Download presentation
Presentation is loading. Please wait.
1
CAP SANTE INTERNATIONAL PROJECTS
2
CUSTOM FIBERGLASS REPAIRS
BEFORE AFTER
3
BATHTUB REFINISHING BEFORE AFTER
4
WHIRLPOOL REFINISHING
BEFORE AFTER
5
WHIRLPOOL REFINISHING WITH COLOR CHANGE
BEFORE AFTER
6
TECHNICAL SPACE REFURBISHMENT
AFTER BEFORE
7
NEW WHIRLPOOL INSTALLS
8
SLIDE REFINISHING BEFORE AFTER
9
MAD RUBBER FLOOR COATING
10
FABRICATION OF TECHNICAL SPACE DOORS
BEFORE AFTER
11
FRP PANNEL REPLACEMENT
BEFORE AFTER
12
CUSTOM ADA RAMPS BEFORE AFTER
13
MOORING BRAKE OVERHAULS
14
BRAKE BAND REPLACEMENT
15
WRAPING HEAD REFIRBISHMENT
16
MOORING WINCH CLUTCH REPLACEMENT
17
FAIRLEAD ROLLER REPLACEMENT
Replaced Steel Roller with a Stainless Steel Roller (requires no maintenance)
18
GEAR BOX INSPECTIONS
19
WINDOW WASHING MACHINE OVERHAUL
AFTER BEFORE
20
MAST REPLACEMENT
21
LAUNDRY EQUIPMENT REPLACEMENT
Disassembled at shop Reassembled In Ship To Install Without Cutting The Hull
22
HYDRAULIC CYLINDER REPAIR
BEFORE AFTER
23
PAD EYE TESTING
24
LIFEBOAT FIBERGLASS REPAIRS
BEFORE AFTER
25
STRUCTURAL LIFE/TENDER BOAT REPAIRS
BEFORE AFTER
26
TRANSOM/HOOK REPAIR BEFORE AFTER
27
REFOAMING OF LIFE/TENDER BOATS
BEFORE AFTER
28
ENGINE EXCHANGE BEFORE AFTER
29
ENGINE OVERHAUL
30
CUSTOM LIFE/TENDER BOAT EXHAUST
BEFORE AFTER AFTER BEFORE
31
LIFE/TENDER BOAT SHAFT REPLACEMENT
32
BOAT RE-POWERING BEFORE: STEYR MOTOR WITH HAMILTON JET
AFTER : HONDA 4 STROKE OUTBOARD
33
REPAINTING OF LIFE/TENDER/FRC
BEFORE BEFORE AFTER AFTER
34
ANNUAL INSPECTION ON WINCHES
35
DAVIT MODIFICATION AND REPAIR
36
TRAINING PLATFORMS INSTALLATION
37
CUSTOM ACCENT PIECES
38
CAP SANTE INTERNATIONAL PROJECTS
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.