
Independent Building Analysis Site Logistics Analysis Asbestos Research Summary Questions Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

5 Independent Building Original Building Design
Features Independent Building Site Logistics Asbestos Summary Questions Original Building Design Structurally tied into the existing Biology-Psychology Building on on the east and south sides Drawback: Schedule delay several processes a lot of coordination Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

6 Independent Building Proposed Building Design: “Independent Building”
Features Independent Building Site Logistics Asbestos Summary Questions Proposed Building Design: “Independent Building” New building will be set back from existing building ft Addition of columns/beams on these new sides Goals Schedule reduction Possible cost reduction Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

7 Independent Building Addition of new column/beam members:
Features Independent Building Site Logistics Asbestos Summary Questions Addition of new column/beam members: Calculated floor and roof loads Sized W-Shapes on 1st-4th floors with SAP 2000 software LL (psf) DL (psf) Floors 150 97 Roof 20 93.5 Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

8 Independent Building Addition of new column/beam members:
Features Independent Building Site Logistics Asbestos Summary Questions Addition of new column/beam members: Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

9 Independent Building Addition of new column/beam members: Steel (tons)
Features Independent Building Site Logistics Asbestos Summary Questions Addition of new column/beam members: Steel (tons) Material Cost ($) Columns 21.35 tons $12,169 Beams 40.22 tons $22,925 TOTAL 61.57 tons $35,094 Average per floor 15.39 tons $8,772 Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

10 Independent Building Other material and construction costs:
Features Independent Building Site Logistics Asbestos Summary Questions Other material and construction costs: Material & Labor Costs Foundation walls & excavation $62,234 Exterior walls (brick and curtain) $177,797 Doors $15,200 TOTAL $255,231 Total costs = approximately $290,000 + $20,000 per week (crane cost) Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

11 Independent Building Adjusting schedule for new design:
Features Independent Building Site Logistics Asbestos Summary Questions Adjusting schedule for new design: Schedule Result of new design Tie-in Process eliminated Substructure 3-5 days longer Superstructure 4-5 days longer Enclosure 7 weeks longer Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

12 Independent Building Adjusting schedule for new design:
Features Independent Building Site Logistics Asbestos Summary Questions Adjusting schedule for new design: New design eliminates all tie-in processes This is a substantial schedule and coordination advantage Tie-in process: contractor must study locations on steel drawings openings are cut in brick for a surveyor to take measurements steel is fabricated cut full size openings & grout base plates into pockets set steel pieces mason returns to fill in area around beams …in other words: a lot of tasks and coordination must take place Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

13 Presentation Agenda Building and Construction Features
Independent Building Analysis Site Logistics Analysis Asbestos Research Summary Questions Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

14 Site Logistics Original Site Logistics extremely tight site
Features Independent Building Site Logistics Asbestos Summary Questions Original Site Logistics extremely tight site lots of activities must share space ANALYSIS GOALS: relieve site congestion safer work site increase productivity/ reduce schedule Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

15 Site Logistics Original Site Logistics Focus on…
Features Independent Building Site Logistics Asbestos Summary Questions Original Site Logistics Focus on… Jobsite trailers and parking Material storage Cranes Truck and delivery routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

16 Jobsite Trailers/Parking
Site Logistics Features Independent Building Site Logistics Asbestos Summary Questions Jobsite Trailers/Parking PROBLEM: located too close to construction activities trailers storage cranes truck routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

17 Site Logistics Jobsite Trailers/Parking
Features Independent Building Site Logistics Asbestos Summary Questions Jobsite Trailers/Parking SOLUTION: relocate offsite, near by area northeast of site is open and trailers could moved to here University actually said this would have been feasible had this been proposed to them trailers storage cranes truck routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

18 Site Logistics Material Storage
Features Independent Building Site Logistics Asbestos Summary Questions Material Storage PROBLEM: no designated area on site, materials must arrive on site as needed trailers storage cranes truck routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

19 Site Logistics Material Storage SOLUTION: relocate to area
Features Independent Building Site Logistics Asbestos Summary Questions Material Storage SOLUTION: relocate to area across the street excess material could be stored here would open a larger time window for material deliveries to site trailers storage cranes truck routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

20 Site Logistics Features Independent Building Site Logistics Asbestos Summary Questions Cranes PROBLEM: no site crane is being used, contractors bring in own mobile cranes as necessary. This requires the need for regulation on the part of the CM trailers storage cranes truck routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

21 Site Logistics Cranes SOLUTION: remain the same
Features Independent Building Site Logistics Asbestos Summary Questions Cranes SOLUTION: remain the same crane policy will remain the same note: the largest crane will be that of the steel erector 3900T model (155 ton capacity) trailers storage cranes truck routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

22 Truck/Delivery Routes
Site Logistics Features Independent Building Site Logistics Asbestos Summary Questions Truck/Delivery Routes PROBLEM: all excavation must be hauled directly off campus, since no area nearby to temporarily dump dirt trailers storage cranes truck routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

23 Truck/Delivery Routes
Site Logistics Features Independent Building Site Logistics Asbestos Summary Questions Truck/Delivery Routes SOLUTION: keep existing truck route the same, but create an area where excavated material can be stored trailers storage cranes truck routes Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

24 Site Logistics Site Logistics: Conclusions Less Congestion Schedule
Features Independent Building Site Logistics Asbestos Summary Questions Site Logistics: Conclusions Less Congestion Schedule Reduction Feasibility No Change Jobsite Trailers YES Good - Jobsite Parking Material Storage Fair Cranes X Site Deliveries Truck Hauling OVERALL Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

25 Presentation Agenda Building and Construction Features
Independent Building Analysis Site Logistics Analysis Asbestos Research Summary Questions Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

26 Asbestos Asbestos Research
Features Independent Building Site Logistics Asbestos Summary Questions Asbestos Research GOALS - Learn about asbestos and its role in construction today What is it? Where can it be found? Advantages and disadvantages of its use Organizations today Relation to Bioscience Research Building project Summarize results in a one page asbestos guide Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

27 Asbestos What is asbestos? naturally occurring mineral
Features Independent Building Site Logistics Asbestos Summary Questions What is asbestos? naturally occurring mineral can be separated into smaller and smaller fibers nearly indestructible widely used in 1930s through 1970s combined with other materials to form asbestos- containing materials banned in the early 1970s general advantages & disadvantages organizations BRB summary guide Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

28 Asbestos Where can it be found?
Features Independent Building Site Logistics Asbestos Summary Questions Where can it be found? found in many different locations around U.S. many kinds of buildings especially in older facilities asbestos-containing materials can be found in items such as: general advantages & disadvantages organizations BRB summary guide duct insulation chalkboards cement pipes fireproofing materials vinyl flooring adhesives roofing felt high temp. gaskets plasters thermal & duct joint tape …and much more! Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

29 Asbestos Advantages & Disadvantages ADVANTAGES DISADVANTAGES
Features Independent Building Site Logistics Asbestos Summary Questions Advantages & Disadvantages ADVANTAGES DISADVANTAGES one of best insulators known to man health hazards if inhaled… (damaged asbestos releases fibers invisible to naked eye) fairly cheap to manufacture & install asbestosis, mesothelioma, & gastrointestinal cancers many uses for ACMs as shown in the previous table banned in 1970s, and now is being removed from many facilities prior to demolition general advantages & disadvantages organizations BRB summary guide Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

30 Asbestos Organizations Environmental Protection Agency (EPA)
Features Independent Building Site Logistics Asbestos Summary Questions Organizations Environmental Protection Agency (EPA) serves to protect human health & the environment established in 1970 repairing damage already done to environment, as well as establish new criteria to guide us U.S. Occupational and Health Administration (OSHA) formed in 1971 assure safety of workers set/enforce standards, provide training and education general advantages & disadvantages organizations BRB summary guide Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

31 Asbestos Bioscience Research Building
Features Independent Building Site Logistics Asbestos Summary Questions Bioscience Research Building project involves demolition and asbestos removal on the existing Biology-Psychology Building general advantages & disadvantages organizations BRB summary guide University of Maryland handles all asbestos control Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

32 Asbestos Summary Guide
Features Independent Building Site Logistics Asbestos Summary Questions Asbestos Summary Guide Asbestos Summary Guide Definition "any of several minerals (as chrysotile) that readily separate into long flexible fibers, that have been implicated as causes of certain cancers, and that have been used especially formerly as fireproof insulating materials." Properties resistant to chemicals and heat does not evaporate or dissolve in water often combined with other materials to form asbestos-containing materials (ACMs) Locations all around the United States, especially in older facilities History widely used in 1930s through 1970s before being banned in the 1970s due to health hazards ACMs found in materials listed in Table 3.1 Advantages great insulator Disadvantages hazardous fibers can be inhaled into lungs fairly cheap and easy to manufacture and install proven to cause diseases such as asbestosis, mesothelioma, and gastrointestinal cancers Safety Keep people informed on locations of ACMs Organizations Environmental Protection Agency (EPA) Look out for your own safety, as well as the safety of others U.S. Occupational Safety and Health Administration (OSHA) Contact supervisor if damaged asbestos is discovered Only certified professionals should be allowed in these areas Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

33 Presentation Agenda Building and Construction Features
Independent Building Analysis Site Logistics Analysis Asbestos Research Summary Questions Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

34 Summary Independent Building Analysis
Features Independent Building Site Logistics Asbestos Summary Questions Independent Building Analysis cost of constructing new wall system: about $300,000 adds 9 to 10 weeks during construction however, the process and coordination of the steel tie-ins is eliminated completely Site Logistics Analysis alternate proposals relieve site congestion can increase productivity and reduce schedule Asbestos Research learned about asbestos in construction today constructed a summary guide to inform those unfamiliar Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

35 Special Thanks Special Thanks to… AE Faculty AE Classmates
Features Independent Building Site Logistics Asbestos Summary Questions Special Thanks to… AE Faculty AE Classmates Barton Malow Company Pennsylvania State University University of Maryland Family & Friends Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

36 Presentation Agenda Building and Construction Features
Independent Building Analysis Site Logistics Analysis Asbestos Research Summary Questions Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

37 Questions ??? Matthew Hiestand Construction Management
Senior Thesis Presentation April 13, 2005

38 Additional Slides… Matthew Hiestand Construction Management
Senior Thesis Presentation April 13, 2005

39 Independent Building Substructure Schedule Comparison Original:
Features Independent Building Site Logistics Asbestos Summary Questions Substructure Schedule Comparison Original: Revised: Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

40 Independent Building Superstructure Schedule Comparison Original:
Features Independent Building Site Logistics Asbestos Summary Questions Superstructure Schedule Comparison Original: Revised: Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

41 Independent Building Building Enclosure Schedule Comparison Original:
Features Independent Building Site Logistics Asbestos Summary Questions Building Enclosure Schedule Comparison Original: Revised: Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

42 Independent Building Courtyard Comparison Original Courtyard Design:
Features Independent Building Site Logistics Asbestos Summary Questions Courtyard Comparison Original Courtyard Design: 3500 SF closed off completely only accessible from buildings Proposed Courtyard Design: 4350 SF open through 2 sides easily accessible from outside Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

43 Independent Building Stairs & Elevators Legend - stairwell - elevator
Features Independent Building Site Logistics Asbestos Summary Questions Stairs & Elevators Legend - stairwell - elevator Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

44 Building Features Owner Expectations
Independent Building Site Logistics Asbestos Summary Questions Owner Expectations The University of Maryland set a 2-year schedule for the project This thesis proposed several ways to possibly shorten this schedule instead of July 04-06, perhaps building could be ready for start of summer 2006 Quality is important because it is a research lab building, and the owner has given it a 2 year construction period to ensure this Even if schedule is not shortened, more time and effort can now be spent on improving building quality Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005

45 Building Features Lessons Learned
Independent Building Site Logistics Asbestos Summary Questions Lessons Learned Usually every change requires a trade-off. For example: Independent Building Higher cost of construction vs. Schedule reduction No tie-ins needed vs. Different aesthetics Site Logistics Less congestion for workers vs. Less usable campus area for U. of MD What may originally appear a simple change, affects whole project Matthew Hiestand Construction Management Senior Thesis Presentation April 13, 2005