6 Second Annual Sustainable Mobility Conference
Phil Dominey Stakeholder & Accessibility Manager A part of the Stagecoach Group

7 Agenda Station Improvements Department for Transport - Access for All
Department for Transport – Small Schemes National Station Improvements Programme Olympics 2012 Integration Projects Cycle Initiatives Bike Schemes Other Inclusion Methods

8 Department for Transport – Access for All Programme
£370m ring-fenced funding up to 2015 Funding across the Country to improve access at stations over and above franchise commitments/Network Rail renewals Works on site at Farnborough, Staines and Clapham Jct. Works commence during Summer 2011 at Earlsfield and Vauxhall Further stations schemes during Control Point 4 include Fleet, New Malden and Winchester

9 Access for All - Farnborough
Project cost £2m Delivery agent – Network Rail Completion June 2011 One of the largest single footbridge span in the Country. 37mtrs long

10 Farnborough – New footbridge

11 Access for All – Clapham Junction
Project cost £12.5m Delivery agent – Network Rail Completed May 2011 Improvements include:- - Lifts platforms 1-17 - Additional staircases to platform 11/12 & 15/16 - Brighton Yard Entrance – new forecourt with level access to the overbridge, new station entrance with full ticketing arrangements and accessible toilet

12 Clapham Junction – Booking Hall

13 Clapham Junction – Forecourt

14 Clapham Junction – Lifts/Stairs

15 Station Improvements Accessible toilets e.g. West Byfleet, Christchurch Low counter ticket windows e.g Salisbury, Aldershot, Portsmouth & Southsea Anti-slip e.g. Bagshot, Ashford (Mx), Wool Help Points – Induction loops Blue Badge Parking bays Automatic doors Handrails e.g. Farnborough, Ewell West Ticket Window induction loop test

16 Access for All – Small Schemes
New process introduced from 2011/12 £7m pa Government funded initiative South West Trains 2011/12 allocation £446k Island Line £9k Schemes planned – subject to DfT approval include:- Accessible toilets, low counter ticket windows, handrails DfT ‘Mid Tier’ funding schemes – TOC submitted proposals - £1m limit (Alton, Aldershot, Chessington S, Richmond & Wokingham)

17 National Station Improvements Programme
Honiton - Accessible toilet, compliant ramp access to both platforms, low counter ticket window, automatic doors Wokingham - Accessible toilet, low counter ticket window, automatic doors, new forecourt and blue badge parking area Andover - Booking hall enlarged, low counter ticket window, new forecourt and blue badge parking area Southampton Central - New level access station entrance, new accessible toilets, low counter ticket windows

18 Olympics 2012 Windsor & Eton Riverside - Level access, ramps Accessible toilet alterations/seating Weymouth - Compliant ramp to the station entrance, improvements to the toilets/seating Wimbledon - Improve visibility, safety and security of lift area also Council/NSIP forecourt scheme Richmond - Improve visibility, safety and security of lift area and seating provision

19

20

21 Integration Projects Farnborough Forecourt Integration scheme
Bracknell Forecourt Integration scheme Gillingham station forecourt scheme Partnership working with the respective councils Improved Interchange with buses, taxi’s, cycles and corporate buses Closer links with Southampton Airport through bus, footbridge, cycle and real time rail information More to Come!

22 Cycle Initiatives Partnership working 2500 cycle spaces
62+ stations benefit Secure cycle compounds installed New Cycle Routes New Cycle channels Integrated Schemes Bike Hire extended Bike Hire Richmond Bike Surgeries and Safety Campaigns New Brompton Pod Plus Bike

23 Brompton Bike Scheme Waterloo

24 Richmond Station Bike N Ride
In partnership with SWT and originally Evans Cycles Aim to increase rail / cycle integration 50 standard and 20 Brompton bikes Encourage visitors and local employees to cycle particularly for shorter journeys Supported by comprehensive marketing / promotional campaign

25 Brompton Pod Guildford
80 South West Trains Bikes Transec Issues Part 3 of partnership Brompton’s and South West Trains

26 Lock it or Lose It Campaign
Twickenham Richmond Teddington Hampton Wick Bike marking, theft awareness, cyclist training sign ups, bike maintenance sign ups, Dr Bike

27 Bike checks and repairs
In Association with Bike checks and repairs Clean up Safety checks Maintenance Punctures 30th October St Denys Train Station Adelaide Rd pm Neighbourhood Wardens “Working with you to improve your neighbourhood”

28 Other Inclusion Methods
Live Red Funnel, Wightlink Ferries, Hovertravel & BAA Southampton IKEA Southampton Discussion with shopping centres, Universities and Theme Parks Marwell Park link Sandown Ramp (social inclusion unit) Increased usage and awareness

29 Thank You?