Download presentation
Presentation is loading. Please wait.
Published byVincent Andrews Modified over 8 years ago
1
© 2010 Bentley Systems, Incorporated John Whitmire Bentley’s AssetWise Solution Asset Lifecycle Information Management
2
© 2010 Bentley Systems, Incorporated 2 | WWW.BENTLEY.COM About Bentley Bentley’s mission is to empower its users to leverage information modeling through integrated projects for high-performing intelligent infrastructure.
3
© 2010 Bentley Systems, Incorporated 3 | WWW.BENTLEY.COM About Bentley 20 of the Top 20 in: –General Building –Transportation –Power Generation/Distribution –Manufacturing Facilities –Water –Sewer/Waste 19 of the Top 20 in: –Industrial Process/Petroleum –Telecommunications –Hazardous Waste 47 of the Top 50 Designers in International 97 of the Top 100 Pure Design Firms
4
© 2010 Bentley Systems, Incorporated 4 | WWW.BENTLEY.COM Includes Domain and Cross-functional Processes PlanDesignProcureBuildOperateMaintain Retire & Recycle Project Performance Management (PPM) Asset Performance Management (APM)
5
© 2010 Bentley Systems, Incorporated 5 | WWW.BENTLEY.COM Asset & Project Portfolio Info Management (APPIM) Asset Lifecycle Management - Spanning Project / Asset Cycles Asset Information Management (AIM) Project Information Management (PIM) Asset Lifecycle Information Management (ALIM) Source: ARC Advisory Group Information Management Strategies for Asset Lifecycle Management, January 2010 © 2010 ARC Advisory Group
6
© 2010 Bentley Systems, Incorporated 6 | WWW.BENTLEY.COM Asset & Project Portfolio Info Management (APPIM) Asset Lifecycle Management - Spanning Project / Asset Cycles Asset Information Management (AIM) Project Information Management (PIM) Asset Lifecycle Information Management (ALIM) Source: ARC Advisory Group Information Management Strategies for Asset Lifecycle Management, January 2010 © 2010 ARC Advisory Group
7
© 2010 Bentley Systems, Incorporated 7 | WWW.BENTLEY.COM Bentley Substation Solution
8
© 2010 Bentley Systems, Incorporated 8 | WWW.BENTLEY.COM Substation Design and Layout Bentley Substation V8 i Integrated electrical and physical design Single data model, database driven Protection and control schematics 3D physical design Error checking Lightning protection, grounding grid, and user- defined wire sag algorithms Automated documentation Supports collaborative environment
9
© 2010 Bentley Systems, Incorporated 9 | WWW.BENTLEY.COM Bentley Substation V8 i Ease of use –Now a stand-alone product MicroStation license not required –Improved user-interface Streamlines workflows Detailed documentation Reduce errors –Improved interconnect diagrams Terminal blocks and cables –Enhanced notification of wiring errors Eliminate repetitive tasks –Enhanced drawing and design Associated 3D model and 2D dynamic views Support transition from generic to manufacturer parts Intelligent workflow –Interoperability ProjectWise, i-models
10
© 2010 Bentley Systems, Incorporated 10 | WWW.BENTLEY.COM Key Technologies Cable and Raceway Management Civil and Structural Point Clouds and Raster for Brownfield Scenarios
11
© 2010 Bentley Systems, Incorporated 11 | WWW.BENTLEY.COM Design/Site Work Bentley PowerCivil V8 i (and others) Full survey package Digital terrain modeling Site modeling/design Access road layout and design Drainage design Water/sewer layout and profiling Point cloud viewing Integrated 2D and 3D CAD environment DTM exportable to Bentley Substation V8 i
12
© 2010 Bentley Systems, Incorporated 12 | WWW.BENTLEY.COM Design/Structural Analysis STAAD.Pro V8 i and ProStructure V8 i (and others) Flexible modeling environment Analyze and design any structure type Broad spectrum of design codes (70 international and 20 US codes) Internationalized (7 languages) Interoperable and open 2D and 3D modeling Based on standard CAD platforms
13
© 2010 Bentley Systems, Incorporated 13 | WWW.BENTLEY.COM 1 2 3 4 5 6 7 8 9 Bentley Solution for Substation Design ProjectWise Conceptual Design Initial designs that capture the fundamental components of the planned facility Design/ Estimate Electrical, physical, structural, comms, building design with cost estimates Commiss -ioning Design complete, equipment energized Site Prep/Const -ruction Civil works, cut/fill, grading, construction, fabrication O&M Operations and maintenance of facility: Document changes to original design to reflect as-builts Retrofit Retrofit existing substations to reflect the addition or replacement of equipment Approvals Internal and external, contractors Fabrication Procurement and equipment fabrication for structures, buswork, transformers, and protection and control Planning System analysis, capital requests, preliminary plans
14
© 2010 Bentley Systems, Incorporated 14 | WWW.BENTLEY.COM What is AssetWise? is an information modeling platform for delivering lifecycle information management to operators of infrastructure assets… a suite of trusted applications and on-line services to improve management and operational performance, safety and compliance of infrastructure assets.
15
© 2010 Bentley Systems, Incorporated 15 | WWW.BENTLEY.COM AssetWise Capabilities InformationModelingInformationModeling Linear Networks Spatial Networks Tagged Components Relationship Models Models & Drawings Documents Unstructured Data Point Clouds InformationIntegrityInformationIntegrity Permissions / Rights Role Management Change Management Relationship Management Audit Trails InformationConsumptionInformationConsumption Scanning / OCR Publishing Renditioning Printing External CMS / EDMS Industry Specific Applications Rail Decision Support Heavy Load Permitting Engineering Information Mgmt Performance Improvement CMMS User Created Applications Condition Monitoring Steelworks Permitting Road Safety Compliance Tracking ERP Other InformationApplicationsInformationApplications Configuration Management Records Management Requirements Management Document Control Knowledge Management Incident Management/ Corrective Action Work & Maintenance Management Support
16
© 2010 Bentley Systems, Incorporated 16 | WWW.BENTLEY.COM Infrastructure for Asset Operations Asset Lifecycle Information Management Project Design Optimization Design Optimization Document Approvals Document Approvals Analysis Project Engineering Projects Retrofit Improve Design Expand Renovate Upgrade
17
© 2010 Bentley Systems, Incorporated 17 | WWW.BENTLEY.COM Infrastructure for Asset Operations Project Design Optimization Design Optimization Document Approvals Document Approvals Analysis Project Asset Lifecycle Information Management Engineering Projects Retrofit Improve Design Expand Renovate Upgrade ERP Human Resources Finance Incident Management Requirements Management Requirements Management Engineering Maintenance Asset Operations Maintain Repair Compliance Safety Inspect Replace
18
© 2010 Bentley Systems, Incorporated 18 | WWW.BENTLEY.COM Infrastructure for Asset Operations Project Design Optimization Design Optimization Document Approvals Document Approvals Analysis Project Asset Lifecycle Information Management Platform (eB – enterprise Bridge) Asset Lifecycle Information Management Platform (eB – enterprise Bridge) Engineering Projects Retrofit Improve Design Expand Renovate Upgrade ERP Human Resources Finance Incident Management Requirements Management Requirements Management Engineering Maintenance Asset Operations Maintain Repair Compliance Safety Inspect Replace
19
© 2010 Bentley Systems, Incorporated 19 | WWW.BENTLEY.COM Infrastructure for Asset Operations Safety Inspect Replace ERP Human Resources Finance Incident Management Requirements Management Requirements Management Engineering Maintenance Asset Operations Maintain Repair Compliance ProjectWise Integration Server AssetWise Data Quality Services AssetWise Data Quality Services Asset Lifecycle Information Management Platform (Single Source of Truth) Asset Lifecycle Information Management Platform (Single Source of Truth) Design Optimization Design Optimization Document Approvals Document Approvals Data Analysis & Loading Data Analysis & Loading ProjectWise Integration Server Engineering Document Management Engineering Collaboration Design Application Configuration AssetWise Data Quality Services Data Quality Analysis Milestone Data Loads from Design
20
© 2010 Bentley Systems, Incorporated 20 | WWW.BENTLEY.COM Infrastructure for Asset Engineering and Operations ProjectWise Integration Server AssetWise Data Quality Services Asset Lifecycle Information Management Platform Design Optimization Design Optimization Document Approvals Document Approvals Data Analysis & Loading Data Analysis & Loading ProjectWise Integration Server Engineering Document Management Engineering Collaboration Design Application Configuration AssetWise Data Quality Services Data Quality Analysis Milestone Data Loads from Design i-Model 2D/3D + data from multiple sources Contains full knowledge of origin + evolution Requires no application logic to display OpenPlant AutoPLANT PDS PlantSpace Bentley Substation Design Tools of Choice Legacy data not lost Re-Tool when the time is right Reduce time to innovation …
21
© 2010 Bentley Systems, Incorporated 21 | WWW.BENTLEY.COM Trusted Information AssetWise, through the eB (enterprise Bridge) engine provides the means to ensure trusted information is available across the enterprise where, when and to who it is required. AssetWise solutions are about… –Delivering trustworthy information To COMPLY, CONFORM, and OPERATE –Optimizing process and communication efficiency –Minimizing business risk –Reducing the cost of meeting compliance requirements
22
© 2010 Bentley Systems, Incorporated 22 | WWW.BENTLEY.COM Ensuring Information Trustworthiness Identification and Classification –What is it? Relationships/Links/Context –What is it for? Responsibility –Who owns/uses/needs it? Control of Change –Who can change what? Where are all copies? –What is the impact, cost and scope of change? –What/who/when changed? People Requirements Projects Change Requirements Organizations Documents Location Distribution Order Drawing
23
© 2010 Bentley Systems, Incorporated 23 | WWW.BENTLEY.COM AssetWise Core Services Document Management Requirements Management Tagged Item Management Records Management Change Management
24
© 2010 Bentley Systems, Incorporated 24 | WWW.BENTLEY.COM Effect of Reduced Information Integrity Source: ICM - Based on 8 data sets used in series and each data set at an integrity level varying from 75% to 100% When Information integrity drops 8% - Employee effectiveness drops 50%
25
© 2010 Bentley Systems, Incorporated 25 | WWW.BENTLEY.COM Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Arch. Eng. System A Component A1 Comp A2 Comp A3 Comp A3.1 Comp A3.2 System N P&IDs System A Equipment #A1 Equipment #A2 Equipment #A3 Equipment #A3.1 Equipment #A3.2 System N SpecificationInspectionPurchase Order Work Instructions Procedures People Contract Standard Fed CodesIndustry Regs Ref. Docs Standards Committee Regulatory AgencyArch. Eng.Owner Federal Org Req. 1 Req. 1.1 Req. 1.2 Req. 1.3 Req. 1.3.1 Req. 1.3.2Req. N Sub Contractor REQUIREMENTS Req.1. 2 KNOWLEDGE ITEM PROJECT BUDGET Milestone 1.1 DESIGN Comp A2 System N W B S Milestone 1.1 Phase N Equipment #A2 EQUIPMENT What’s the issue?
26
© 2010 Bentley Systems, Incorporated 26 | WWW.BENTLEY.COM Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Arch. Eng. System A Component A1 Comp A2 Comp A3 Comp A3.1 Comp A3.2 System N P&IDs System A Equipment #A1 Equipment #A2 Equipment #A3 Equipment #A3.1 Equipment #A3.2 System N SpecificationInspectionPurchase Order Work Instructions Procedures People Contract Standard Fed CodesIndustry Reg Ref. Docs Standards Committee Regulatory AgencyArch. Eng.OwnerFederal Org Req. 1 Req. 1.1 Req. 1.2 Req. 1.3 Req. 1.3.1 Req. 1.3.2Req. N Sub Contractor Requirements Req.1. 2 Knowledge Item Project t Budget Milestone 1.1 Plant Design Comp A2 System N W B S Milestone 1.1 Phase N Equipment #A2 Equipment Impact of Change
27
© 2010 Bentley Systems, Incorporated 27 | WWW.BENTLEY.COM Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Arch. Eng. System A Component A1 Comp A2 Comp A3 Comp A3.1 Comp A3.2 System N P&IDs System A Equipment #A1 Equipment #A2 Equipment #A3 Equipment #A3.1 Equipment #A3.2 System N SpecificationInspectionPurchase Order Work Instructions Procedures People Contract Standard Fed CodesIndustry Regs Ref. Docs Standards Committee Regulatory AgencyArch. Eng.Owner Federal Org Req. 1 Req. 1.1 Req. 1.2 Req. 1.3 Req. 1.3.1 Req. 1.3.2Req. N Sub Contractor REQUIREMENTS Req.1. 2 KNOWLEDGE ITEM PROJECT BUDGET Milestone 1.1 PLANT DESIGN Comp A2 System N W B S Milestone 1.1 Phase N Equipment #A2 EQUIPMENT What’s the issue? 27
28
© 2010 Bentley Systems, Incorporated 28 | WWW.BENTLEY.COM Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Arch. Eng. System A Component A1 Comp A2 Comp A3 Comp A3.1 Comp A3.2 System N P&IDs System A Equipment #A1 Equipment #A2 Equipment #A3 Equipment #A3.1 Equipment #A3.2 System N SpecificationInspectionPurchase Order Work Instructions Procedures People Contract Standard Fed CodesIndustry Reg Ref. Docs Standards Committee Regulatory AgencyArch. Eng.OwnerFederal Org Req. 1 Req. 1.1 Req. 1.2 Req. 1.3 Req. 1.3.1 Req. 1.3.2Req. N Sub Contractor REQUIREMENTS Req.1. 2 KNOWLEDGE ITEM PROJECT BUDGET Milestone 1.1 PLANT DESIGN Comp A2 System N W B S Milestone 1.1 Phase N Equipment #A2 EQUIPMENT Impact of Change 28
29
© 2010 Bentley Systems, Incorporated 29 | WWW.BENTLEY.COM Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Phase 1 Milestone 1.1 Phase N Milestone 1.2 Milestone 1.3 Arch. Eng. System A Component A1 Comp A2 Comp A3 Comp A3.1 Comp A3.2 System N P&IDs System A Equipment #A1 Equipment #A2 Equipment #A3 Equipment #A3.1 Equipment #A3.2 System N SpecificationInspectionPurchase Order Work Instructions Procedures People Contract Standard Fed CodesIndustry Reg Ref. Docs Standards Committee Regulatory AgencyArch. Eng.OwnerFederal Org Req. 1 Req. 1.1 Req. 1.2 Req. 1.3 Req. 1.3.1 Req. 1.3.2Req. N Sub Contractor REQUIREMENTS Req.1. 2 KNOWLEDGE ITEM PROJECT BUDGET Milestone 1.1 PLANT DESIGN Comp A2 System N W B S Milestone 1.1 Phase N Equipment #A2 EQUIPMENT Impact of Change 29
32
© 2010 Bentley Systems, Incorporated 32 | WWW.BENTLEY.COM Configurable Business Process Automation 32 | WWW.BENTLEY.COM
33
© 2010 Bentley Systems, Incorporated 33 | WWW.BENTLEY.COM 33
34
© 2010 Bentley Systems, Incorporated 34 | WWW.BENTLEY.COM AssetWise & Field Mobility Applications
35
© 2010 Bentley Systems, Incorporated 35 | WWW.BENTLEY.COM Visual Report with AssetWise
36
© 2010 Bentley Systems, Incorporated 36 | WWW.BENTLEY.COM AssetWise Information Management Configuration Control Controlled Docs Records Management Engineering Design Corrective Action Human Performance Knowledge Management Asset Maintenance Collaboration Human Resources Program Management UsersLegacy Enterprise Users Collaboration Visibility Information Quality Compliance Governance Change Control Enterprise Citizenship Financials
37
© 2010 Bentley Systems, Incorporated 37 | WWW.BENTLEY.COM eB: An Enterprise Citizen Implementation and integration of a number of fleet-wide applications:
38
© 2010 Bentley Systems, Incorporated 38 | WWW.BENTLEY.COM CI Audit CI Status Reports CI Change Control CI Baselines CI Breakdown Structure Configuration Items (AKA Information Assets) Scope Book WBS Costs Schedule Reqmts Risk Docs RFI EAR EBOM MBOM BPM Compentency System OBS Commitments Register Scope Book WBS Costs Schedule Reqmts Risk Docs RFI Engineering Asset Register Engineering Bill of Materials Manufacturing Bill of Materials Business Process Modeling Compentency System OBS Commitments Register MS Access/eB MicroStation/ProjectWise SQL/eB SAP/RIB P6 DOORS ARM Documentum/eB PTR MS Access/eB TBD/eB Igrafx TBD SQL/eB TBD eB Data Integration Most Valuable Enterprise Information Only Most Valuable Enterprise Information CMII-100B ISO10007 Yellow Book To provide visibility on the current status of any information asset – is it current, is it undergoing change? Change Implementation Plan Change Validation & Release Change Review/Impact Analysis Change Control Process Change Request Change Request A N Other Update Process eB Workflow Implemented Order to Implement Enterprise Information Management (aka Enterprise Configuration Management)
39
© 2010 Bentley Systems, Incorporated 39 | WWW.BENTLEY.COM eB Footprint Across a Fleet of Assets
40
© 2010 Bentley Systems, Incorporated 40 | WWW.BENTLEY.COM Key Industries Served – sample customer listing Nuclear Fuel Services, Inc.
41
© 2010 Bentley Systems, Incorporated Thank you for your time.
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.