1 Port of Cape Town Development Plans
B2B NETWORKING FORUM 2016

2 10 Licenced Terminal Operators PORT OF CAPE TOWN AT GLANCE
PORT OF CAPE TOWN AT A GLANCE Break Bulk Multi Purpose Terminal Containers Liquid Bulk Terminals 10 Licenced Terminal Operators The National Ports Authority is a landlord Port Authority that provides port infrastructure and maritime-related services at the Port CAPE TOWN. Key business parameters : Total land area is 253 ha Water area is ha Rail tracks total 178 km The port has 42 berths The distance around the port is 20km. The port is protected by breakwaters which are 9.8 km Over 2776 commercial vessels call at the port last year. Approximately people enter the Port of Cape Town every day PORT OF CAPE TOWN AT GLANCE

3 PORT DEVELOPMENT FRAMEWORK PLANS
2016 PDFP Revision commenced as in accordance with the Port Act; PDFP on website and comments are due on 31st of August 2016 Link

4 PORT OF CAPE TOWN– ARTIST’S IMPRESSION CURRENT

5 PORT OF CAPE TOWN– ARTIST’S IMPRESSION FUTURE
Ship Repair Infill Cruise Terminal Burgan Cape Developments Container Terminal Expansion

6 CAPE TOWN CONTAINER TERMINAL
Capacity as at 2016 The Terminal Capacity (Landside) is TEU’s; Quay Side Capacity (Berth Capacity) is 1.4m TEU’s; There is urgency to increase Terminal Capacity to 1.4m TEU’s to demand by 2020 ( based on a 3 % Sustainable Growth Rate) Phase 2B Cape Town Container Expansion Project aims: To increase Terminal Capacity to TEU’s Progress: Project Team developing the Owners Requirement’s Specifications to define the requirements relevant to the execution of the project. Important issues to be considered: Adequate Vessel Turning circle within Ben Schoeman Dock Increase in size of vessels Progress: TNPA to complete Feasibility Study in March 2017 to adequately respond to these new demands.

7 BELCON SOLUTION VALUE PROPOSITION
Project Progress: Project Team identifying targeted customers to establish expectations. Project team to map out project plan in Phases (short, medium and long term); to be communicated to all stakeholders by October 2017.

8 CRUISE TERMINAL DEVELOPMENTS
A gateway to Africa, strategically situated between the West and East. An international tourism destination that will host unique lifestyle offering. V&A Waterfront is the appointed terminal operator Cruise Terminal Facility to be designed, constructed, developed and then operated and maintained, all in accordance with International Best Practice. Construction planned to finish December 2017

9 BURGAN CAPE TERMINALS Burgan Cape Terminals has been formed in response to the Government’s drive to strengthen the country’s security of fuel supply. Burgan Cape Terminals is a black-empowered, independent storage company. Signed a 20-year lease agreement with the Port of Cape Town. To create a major new storage and distribution facility at the Eastern Mole of the Port of Cape Town. It will comprise 118,000 m3 capacity, with a product portfolio including diesel, petrol, fame & ethanol for blending, and CF2. A major injection into the local economy of a projected R 650 million.

10 BURGAN CAPE TERMINALS Project Status:
12 Tanks to be constructed to ULP, ETHANOL and Diesel. Completion date: February 2017 Testing: March 2017 Operational: April 2017

11 CULEMBORG The precinct is planned as a mixed use precinct that promotes core back of port land uses in support of international competitiveness and growth. Owned by Transnet Property and extends to 160 ha. Site is substantially underutilised and represents an income generating opportunity for Transnet and great benefits for the local economy. Group Planning in the process of obtaining approvals to undertake further specialist studies and to establish a multi-representative steering committee (Transnet OD, City of Cape Town etc) to ensure sustainable development of the precinct.

12 CONCLUSION Transnet National Ports Authority, Port of Cape Town is committed to achieving Transnet’s strategic focus to be Agile (fit and focused) , Admired (trusted) , Digital (evolve or die), United (together). The Port of Cape Town strives towards being a Smart People’s Port through ensuring: Functional integration through interconnected systems: Smart Port: IPMS; Ops Centre’s. Improved public access and enhance the enjoyment and appreciation of the port environment: Port Festival; Training Centre. Plan for Public Access-Oriented Zones designed to be attractive, active, pedestrian-oriented environments and to promote port as a vibrant hub of diverse business opportunities. Potential Maritime Commercial developments ancillary to the Cruise Terminal and V&A Waterfront.

13