1 Carpentry one Review

2 C. steeped continuous footing D. grade beam
A type of footing commonly used to support poured concrete or concrete block walls is a ______. A. Pier B. continuous footing C. steeped continuous footing D. grade beam

3 C. steeped continuous footing D. grade beam
A type of footing commonly used to support poured concrete or concrete block walls is a ______. A. Pier B. continuous footing C. steeped continuous footing D. grade beam

4 A. when the concrete can support the weight of a average person
When removing forms for floors and similar types of slabs, the forms should be removed ______. A. when the concrete can support the weight of a average person B. after 7 to 14 days C. after 1 or 2 days D. when directed by a structural engineer

5 A. when the concrete can support the weight of a average person
When removing forms for floors and similar types of slabs, the forms should be removed ______. A. when the concrete can support the weight of a average person B. after 7 to 14 days C. after 1 or 2 days D. when directed by a structural engineer

6 A type of footing used to support posts, columns, and similar structures is a ______.
A. continuous footing B. grade beam C. pier D. stepped continuous footing

7 A type of footing used to support posts, columns, and similar structures is a ______.
A. continuous footing B. grade beam C. pier D. stepped continuous footing

8 The horizontal brace used to hold a form in place is known as a ______.
A. batten B. bulkhead C. strongback D. waler

9 The horizontal brace used to hold a form in place is known as a ______.
A. batten B. bulkhead C. strongback D. waler

10 Green concrete is so named because of its ______.
A. color B. incomplete curing C. use D. mold ability

11 Green concrete is so named because of its ______.
A. color B. incomplete curing C. use D. moldability

12 To prevent concrete from freezing before it cures in cold weather, ____can be used.
A. flowing water B. expanded plastic cell slabs C. plastic sheeting D. curing compounds

13 To prevent concrete from freezing before it cures in cold weather, ____can be used
A. flowing water B. expanded plastic cell slabs C. plastic sheeting D. curing compounds

14 A skin irritation that can be caused by exposure to cement is called _____.
A. lime abrasion B. cement aggravation C. cement dermatitis D. pozzolanic reaction

15 A skin irritation that can be caused by exposure to cement is called _____.
A. lime abrasion B. cement aggravation C. cement dermatitis D. pozzolanic reaction

16 A sheet materials specifically made for use as form sheathing is known as _____.
A. sheetrock B. particle board C. plyform D. tempered hardboard

17 A sheet materials specifically made for use as form sheathing is known as _____.
A. sheetrock B. particle board C. plyform D. tempered hardboard

18 A. heavyweight B. roller-compacted C. mass D. preplaced
A type of concrete that can be placed without the use of a form is ______ concrete. A. heavyweight B. roller-compacted C. mass D. preplaced

19 A. heavyweight B. roller-compacted C. mass D. preplaced
A type of concrete that can be placed without the use of a form is ______ concrete. A. heavyweight B. roller-compacted C. mass D. preplaced

20 The purpose of form sheathing is to ____.
A. form the slab perimeter B. maintain the spacing C. provide primary support D. strengthen joints

21 The purpose of form sheathing is to ____.
A. form the slab perimeter B. maintain the spacing C. provide primary support D. strengthen joints

22 A. pretension steel B. rerods C. WWF D. ties
Steel bars that bonded within concrete to increase its strength are sometimes called ______. A. pretension steel B. rerods C. WWF D. ties

23 A. pretension steel B. rerods C. WWF D. ties
Steel bars that bonded within concrete to increase its strength are sometimes called ______. A. pretension steel B. rerods C. WWF D. ties

24 An upright member used to stiffen a form is a _________.
A. pliaster B. strongback C. cleat D. scab

25 An upright member used to stiffen a form is a _________.
A. pliaster B. strongback C. cleat D. scab

26 Most building codes require that bridging be installed in rows between floor joist at intervals not more than _____. A. 4’ B. 6’ C. 8’ D. 10’

27 Most building codes require that bridging be installed in rows between floor joist at intervals not more than _____. A. 4’ B. 6’ C. 8’ D. 10’

28 A. Braced B. Platform C. Balloon D. Post-and-beam
The type of construction where each floor of a structure is built as an individual unit is _______. A. Braced B. Platform C. Balloon D. Post-and-beam

29 A. Braced B. Platform C. Balloon D. Post-and-beam
The type of construction where each floor of a structure is built as an individual unit is _______. A. Braced B. Platform C. Balloon D. Post-and-beam

30 A rule of thumb for construction girder pockets is that the pocket should be at least _____ wider than the girder must have at lease _____ of bearing on the wall. A. 1”;4” B. 3”;5” C. 2”;5” D. 2”;4”

31 A rule of thumb for constructing girder pockets is that the pocket should be at least _____ wider than the girder must have at lease _____ of bearing on the wall. A. 1”;4” B. 3”;5” C. 2”;5” D. 2”;4”

32 Balloon frame construction is rarely used today because _____.
A. It conflicts with most current building codes B. Of lumber and labor costs C. It experiences a relatively large amount of settling D. The shrinkage of the wood framing members is high

33 Balloon frame construction is rarely used today because _____.
A. It conflicts with most current building codes B. Of lumber and labor costs C. It experiences a relatively large amount of settling D. The shrinkage of the wood framing members is high

34 To fasten headers to joists, you would use _____ box nails.
B. 8d C. 10d D. 16d

35 To fasten headers to joists, you would use _____ box nails.
B. 8d C. 10d D. 16d

36 A. Specifications B. Structural drawing C. Foundation plan
When looking for the quality of materials and methods of construction for a floor assembly, you would refer to the _____. A. Specifications B. Structural drawing C. Foundation plan D. Floor plans

37 A. Specifications B. Structural drawing C. Foundation plan
When looking for the quality of materials and methods of construction for a floor assembly, you would refer to the _____. A. Specifications B. Structural drawing C. Foundation plan D. Floor plans

38 To fasten wood cross-bridging and subfloors, you would use ____ box nails.
A. 6d B. 8d C. 10d D. 16d

39 To fasten wood cross-bridging and subfloors, you would use ____ box nails
A. 6d B. 8d C. 10d D. 16d

40 Sills are normally made from ______ lumber.
A. 2 x 6 B. 1 x 4 C. 2 x 4 D. 2 x 10

41 Sills are normally made from ______ lumber.
A. 2 x 6 B. 1 x 4 C. 2 x 4 D. 2 x 10

42 Which of the following drawings would show the location of floor openings for stairways?
A. Elevation drawing B. Plot plan C. Foundation plan D. Floor plan

43 Which of the following drawings would show the location of floor openings for stairways
A. Elevation drawing B. Plot plan C. Foundation plan D. Floor plan

44 For a given length and size, the type of floor joist with the most strength is a [an] ____.
A. I-beam B. wooden joist C. Truss with a steel web D. Truss with a wood web

45 For a given length and size, the type of floor joist with the most strength is a [an] ____.
A. I-beam B. wooden joist C. Truss with a steel web D. Truss with a wood web

46 When installing plywood subflooring, nail the panels every ______ along the edge.
C ” D ”

47 When installing plywood subflooring, nail the panels every ______ along the edge.
C ” D ”

48 Next 6 questions use this size house
48’-0” long 32’-0” wide Use three 2 x 12s for beam 48 32

49 How many lineal feet of 2x6 sill material are needed?
80’ 128’ 160’ 192 SHOW WORK _________________

50 How many lineal feet of 2x6 sill material are needed?
80’ 128’ 160’ 192

51 How many lineal feet of 2x12s are needed for the beam?
48’ 96’ 144’ 192’ SHOW WORK ________________

52 How many lineal feet of 2x12s are needed for the beam
48’ 96’ 144’ 192’

53 How many 2x8 joists are needed if the joists are spaced 16” OC ?
36 37 72 74 SHOW WORK ____________

54 How many 2x8 joists are needed if the joists are spaced 16” OC ?
36 37 72 74

55 How many lineal feet of 2x8s are needed for joist headers ?
32’ 48’ 64’ 96’ SHOW WORK __________________

56 How many lineal feet of 2x8s are needed for joist headers ?
32’ 48’ 64’ 96’

57 How many feet of 2x8s are needed for solid bridging?
48’ 96’ 144’ 192’ SHOW WORK ____________

58 How many feet of 2x8s are needed for solid bridging?
48’ 96’ 144’ 192’

59 How many 4’x8’ panels of subflooring are needed?
42 44 46 48 SHOW WORK ______________

60 How many 4’x8’ panels of subflooring are needed?
42 44 46 48

61 Wooden joists are normally placed ______ OC with the crown _____.
16” up 16” down 24” up 24” down

62 For a given length and size, the type of floor joist with the most strength is a (n) ______.
Truss with a steel web Truss with a wood web Wooden joist I-beam

63 For a given length and size, the type of floor joist with the most strength is a (n) ______.
Truss with a steel web Truss with a wood web Wooden joist I-beam

64 Which of these tasks falls into the category of rough carpentry ?
Framing a house Building and installing cabinets Applying exterior siding Applying exterior trim

65 Which of these tasks falls into the category of rough carpentry ?
Framing a house Building and installing cabinets Applying exterior siding Applying exterior trim

66 A program that requires a trainee to demonstrate the ability to perform job-related tasks is known as a[an] _______program. Accredited Standardized On-the-job training Competency-base

67 A program that requires a trainee to demonstrate the ability to perform job-related tasks is known as a[an] _______program. Accredited Standardized On-the-job training Competency-base

68 Iron tools such as saws, hatchets, and rasps have been available for about ____ years?
500 150 2,000 5,000

69 Iron tools such as saws, hatchets, and rasps have been available for about ____ years?
500 150 2,000 5,000

70 The person who is licensed to design buildings and oversee their construction is the _______.
General Contractor Supervisor Master Carpenter Architect

71 The person who is licensed to design buildings and oversee their construction is the _______.
General Contractor Supervisor Master Carpenter Architect

72 Which of these is not a characteristic of an apprenticeship program?
There is a minimum age requirement The amount of classroom training equals the amount of on-the-job training There is a progressive wage scale Job performance is periodically evaluated

73 Which of these is not a characteristic of an apprenticeship program?
There is a minimum age requirement The amount of classroom training equals the amount of on-the-job training There is a progressive wage scale Job performance is periodically evaluated

74 In order to become a master carpenter , you must first have been a[an]__________.
Supervisor General Contractor Estimator Journeyman

75 In order to become a master carpenter , you must first have been a[an]__________.
Supervisor General Contractor Estimator Journeyman

76 The minimum amount of classroom training required per year in an apprentice training program is ___ hours. 200 2,000 144 250

77 The minimum amount of classroom training required per year in an apprentice training program is ___ hours. 200 2,000 144 250

78 The Youth Apprenticeship Program is designed for __________ students.
College 7th and 8th grade 11th grade Grade school

79 The Youth Apprenticeship Program is designed for __________ students.
College 7th and 8th grade 11th grade Grade school

80 When you report for a new job, you should not expect the employer to ___________.
Have knowledge of all unsafe conditions and equipment at the worksite Show you how to do the job safety Provide you with personal protective equipment Warn you about specific hazards

81 When you report for a new job, you should not expect the employer to ___________.
Have knowledge of all unsafe conditions and equipment at the worksite Show you how to do the job safety Provide you with personal protective equipment Warn you about specific hazards

82 Which of these is a true statement regarding availability for work ?
Unless you are ill or have a family emergency, you should be on the job by the specified time It is not necessary to call in because employers hire extra people, knowing that employees occasionally like to take a day off. Being on time means being no more than 15 minutes late It is okay to be absent as long as you call in

83 Which of these is a true statement regarding availability for work ?
Unless you are ill or have a family emergency, you should be on the job by the specified time It is not necessary to call in because employers hire extra people, knowing that employees occasionally like to take a day off. Being on time means being no more than 15 minutes late It is okay to be absent as long as you call in

84 The _________ is used to connect splices , corners, and partitions that are at right angles to a wall. Header Top plate Double top plate soleplate

85 The _________ is used to connect splices , corners, and partitions that are at right angles to a wall. Header Top plate Double top plate soleplate

86 The framing member that touches the trimmer stud and the header is known as the _________.
Cripple stud King stud Sill Common stud

87 The framing member that touches the trimmer stud and the header is known as the _________.
Cripple stud King stud Sill Common stud

88 The width of a header for a window or door rough opening is usually equal to the width of the _____.
Rough opening less the width of the trimmer studs Rough opening plus the width of the trimmer studs and king studs Rough opening plus the width of the trimmer studs Door or window

89 The width of a header for a window or door rough opening is usually equal to the width of the _____.
Rough opening less the width of the trimmer studs Rough opening plus the width of the trimmer studs and king studs Rough opening plus the width of the trimmer studs Door or window

90 The maximum span of a 2’x 8’ exterior header in a one–story building is ____.
16’ 4’ 8’ 20’

91 The maximum span of a 2’x 8’ exterior header in a one–story building is ____.
16’ 4’ 8’ 20’

92 The dimensions of a door marked “3668” on a floor plan are ________.
36” wide, 68” high 36” wide, 6’-8” high 3’-6” wide, 6’-8” high 36’ wide, 6’-8” high

93 The dimensions of a door marked “3668” on a floor plan are ________.
36” wide, 68” high 36” wide, 6’-8” high 3’-6” wide, 6’-8” high 36’ wide, 6’-8” high

94 The total width of a rough opening includes the window or door plus the ______.
Thickness of the jamb material plus the shim clearance Combined thickness of the trimmer and king studs Combined thickness of the trimmer and king studs plus the shim thickness Thickness of the trimmer studs plus the shim thickness

95 The total width of a rough opening includes the window or door plus the ______.
Thickness of the jamb material plus the shim clearance Combined thickness of the trimmer and king studs Combined thickness of the trimmer and king studs plus the shim thickness Thickness of the trimmer studs plus the shim thickness

96 To determine the length of a cripple stud above a door ?
A) Subtract the length of a trimmer from the length of a common stud B) Combine the height of the trimmer and the thickness of the header, then subtract that result from the length of a common stud C) Subtract the height of the door from the length of s common stud D) Combine the height of the trimmer and the thickness of the header, then subtract that result from the length of a common stud combined with the thickness of the sill

97 To determine the length of a cripple stud above a door ?
A) Subtract the length of a trimmer from the length of a common stud B) Combine the height of the trimmer and the thickness of the header, then subtract that result from the length of a common stud C) Subtract the height of the door from the length of s common stud D) Combine the height of the trimmer and the thickness of the header, then subtract that result from the length of a common stud combined with the thickness of the sill

98 When APA-rated sheathing is used, space the nails ______ apart at intermediate studs.
6” 12” 16” 24”

99 When APA-rated sheathing is used, space the nails ______ apart at intermediate studs.
6” 12” 16” 24”

100 When ceiling joists are spliced, there should be a minimum overlap of ____.
6” 8” 12” 18”

101 When ceiling joists are spliced, there should be a minimum overlap of ____.
6” 8” 12” 18”

102 How many pieces of 16’ lumber are needed for the soleplates, top plates, and double top plates of a building 40’wide and 30’ long ? 18 27 22 33

103 How many pieces of 16’ lumber are needed for the soleplates, top plates, and double top plates of a building 40’wide and 30’ long ? 18 27 22 33

104 What is the height of a stud when the building has a ½” sheetrock ceiling, a 5/8” underlayment, a ¾” subfloor, and an 8’ ceiling height ? 91 ¼” 92 ¾” 92 5/8” 93”

105 What is the height of a stud when the building has a ½” sheetrock ceiling, a 5/8” underlayment, a ¾” subfloor, and an 8’ ceiling height ? 91 ¼” 92 ¾” 92 5/8” 93”

106 When laying out ceiling joists for a hip roof, you would ________.
Start at each corner and work toward the middle Start at the middle and work toward the corners Start at one corner and work to the other corner Any of the above

107 When laying out ceiling joists for a hip roof, you would ________.
Start at each corner and work toward the middle Start at the middle and work toward the corners Start at one corner and work to the other corner Any of the above

108 If lumber is used in contact with masonry, it must be _________.
Secured with epoxy Pressure-treated Separated by waterproof underlayment Secured with finishing nails

109 If lumber is used in contact with masonry, it must be _________.
Secured with epoxy Pressure-treated Separated by waterproof underlayment Secured with finishing nails

110 When constructing a non-bearing wall with steel studs, the ______________ determines the spacing between studs. Supervisor Type and thickness of the drywall Gauge of the metal Weight of the ceiling

111 When constructing a non-bearing wall with steel studs, the ______________ determines the spacing between studs. Supervisor Type and thickness of the drywall Gauge of the metal Weight of the ceiling

112 If you are constructing a building where siding will be applied over the sheathing, you should use a minimum of _______thick sheathing. 3/8” ½” 5/8” 1”

113 If you are constructing a building where siding will be applied over the sheathing, you should use a minimum of _______thick sheathing. 3/8” ½” 5/8” 1”

114

115 MDO OSB Mineral fiberboard HDO
Which of the following types of sheet material is used in high-wear applications such as concrete forms, cabinets, and countertops ? MDO OSB Mineral fiberboard HDO

116 MDO OSB Mineral fiberboard HDO
Which of the following types of sheet material is used in high-wear applications such as concrete forms, cabinets, and countertops ? MDO OSB Mineral fiberboard HDO

117 The anchor shown in the figure below is called a(n) ____.
Sleeve anchor Toggle bolt Drive anchor Expandable anchor

118 The anchor shown in the figure below is called a(n) ____.
Sleeve anchor Toggle bolt Drive anchor Expandable anchor

119 Type of putty used to seal nail holes
A nail set is a ___. Type of putty used to seal nail holes Pneumatic tool used to install roofing nails Tool used to drive finishing nails below the surface of the material Package of different kinds of nails

120 Type of putty used to seal nail holes
A nail set is a ___. Type of putty used to seal nail holes Pneumatic tool used to install roofing nails Tool used to drive finishing nails below the surface of the material Package of different kinds of nails

121 Lumber inspection criteria are defined by ___.
The carpenter who buys it The building supply company that sells it Lumber producing associations The architect

122 Lumber inspection criteria are defined by ___.
The carpenter who buys it The building supply company that sells it Lumber producing associations The architect

123 Mastic Casein glue Contact cement epoxy
The type of adhesive that is applied with a dual-cartridge applicator is ___. Mastic Casein glue Contact cement epoxy

124 Mastic Casein glue Contact cement epoxy
The type of adhesive that is applied with a dual-cartridge applicator is ___. Mastic Casein glue Contact cement epoxy

125 Which of these types of engineered limber would be more likely to be used for millwork than as support beams ? PSL LVL Glulam LSL

126 Which of these types of engineered limber would be more likely to be used for millwork than as support beams ? PSL LVL Glulam LSL

127 The dimensions of a typical concrete block are ____ inches.
2x2x12 6x12x8 4x4x8 8x8x16

128 The dimensions of a typical concrete block are ____ inches.
2x2x12 6x12x8 4x4x8 8x8x16

129 A frame for making window and door openings Type of concrete block
A buck is a ___. A frame for making window and door openings Type of concrete block Type of floor form A name used for a certain type of interior partition

130 A frame for making window and door openings Type of concrete block
A buck is a ___. A frame for making window and door openings Type of concrete block Type of floor form A name used for a certain type of interior partition

131 Wash skin that is exposed to the sawdust
Which of the following is not recommended when cutting pressure-treated lumber? Wash clothing that is exposed to sawdust separately from other clothing Wash skin that is exposed to the sawdust Wear eye protection and a dust mask Burn any scrap pieces

132 Wash skin that is exposed to the sawdust
Which of the following is not recommended when cutting pressure-treated lumber? Wash clothing that is exposed to sawdust separately from other clothing Wash skin that is exposed to the sawdust Wear eye protection and a dust mask Burn any scrap pieces

133 Duplex nails are commonly used to ___.
Fasten metal or wood to concrete Secure concrete form and scaffold members Install drywall panels Install window and door casings

134 Duplex nails are commonly used to ___.
Fasten metal or wood to concrete Secure concrete form and scaffold members Install drywall panels Install window and door casings

135 No more than 15 percent More than 19 percent No more than 19 percent
The term S-dry on a lumber grade stamp means that the lumber contains ___ moisture. No more than 15 percent More than 19 percent No more than 19 percent Less than 10 percent

136 No more than 15 percent More than 19 percent No more than 19 percent
The term S-dry on a lumber grade stamp means that the lumber contains ___ moisture. No more than 15 percent More than 19 percent No more than 19 percent Less than 10 percent

137 Which of the following grade designations represents the lowest quality plywood veneer.
B N D

138 Which of the following grade designations represents the lowest quality plywood veneer.
B N D

139 Which grade of hardboard can be used in exterior applications
Standard Pegboard Particleboard tempered

140 Which grade of hardboard can be used in exterior applications
Standard Pegboard Particleboard tempered

141 A 20-penny nail is approximately ____ long
6” 4” 8” 10”

142 A 20-penny nail is approximately ____ long
6” 4” 8” 10”

143 A bolt with an oval, unslotted head is called a ___ bolt.
Machine Lag Stove carriage

144 A bolt with an oval, unslotted head is called a ___ bolt.
Machine Lag Stove carriage

145 Lag Common Sheet metal machine
Because of its deep threads and holding power, the ___screw is recommended for use with particleboard and hardboard Lag Common Sheet metal machine

146 Lag Common Sheet metal machine
Because of its deep threads and holding power, the ___screw is recommended for use with particleboard and hardboard Lag Common Sheet metal machine

147 Double expansion anchor Concrete screw
The ___ is a type of masonry anchor that is set into the concrete while the concrete is still wet Snap-off anchor Anchor bolt Double expansion anchor Concrete screw

148 Double expansion anchor Concrete screw
The ___ is a type of masonry anchor that is set into the concrete while the concrete is still wet Snap-off anchor Anchor bolt Double expansion anchor Concrete screw

149 Light framing lumber is classified as ___ lumber
Shiplapped Common Rough dimensions

150 Light framing lumber is classified as ___ lumber
Shiplapped Common Rough dimensions

151 The term quarter- sawed means___.
Only one-fourth of the tree is used The lumber is classified as softwood The log is cut into four equal lengths before it is cut into lumber The lumber is cut with the growth rings at an angle greater than 45 degrees

152 The term quarter- sawed means___.
Only one-fourth of the tree is used The lumber is classified as softwood The log is cut into four equal lengths before it is cut into lumber The lumber is cut with the growth rings at an angle greater than 45 degrees

153 How man board feet are there in (40) 2”x4”x12’ studs
640 320 384 3,840

154 How man board feet are there in (40) 2”x4”x12’ studs
640 320 384 3,840

155

156 All of the following are types of geometrical stairs except ______.
Circular Elliptical Double-L Spiral

157 All of the following are types of geometrical stairs except ______.
Circular Elliptical Double-L Spiral

158 All of the following are parts of a balustrade except _________.
A baluster A newel post Nosing A handrail

159 All of the following are parts of a balustrade except _________.
A baluster A newel post Nosing A handrail

160 The minimum standard headroom for commercial use is _________.
6’-4” 6’-6” 6’-8” 6’-10”

161 The minimum standard headroom for commercial use is _________.
6’-4” 6’-6” 6’-8” 6’-10”

162 When building a stair with a total rise of 7’-7”, the number of risers required and their unit of rise is _______. 11 risers, each 7 ½” high 12 risers, each 7” high 13 risers, each 7” high 14 risers, each, 7 ¼” high SHOW WORK _____________

163 When building a stair with a total rise of 7’-7”, the number of risers required and their unit of rise is _______. 11 risers, each 7 ½” high 12 risers, each 7” high 13 risers, each 7” high 14 risers, each, 7 ¼” high

164 A stair with a total rise of 7’-7” and a total run of 9’-0”, with the stairwell header used as the last riser, requires _____ treads with a _____ unit run. 11 treads; 9” wide 11 treads; 9 ½” wide 12 treads; 9” wide 12 treads; 9 ½” wide SHOW WORK __________________________

165 A stair with a total rise of 7’-7” and a total run of 9’-0”, with the stairwell header used as the last riser, requires _____ treads with a _____ unit run. 1 treads; 9” wide 11 treads; 9 ½” wide 12 treads; 9” wide 12 treads; 9 ½” wide

166 When laying out stringer using a framing square, the blade of the framing square represents the unit ______ and the tongue represents the unit _______. Run; rise Rise; run Run; stringer length Stringer length; run

167 When laying out stringer using a framing square, the blade of the framing square represents the unit ______ and the tongue represents the unit _______. Run; rise Rise; run Run; stringer length Stringer length; run

168 The maximum rise for a set of stairs without a landing is typically _______ feet.
9 10 12 15

169 The maximum rise for a set of stairs without a landing is typically _______ feet.
9 10 12 15

170 Tread run (unit run) is measured from the __________.
Face of one riser to the nosing of the next Face of one riser to the face of the next Top of one tread to the bottom of the next Subfloor to the top tread

171 Tread run (unit run) is measured from the __________.
Face of one riser to the nosing of the next Face of one riser to the face of the next Top of one tread to the bottom of the next Subfloor to the top tread

172

173 Keyhole Back Dovetail Coping
A hand saw hat is used for rough cutting , such as cutting access holes for piping and electrical boxes, is commonly called a __ saw. Keyhole Back Dovetail Coping

174 Keyhole Back Dovetail Coping
A hand saw hat is used for rough cutting , such as cutting access holes for piping and electrical boxes, is commonly called a __ saw. Keyhole Back Dovetail Coping

175 Installing ceiling tile Applying decking Applying roofing material
Which of the following tasks is commonly done with a power stapler but not with a power nailer. Installing ceiling tile Applying decking Applying roofing material Applying sheathing

176 Installing ceiling tile Applying decking Applying roofing material
Which of the following tasks is commonly done with a power stapler but not with a power nailer. Installing ceiling tile Applying decking Applying roofing material Applying sheathing

177 The edge shown below is known as a ___ cut.
Mortise Bevel Dado Chamfer

178 The edge shown below is known as a ___ cut.
Mortise Bevel Dado Chamfer

179 A portable circular saw has ___
A retractable upper blade guard Retractable lower and upper blade guards A retractable lower blade guard A fixed (non-adjustable) baseplate

180 A portable circular saw has ___
A retractable upper blade guard Retractable lower and upper blade guards A retractable lower blade guard A fixed (non-adjustable) baseplate

181 Constructing cabinets Installing finish work Installing insulation
Which of the following operations would normally be done using a pneumatic stapler rather than a nailer Constructing cabinets Installing finish work Installing insulation Installing framing

182 Constructing cabinets Installing finish work Installing insulation
Which of the following operations would normally be done using a pneumatic stapler rather than a nailer Constructing cabinets Installing finish work Installing insulation Installing framing

183 A small widely spaced Large, widely spaced Small, scissor-like
A circular saw blade designed for cutting plywood should have ___ teeth A small widely spaced Large, widely spaced Small, scissor-like Large, scissor-like

184 A small widely spaced Large, widely spaced Small, scissor-like
A circular saw blade designed for cutting plywood should have ___ teeth A small widely spaced Large, widely spaced Small, scissor-like Large, scissor-like

185 Block Jack Smoothing jointer
The hand plane that is generally used to plane long boards is the ___ plane. Block Jack Smoothing jointer

186 Block Jack Smoothing jointer
The hand plane that is generally used to plane long boards is the ___ plane. Block Jack Smoothing jointer

187 The main function of a router is to ___
Plane lumber Cut patterns in wood Cut metal Drill holes

188 The main function of a router is to ___
Plane lumber Cut patterns in wood Cut metal Drill holes

189 An auxiliary fence Hold-downs A miter gauge A push stick
You should always use ___ when using a table saw to rip boards less than 4” wide An auxiliary fence Hold-downs A miter gauge A push stick

190 An auxiliary fence Hold-downs A miter gauge A push stick
You should always use ___ when using a table saw to rip boards less than 4” wide An auxiliary fence Hold-downs A miter gauge A push stick

191 The sawbuck is generally used to ___
Cut dimension lumber to length Support lumber while it is being cut Cut wide moldings Do rip cuts

192 The sawbuck is generally used to ___
Cut dimension lumber to length Support lumber while it is being cut Cut wide moldings Do rip cuts

193 The tool shown below is a ___.
Adjustable T-square Sliding T-bevel Try square Speed square

194 The tool shown below is a ___.
Adjustable T-square Sliding T-bevel Try square Speed square

195 A type of cut often made with circular saw is called a ____ cut.
Reading Pocket Dado Rabbet

196 A type of cut often made with circular saw is called a ____ cut.
Reading Pocket Dado Rabbet

197 Transit level can be moved up and down
A major difference between a builder’s level and a transit level is that the ____. Transit level can be moved up and down Builder’s level can be used to plumb columns Transit level cannot be used to check elevations Transit level can only move in the horizontal plane.

198 Transit level can be moved up and down
A major difference between a builder’s level and a transit level is that the ____. Transit level can be moved up and down Builder’s level can be used to plumb columns Transit level cannot be used to check elevations Transit level can only move in the horizontal plane.

199 Sliding T-bevel Try square Miter square Speed square
A type of adjustable square that can be used to set, test, and transfer angles is called a ___ Sliding T-bevel Try square Miter square Speed square

200 Sliding T-bevel Try square Miter square Speed square
A type of adjustable square that can be used to set, test, and transfer angles is called a ___ Sliding T-bevel Try square Miter square Speed square

201 Spring Web Handscrew Quick
The ___ clamp is commonly used to secure round, oval, and oddly shaped work. Spring Web Handscrew Quick

202 Spring Web Handscrew Quick
The ___ clamp is commonly used to secure round, oval, and oddly shaped work. Spring Web Handscrew Quick