Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Planning Committee (PPC): Session #68 Closing Report

Similar presentations


Presentation on theme: "Project Planning Committee (PPC): Session #68 Closing Report"— Presentation transcript:

1 802.16 Project Planning Committee (PPC): Session #68 Closing Report
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE ppc-10/0010r2 Date Submitted: Source: Jose Puthenkulam Project Planning Committee Chair Venue: San Diego, USA Base Contribution: None Purpose: Project Planning Committee Session #68 Closing Report of activities Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.

2 Outline PPC plan and agenda this week
Project planning discussion: New study areas M2M PAR & 5C comments Motions GRIDMAN and PPC joint session update M2M requirements TDD co-existence study item Hierarchical Networks study item Updated Project Planning Map Next steps Backup

3 PPC Plan and Agenda this week
Time slots Agenda Tue: PM1 (1-4PM) Opening Project Planning Discussion M2M PAR & 5C TDD Co-existence Study Report Tue: PM2 (4-6PM) Hierarchical Networks Study Report Wed: AM2 (10AM-12 PM) Joint session with GRIDMAN Discussion on Requirements Overlap issues between M2M (P802.16p) and GRIDMAN (P802.16n) M2M Requirements Input contributions discussion Discussion on Project planning aspects Wed: PM1 (1-4PM) M2M PAR & 5C Comments Wed: PM2 (4-6PM) Thu: AM (9AM-12PM) M2M Requirements Project Planning Map Update Call for contributions Closing

4 802.16 Evolution new study areas
We identified some new areas for study Smart Transport Active transport safety, Tracking, Vehicular M2M Location Finding/Ranging GPS Augmentation Using Peer to Peer Communication Much higher accuracy than E911 Indoor Location Mobile Wallets Mobile Gaming Systems beyond IMT-Advanced Oct ITU-R Workshop - Plan for Contribution by Sept session #69 Recommendation: Issue Call for contributions for New areas of Evolution and any study items required for future sessions

5 M2M PAR & 5C Comments We had 2 input contributions on the M2M PAR & 5C – Comments C80216ppc-10_0037.ppt - Security considerations for M2M C80216ppc-10_0045.doc - Comment on Machine to Machine (M2M) Communication PAR Form and Five Criteria We also received comments from , and Pat Thaler. As a result we revised the PAR form: We also drafted a response to the comments from , and Pat Thaler. We also received some additional comments based on our response that we need to address.

6 Moved: Jose Puthenkulam Second: Eldad Zeira Vote: 36/0/0
Motion Motion: To submit ppc-0003r9 as the draft p PAR & 5C for 802 EC approval. Also to authorize the chair to make any editorial changes as necessary. Moved: Jose Puthenkulam Second: Eldad Zeira Vote: 36/0/0 Note: ppc-0003r9 was created to address the additional comments from and the WG

7 GRIDMAN and PPC joint session update
We had a joint session with GRIDMAN on Wed AM2. Agenda : Requirements Overlap issues between M2M (P802.16p) and GRIDMAN (P802.16n) M2M Requirements Input contributions discussion Discussion on Project planning aspects Outcome: We reviewed some of the M2M requirements contributions There was some understanding that: Some of the smart metering requirements could be addressed in p. Both projects p and n would address different aspects of support for Smart Grid applications Also plan to continue requirements co-ordination between the two projects to address overlap concerns

8 M2M Requirements Discussion
We had 5 contributions on the M2M Requirements (802.16p SRD) C80216ppc-10_0038r2.doc - Outline of p System Requirements Document C80216ppc-10_0041r1.doc - M2M Requirements from Vehicular Use Cases C80216ppc-10_0042r2.ppt - Smart Grid Requirements for IEEE M2M Network C80216ppc-10_0043.doc - Proposed p System Requirements Document C80216ppc-10_0046.doc - Requirements for M2M communication We drafted an initial working document (802.16ppc-10/0011) for the p SRD:

9 TDD Co-existence study item
We received 1 contribution on the Study Item C80216ppc-10_0040.doc - Draft Study Report for Study Item on Co-existence with non-802 TDD systems After discussion the proposal was to adopt it is a baseline document using a motion. Motion to create TDD Co-existence Study Report working baseline (802.16ppc-10/007) based on C80216ppc-10_0040.doc Moved: Yanxiu Zheng Second: Huying Fang Approved with unanimous consent Plan is to issue a Call for comments & contributions for further development after this session towards the Sept. session.

10 Hierarchical Networks study item
We received the following contributions for the Hierarchical Networks study item C80216ppc-10_0039.doc - Multi-tier Simulation Methodology C80216ppc-10_0044.doc - Contribution for Hierarchical Network Study Report C80216ppc-10_0047.doc - Proposed Table of Content & Usage Models for Hierarchical Networks Study Report There was some drafting done offline to combine the contributions and then we create a baseline and adopted it with a motion. Motion to create Hierarchical Networks Study Report (802.16ppc-10/0008) as working baseline Moved: Shilpa Talwar Second: Ronny Kim Approved with unanimous consent Plan is to issue a Call for further comments & contributions towards the Sept. session.

11 802.16 Project Planning Map (1/2)
Study Items Description Project Target TimeLine M2M First Phase: New requirements for massive number of devices to be connected over 16 Networks. Study Item started: Mar 2010 WG PAR Approval: May 2010 EC PAR Approval: Jul 2010 TG Start: Sep 2010 Std Completion: Jul, 2012 Later Phase: More Advanced M2M capabilities TBD Hierarchical Networks Same RAT: Extensions to Advanced Air Interface (802.16m) for multi-tier deployments 802 Multi-RAT: Advanced network topologies offering high capacity at low cost Client Collaboration: Co-operation amongst clients Study item started: May 2010 WG PAR Approval: Jan 2011 EC PAR Approval: Mar 2011 TG Start: TBD Std Completion: TBD Co-existence with non- 802 TDD systems Co-existence with non-802 TDD systems. Example: TDS-CDMA, TD-LTE WG PAR Approval: Sep 2010 EC PAR Approval: Nov 2010 TG Start: Jan 2011

12 802.16 Project Planning Map (2/2)
Study Items Description Project Target TimeLine Enhanced QOE Improved quality of experience for mobile internet applications WG PAR Approval: 2011 EC PAR Approval: TBD TG Start: TBD Std Completion: TBD Ultra High Speed Networks (>1-5Gbps) Advanced MIMO, Higher Order Modulation, Higher Bandwidths, Multicarrier Green RAN Energy savings at Client and Network

13 Call for contributions for:
Next Steps Call for contributions for: Study Report for TDD Co-existence Study Report for Hierarchical networks M2M System Requirements Document New Study Items (ex: Smart Transport…) Conference calls For developing p M2M System Requirements Document Aug 25th : 5-7PM Pacific Time Sept 8th : 5-7PM Pacific Time

14 Backup

15 List of Input Contributions (1/2)
M2M PAR & 5C – Comments C80216ppc-10_0037.ppt - Security considerations for M2M C80216ppc-10_0045.doc - Comment on Machine to Machine (M2M) Communication PAR Form and Five Criteria TDD Co-existence Study Item C80216ppc-10_0040.doc - Draft Study Report for Study Item on Co-existence with non-802 TDD systems Hierarchical Networks Study Item C80216ppc-10_0039.doc - Multi-tier Simulation Methodology C80216ppc-10_0044.doc - Contribution for Hierarchical Network Study Report C80216ppc-10_0047.doc - Proposed Table of Content & Usage Models for Hierarchical Networks Study Report

16 List of Input Contributions (2/2)
M2M Requirements (SRD) C80216ppc-10_0038r2.doc - Outline of p System Requirements Document C80216ppc-10_0041r1.doc - M2M Requirements from Vehicular Use Cases C80216ppc-10_0042r2.ppt - Smart Grid Requirements for IEEE M2M Network C80216ppc-10_0043.doc - Proposed p System Requirements Document C80216ppc-10_0046.doc - Requirements for M2M communication


Download ppt "Project Planning Committee (PPC): Session #68 Closing Report"

Similar presentations


Ads by Google